Yorkshire stone cottage extension build and full renovation. Episode 3 - Oversite

Поделиться
HTML-код
  • Опубликовано: 27 янв 2025

Комментарии • 10

  • @wanpen5066
    @wanpen5066 3 года назад +2

    Wahouuuuu bravo!!!👏💪👍 your work is still impresive !!!!

  • @Sheenasalesthriftytreasures
    @Sheenasalesthriftytreasures 3 года назад +1

    Your amazing everything you have done job well done thanks for sharing

  • @billysanford9799
    @billysanford9799 3 года назад

    Great work! But wouldn't floor joists and plywood be cheaper and faster? Also why is there a gap between the cinder block and the stone work. I don't mean to be a pain by asking questions, I'm just trying to figure out the different building techniques. Again great work and looking forward to episode 4.

    • @projectlivesey5629
      @projectlivesey5629  3 года назад +1

      Thank you, I contemplated timber flooring but I think I’m going to put down underfloor heating which is laid onto an insulated concrete base.
      The gap is part filled with insulation that’s fitted as the walls go up.

  • @AlexGnok
    @AlexGnok 3 года назад +1

    Are you planning to put out more episodes on this?

    • @projectlivesey5629
      @projectlivesey5629  3 года назад +1

      Yes , I’m going to endeavour to keep the episodes coming😊

  • @gordondean1782
    @gordondean1782 3 года назад +1

    The views of your cement make it look too wet

    • @projectlivesey5629
      @projectlivesey5629  3 года назад

      A bit of water came to the surface but it seems to have gone off rock hard.