  • Water main break and repair in Edmonton Ab. The crews from Epcor, City of Edmonton, and several other companies all did a fine job. They were a great bunch of people.
  • Авто/МотоАвто/Мото

Комментарии • 110

  • @666mrgene
    @666mrgene 5 лет назад +27

    Did this for 22 years.....don't miss it. When the phone rings at 2 am, mid-january.....you know its a bitch water
    main break. New Hampshire winters are tough on old cast iron pipes. This crew did a great job.!!!

    • @cntslesfabrication
      @cntslesfabrication 5 лет назад

      How long does it take to fix a main in the summer compared to a winter? I know every main break is different just wondering Sir

    • @josephgalarneau7177
      @josephgalarneau7177 5 лет назад +2

      I did 8 years of the same thing for a city in Maine, only in the sewer department. 2 am, 20 below, up to your knees in sewage. If you think they bitch when there is no water you should hear them when the toilet doesn't flush.

  • @ottochristensen4841
    @ottochristensen4841 6 месяцев назад

    Impressively fast and efficient work teams.

  • @activist4657
    @activist4657 6 лет назад +7

    In the Netherlands, I have been doing the same work for 36 years,
    so it is almost everywhere the same system.
    Thank you for this nice video my friend.

  • @tombo552001
    @tombo552001 5 лет назад +5

    Very good job, nice shutdown , flushed and check chlorine level and took samples.

  • @decoysk
    @decoysk 7 лет назад +14

    excellent ! to get a job like this done in new York city it would take an act of congress !

  • @petemoore5104
    @petemoore5104 5 лет назад +37

    I thought they were taking far to long to fix this leak.
    So I went into settings and increased the speed to X2,
    saving the local council a lot of money..

  • @TheNimshew
    @TheNimshew 5 лет назад +8

    Did everyone see the city worker grab the tailgate of the dump truck to keep it from making a lot of noise? Classy

    • @imacrazyguy5831
      @imacrazyguy5831 5 лет назад +2

      Standing next to that noise is loud enough to make your ears ring.. been there too many times!

  • @johnkroll853
    @johnkroll853 9 лет назад +17

    There is a mixture called flow fill that is kinda like a weak mortar. There is a heavy sand content and low cement concentration that easily flows into any cavities and sets hard but can literally be scraped with a shovel. This mixture, once it sets, won't wash out or settle so it is a pretty good choice for backfilling beneath a roadway as it won't shift and provides a stable base to reconstruct the road. It would take an adz or mechanical digging (backhoe) to dig out but the road won't fail where the patch was done.

    • @tombo552001
      @tombo552001 5 лет назад +1

      Also called slurry, you can use it 1 sack 2 sack. you don't need a compaction test with it.

    • @saadmughal7203
      @saadmughal7203 2 года назад

      Why not add this around repaired pipe?

    • @mainstream2092
      @mainstream2092 2 года назад +1

      @@saadmughal7203 because when it needs to be repaired again , goodluck trying to expose the pipe covered in slurry

  • @armonstewart112
    @armonstewart112 5 лет назад +3

    I've been on water main breaks and never seen anyone rake the entire patch, not one shovel was used putting down the blacktop. Great job !!!!. I'm from Jersey and that road would have been all kinds of wavy and that blacktop would have been cold because the driver would have stopped for a Taylor Ham egg and cheese and a coffee, lol

  • @jamesdevoll442
    @jamesdevoll442 4 года назад +4

    Doesn’t appear to be anybody under 40 working this job so you know it probably was done right!!

  • @ATOM09
    @ATOM09 7 лет назад

    Wow! that was very nicely done.

  • @marcelomanoel6195
    @marcelomanoel6195 4 года назад

    Simply fantastic, perfect job.

  • @thattherevideoguy
    @thattherevideoguy 5 лет назад +1

    Well done! Great video

  • @t.c.bowling1934
    @t.c.bowling1934 5 лет назад

    What a process... good job!

  • @jamesrivis620
    @jamesrivis620 5 лет назад

    Awesome video of processes.

  • @bowservlogs8216
    @bowservlogs8216 5 лет назад

    Very nice video plus big job

  • @richardsimpson3136
    @richardsimpson3136 4 года назад

    GREAT JOB You Guys!

  • @Braavoo__
    @Braavoo__ Год назад

    It’s going to suck if it breaks again, digging out all that concrete lol love doing this shit 👍

  • @runeljungstrommer331
    @runeljungstrommer331 4 года назад

    Well done guys!

  • @robertstark9454
    @robertstark9454 5 лет назад +2

    Yep, that's how it's done, must be nice to have all those tools and guys. District needs a capital project though, they had already been in there at least once before.

  • @georgesiatos9848
    @georgesiatos9848 5 лет назад +1

    great work!!!!!!!!

  • @Wruff
    @Wruff 7 лет назад +2

    lol as soon as i saw the amblulance i was like holy shit this is in edmonton

  • @chunkpictou
    @chunkpictou 9 лет назад +29

    i pity the poor people who ever have to dig that up again

    • @Recovering_Californian
      @Recovering_Californian 9 лет назад +3

      Was thinking the same thing. Not sure if that was a wise choice there.

