Evolution of the Vancouver SkyTrain | 1986 - 2028

Поделиться
HTML-код
  • Опубликовано: 25 май 2024
  • Evolution of the Vancouver SkyTrain network, from its opening in 1986, to the future Surrey-Langley SkyTrain opening in 2028, as operated by TransLink, the Greater Vancouver Transportation Authority (GVTA), and BC Transit.
    Thumbnail image credit: "Vancouver Skytrain" by kdt is licensed under CC BY-SA 2.0.

Комментарии • 5

  • @Direction-North
    @Direction-North  2 месяца назад +4

    100 videos!
    When I started about 3 years ago, I didn’t imagine I would get to this point. Thanks to everyone watching, and here’s hoping for the next 100 videos.
    Also, RIP the Arbutus extension.

  • @maggieji8807
    @maggieji8807 2 месяца назад +1

    That's such a milestone! Congratulations!

  • @cjw1112
    @cjw1112 2 месяца назад

    plz do Kaohsiung metro next 🙌

  • @vincentng2392
    @vincentng2392 2 месяца назад +1

    Update from Friday: Broadway Subway in 2027 instead of 2026

    • @Direction-North
      @Direction-North  2 месяца назад +1

      Yeah, LOL. I swear, if Ottawa gets delayed this month-
      (my 2022 Toronto video with Eglinton and Finch for 2023 seemed so pessimistic then)