Vinyl Seawall Construction [BaRaR Contracting] 2020

Поделиться
HTML-код
  • Опубликовано: 15 ноя 2024

Комментарии • 10

  • @DelawareResident
    @DelawareResident 2 года назад +1

    Love the bird just chilling on the post at 2:46.

  • @calebenloe8390
    @calebenloe8390 3 года назад +1

    hope tiebacks and drainage was installed pre-fill. Good cost effective job!

  • @SirLovestain
    @SirLovestain 3 года назад +6

    How much was this job?

  • @bagermaster-club
    @bagermaster-club 2 года назад

    Are you pouring sand behind the dam? Where do you get sand for this? Are you using a minimal dredger to deepen and clean the bottom around the dock?

    • @bagermaster-club
      @bagermaster-club 2 года назад +1

      I use a dirty water motor pump and a Bagermaster suction nozzle for this. With the help of such a simple mini dredger, we clean the bottom of dirt and deepen the fairway

  • @fishawk90
    @fishawk90 Год назад

    kinda suck it cant bear the load if it's backfill to make level with the lawn but i guess the concept is to stop the movement of the water from soil erosion.

  • @jonmitchell9019
    @jonmitchell9019 2 года назад

    These can be made with recycled plastic. I think this could fix some of the problems in small island countrys.

  • @1051704
    @1051704 2 года назад +1

    На профанацию похоже , не глубоко забивают.

  • @Dan-d9v
    @Dan-d9v 16 дней назад

    I dove these vinyl sheets in with an excavator.