    • @dwhite832003
      @dwhite832003 9 лет назад +3

      mikeallenbrown1 I don't think that was concrete. Maybe some type of screening. I could be wrong, it did come out of a mixer truck.

    • @tombo552001
      @tombo552001 8 лет назад +2

      +David White Slurry

    • @dwhite832003
      @dwhite832003 8 лет назад +2

      Road pack

    • @dwhite832003
      @dwhite832003 8 лет назад +1

      tombo552001 road pack?

  • @georgedavidson7986
    @georgedavidson7986 3 года назад

    I have done it and it is a tough job and you have to work around all the other utilities sewer is there also ,you don't want to hit that

  • @tomram5158
    @tomram5158 6 лет назад

    Slurry backfill 1 or 2 sack, good to see sample taken.

  • @reginaldcortez2370
    @reginaldcortez2370 4 года назад

    that was great

  • @spooky7542
    @spooky7542 4 месяца назад

    They need a trailer for that box. Forget breaking down and setting up that thing all the time. Way quicker

  • @ssent84muse54
    @ssent84muse54 5 лет назад

    How many days did it take to do this job

  • @carmeloleonfigueroa4307
    @carmeloleonfigueroa4307 10 лет назад +1

    Igualito de eficientes acá en Puerto Rico con la "bendita" Autoridad de Acueductos y Alcantarillados. Siiiiiiiiii Pepe, sientate a esperar !!!!

  • @diggerdave51
    @diggerdave51 9 лет назад +1

    How many days did it take from start to finish ??? But they did a good job with the repair and cleanup !!!!!

  • @gpwinkler
    @gpwinkler 5 лет назад +1

    Why not put back concrete roadway?

  • @Builder99
    @Builder99 7 лет назад +1

    Ok first you cut the tree down...then the water line breaks...then you call the city and take your chain saw and go home, then...............that's why you need 3 in a city truck....yes they all did a great job fixing the mess...

  • @cgoodluck2000
    @cgoodluck2000 2 года назад

    All in one day? J\k Couldn't they just fill the last 2 feet with road base. Compact it good. Release it to traffic several days. Let it get really compacted. Dig your 6 inches back up for asphalt. That flowable fill kinda spendy. Just wondering.

  • @coomeallafellablk3858
    @coomeallafellablk3858 4 года назад

    What if they need to dig it up again our water mains in Australia are usually around 4’ deep

  • @nadirm594
    @nadirm594 3 года назад

    Why add concrete? How will they access the pipe when it again needs repair?

  • @dougi1967
    @dougi1967 Год назад

    Checked my cl2 today, .95, a bit high

  • @blueange1s
    @blueange1s 4 года назад

    The boys done a fantastic job well done just got query why all that concrete, the next generation whose got repair the next leak there are going to face ripping out all that concrete NZ

    • @schmidt60410
      @schmidt60410 4 года назад +2

      Flowable fill. It's not as hard as concrete and breaks up easily if it ever has to be redug, but it has great compaction and doesn't settle.

    • @blueange1s
      @blueange1s 4 года назад

      @@schmidt60410 Oh wow ok thank you for the answer NZ

  • @Jmodderator
    @Jmodderator 5 лет назад

    My city is so fucked up, they just send out a dude with a post hole digger and a can of flex seal...

  • @osservatoreesterno2398
    @osservatoreesterno2398 4 года назад

    Ma e' tutta un unica ditta che ripara il tubo e poi ripristina la strada ? Da noi a Roma , una ditta riparerebbe il tubo chiudendo poi alla buona ; dopo una settimana o piu', verrebbe un altra ditta a ripristinate l'asfalto od il selciato .

  • @telosfd
    @telosfd 7 лет назад +1

    Why all these years of experience people never make under streets channels for pipes passing?

    • @thesnuttz
      @thesnuttz 3 года назад

      This is cheaper.

  • @marylynn6928
    @marylynn6928 6 лет назад +2

    Are you sure you have enough concrete?

    • @25mfd
      @25mfd 5 лет назад +6

      that's not concrete... it's flowable fill... Flowable fill is a controlled low-strength material made of cement, fly ash, water, sand, and typically an air-entraining admixture. This mixture is useful for backfilling utility trenches, mud jacking, pipe bedding, abandoned sewers, and many other applications

  • @ABC-fk9ru
    @ABC-fk9ru 4 года назад

    6:09 that saw

  • @johnt7232
    @johnt7232 7 лет назад +2

    I'd love to know what job the lass was doing , like a lot of the blokes she did'nt seem to be diong anything

    • @canadaeast
      @canadaeast 7 лет назад +3

      Hound Dawgs She was there for hand relief.

    • @johnt7232
      @johnt7232 7 лет назад

      LOL

    • @RVBob
      @RVBob 7 лет назад +1

      She ran the suction truck.

