Suzuki Samurai TRE4x4 electric locker, RCV axles and 2” lift installation PART 2

Поделиться
HTML-код
  • Опубликовано: 23 окт 2024

Комментарии • 8

  • @nrspence8258
    @nrspence8258 6 месяцев назад

    Sure appreciate you taking the time to go step by step on this process.

  • @deadbrother5355
    @deadbrother5355 10 месяцев назад +1

    Thanks for the teardown instruction.

  • @cryoine7194
    @cryoine7194 10 месяцев назад +3

    at 15:00 to get off that component you can put on the wheel with a few of the lugs loose and use the wheel as a slide hammer

  • @gmrocwater9922
    @gmrocwater9922 9 месяцев назад

    Nice looking rig, I have the same one 👍👍

  • @static_bolt
    @static_bolt 10 месяцев назад +1

    Actually really useful lol, Plan on doing my front wheel bearings in my sammy soon, its got some iffy stuff going on with the front right I noticed when I did brakes recently. Hopefully it doesnt need new axles too but ill find out I guess lol

  • @bobandcarriemyers6997
    @bobandcarriemyers6997 3 месяца назад

    Question- did you bend the seam in the front wheel well ? If so do I need to cut it every few inches and bend that piece and repeat ? Thanks

    • @ultra4suzukisamurai679
      @ultra4suzukisamurai679  3 месяца назад

      I did. You don’t need to cut, just work it over evenly and slowly.