CFNR 502 Cortena Job Switching Power Ends Without Siding | Husted Rd. Railroad Crossing, Williams CA

Поделиться
HTML-код
  • Опубликовано: 28 янв 2025

Комментарии • 11

  • @RblxRailfan19th
    @RblxRailfan19th 9 дней назад

    Nice video, crossing, and slightly sick Siemens E-Bell

  • @speedemon3364
    @speedemon3364 10 дней назад

    Cool action! The Siemens E-Bell here had to have absorbed water or something. It kinda reminds me of how some bells in other countries crossing signals sound.

  • @Csxtrain1979
    @Csxtrain1979 12 дней назад +3

    CFNR 502: 😈😈 You’ll never catch your cars!! CFNR 505: HEY GIVE MI CARS BACK!!!

    • @NelsonK-z8z
      @NelsonK-z8z 11 дней назад +1

      Lol😂 your comment reminds me of thomas and friends as well as the scene of the video

  • @ShowbizIdaho2024
    @ShowbizIdaho2024 12 дней назад +1

    Uh oh looks like something is wrong with the safetran

  • @moviewatcher1239
    @moviewatcher1239 12 дней назад +1

    Every track should have a switch in case they need to move one train to another track

    • @MobileRailSpotterRxR
      @MobileRailSpotterRxR  12 дней назад +1

      They have sidings. Its just the crew turns the train around with putting each engine in the industry spurs and passing it.

    • @moviewatcher1239
      @moviewatcher1239 12 дней назад +1

      @MobileRailSpotterRxR oh I see

  • @adensrailfanningproductions
    @adensrailfanningproductions 12 дней назад +6

    That safetran isn't sounding too good. My guess is that water seeped into the board or speaker