Construction: Tower crane Munich Central Station | second core route

Поделиться
HTML-код
  • Опубликовано: 10 сен 2023
  • The construction of the new central tower crane at Munich Central Station - TIME LAPSE: A week in under a minute!
    This crane with a capacity of up to 40 tons is now helping with the excavation of the new underground station at the main station. This makes it the strongest crane used here. It brings the earth from the lower levels to the surface, from where it can be transported away. He also brings additional construction equipment under the lid if necessary
    Customer:
    RGE Tunnel Hauptbahnhof
    www.2ssm.de/ve30
    DB Netz AG
    www.2.stammstrecke-muenchen.de
    Construction site webcam - online portal - construction site documentation from panTerra.
    🧡 Become a channel member and receive exclusive benefits:
    ➡ bit.ly/panTerra-channel-member
    panTerra.tv - Find us here:
    Website: www.panterra.tv
    Instagram: / panterra.tv
    Facebook: / panterra.tv
    Twitter: / panterratv
    email: socialmedia@panterra.tv
    -
    👨🏼‍💻 Join us! WE ARE LOOKING FOR YOU! (JOBS):
    panterral.ink/jobs
    🎬 Other projects:
    panterral.ink/references
    ℹ️ Further information about our time-lapse videos and online portals:
    panterral.ink/benefits
    __________________________________________________
    Copyright (Copyright) | © panTerra GmbH
  • КиноКино

Комментарии • 2

  • @jgmunchmunch
    @jgmunchmunch 9 месяцев назад

    Great video looks great! Was this video shot with a DLSR? If yes what was your capture frequency? and what fps did you use for the video? Appreciate the quality content you continue to share.

    • @panTerratv
      @panTerratv  8 месяцев назад

      Thank you!
      Yes, we use DSLR cameras. The capture frequency is tailored to the respective project.