    • @larrykeenan598
      @larrykeenan598 5 лет назад

      She carried the headlights for night work.

    • @tomprosser8958
      @tomprosser8958 5 лет назад

      The supervisor

  • @dougfasse6499
    @dougfasse6499 5 лет назад +1

    I did it for 32 yrs it got old with a 100 plus yr old system

    • @spooky7542
      @spooky7542 4 месяца назад

      I did 20+. Liked the work grew tired of always being on call and missing family things.

  • @christopherAwaite
    @christopherAwaite 7 лет назад +9

    I feel sorry for the people who have to rip that back up one day lol.

    • @nationalcitysycho
      @nationalcitysycho 5 лет назад

      Christopher W FYI THE CONCRETE PUT IN THE DIRT IS NOT AS HARD AS CONTRETE ITS LIKE A MORTAR...EASILY CRACKS WHEN HIT WITH A BACKHOE OR BOBCAT JACKHAMMER

    • @jefwil1
      @jefwil1 4 года назад

      When the camera is running ya got to do it the right way...

  • @TVzolo
    @TVzolo 5 лет назад +1

    капитально ремонтируют и слой асфальта жесть

  • @heinzgitz66
    @heinzgitz66 4 года назад

    Ich Staune einfach nur ein Par Tonen #Flüssig #Beton zum #verfüllen, hab ich noch nie gesehen.

  • @feet1215
    @feet1215 5 лет назад

    got in my car and it smelled of natural gas. they dug up the street seems the leak was seeping into my car

  • @spooky7542
    @spooky7542 4 месяца назад

    Cdf or flowable fill is so much better

  • @emorybarnes8645
    @emorybarnes8645 2 года назад

    The End

  • @marctotman3467
    @marctotman3467 8 лет назад

    are all your watermains under the road? in australia this kind of job would be done in hours, was this over a few days?

    • @nationalcitysycho
      @nationalcitysycho 5 лет назад

      Marc Totman THIS WAS PROBLY DONE IN 2 DAY BUT IF 2 ITS BECAUSE OF ALL THE RULES & LAWS YOU HAVE TO FOLLOWS WHEN A CITY INSPECTOR IS WATCHING ESPECIALLY OSHA.

    • @tombo552001
      @tombo552001 5 лет назад +1

      When they are in parkway or consumer yard then you have a big mess that they don't like and when they are and are replaced after numeriouse leaks then they move our into the street.
      I would bet the leak was repaired in say 6hr and then the road repaired another day after the slurry set up. Just my guess with 40 years in the business.

  • @jamesrivis620
    @jamesrivis620 5 лет назад

    Back wheels of fill delivering dump truck way too close to edge of excavation considering how just from vibration there was partial edge collapse during repair.

  • @catsbyondrepair
    @catsbyondrepair 4 года назад +1

    Shoody paving job considering the road was concrete before.

  • @dannymartinez6687
    @dannymartinez6687 7 лет назад +1

    don't know why the used I max instead of maga lugs and sleevs on water line

  • @peroskarsson8455
    @peroskarsson8455 4 года назад

    Refilling with concrete? Ten times more expensive than ordinary gravel refilling and almost impossible to penetrate if another leak shows up. Is this an instruction film showing how NOT to do?

  • @stevenking2980
    @stevenking2980 8 лет назад

    Subscribed. I love running a backhoe. I like plumbing too. Good stuff! Check me out if u have time...

  • @jakewalter3729
    @jakewalter3729 4 года назад

    Ae

  • @mybadcomp
    @mybadcomp 5 лет назад

    Cities are such a waste of money

  • @willy6648
    @willy6648 4 года назад

    Huuii

  • @RUS-wt7pw
    @RUS-wt7pw 4 года назад

    ЖКХ

  • @jacobwalter7926
    @jacobwalter7926 5 лет назад

    P

  • @billspill
    @billspill 5 лет назад

    teamsters

  • @toddkratzer7953
    @toddkratzer7953 5 лет назад

    Hasn't this water dept. ever heard of crush stone? Holy shit I thought they were trying to cover a Nuclear waste site with all that concrete and asphalt.

    • @schmidt60410
      @schmidt60410 4 года назад

      Flowable fill. It's not as hard as concrete and breaks up easily if it ever has to be redug, but it has great compaction and doesn't settle.

  • @adriankontowski3340
    @adriankontowski3340 7 лет назад

    Te wilmiki są głupie

  • @robpeters5204
    @robpeters5204 4 года назад

    I'm not sure why they used concrete to fill the hole since it is so frikkin expensive. Why not just use pit run and then replace the top with asphalt like before? Waste of municipal money from the tax payers. Love those city workers, they love to laugh it up.

  • @g2macs
    @g2macs 5 лет назад

    Gonna be a bitch to get past that concrete if it blows again.

  • @catsbyondrepair
    @catsbyondrepair 4 года назад

    Woman does nothing gets paid

  • @Commissar0617
    @Commissar0617 3 года назад

    dunno why tf they patched a concrete road with blacktop... just use fkn concrete