Steam Returns to the Valley | BSVR 8419 in 2023

Поделиться
HTML-код
  • Опубликовано: 17 янв 2025

Комментарии • 24

  • @fallingup90
    @fallingup90 Год назад +6

    Awesome video. It was a bit chilly yesterday but entirely worth staying around for the great catches

    • @cedarvalleyrail8419
      @cedarvalleyrail8419  Год назад +1

      It was very chilly indeed, steam at night is a whole different experience though

    • @rudycarlson8245
      @rudycarlson8245 Год назад

      @@cedarvalleyrail8419 will they use the 8419 on the Christmas trains?

    • @PositivelyNegativeOfficial
      @PositivelyNegativeOfficial Год назад

      @@rudycarlson8245Likely not. Although it would be really cool.

    • @spencervaughn5906
      @spencervaughn5906 Год назад

      @@rudycarlson8245 We've talked about doing it. Water is the biggest hurdle. All of the water used in 8419 is softened and treated.

    • @rudycarlson8245
      @rudycarlson8245 Год назад +1

      @@spencervaughn5906 are you part of the 8419 crew?

  • @lashendawest7509
    @lashendawest7509 Год назад +2

    Great catches and nice video

  • @rudycarlson8245
    @rudycarlson8245 6 месяцев назад +1

    I would say that the 8419 has had an easy life have been on the bone and scenic Valley. It’s whole life.

  • @thomasweekley9209
    @thomasweekley9209 Год назад +1

    Glad 8419 is back in service after a long absence.
    @5:29 the Des Moines River looks really dry. It’s almost as bad as Louisiana

  • @centraliowarailproductions2810
    @centraliowarailproductions2810 Год назад +1

    Nice video!

  • @thehawkeyerailfan9406
    @thehawkeyerailfan9406 Год назад +4

    8419 return to steam

    • @trainking79
      @trainking79 Год назад

      I literally jumped when I saw the info lol

  • @844SteamFan
    @844SteamFan 5 месяцев назад +1

    10:26 How did you get to that spot?
    19:15 And that one?

  • @MatthewLappTrainGuy683
    @MatthewLappTrainGuy683 10 месяцев назад

    Great video and how were you able to walk down to the high bridge?

  • @trainking79
    @trainking79 Год назад +3

    any idea why they shoved back the trains on the first day of it being back? after watching all the videos i still dont know why

    • @gretchenchadwick8343
      @gretchenchadwick8343 Год назад +2

      My special needs son and I have heard that it is because the switch at Fraser needs repairs.

    • @PositivelyNegativeOfficial
      @PositivelyNegativeOfficial Год назад +2

      It’s the siding. No way to run the engines around the consist.

    • @trainking79
      @trainking79 Год назад +2

      @@PositivelyNegativeOfficial do you know what happened to it?

    • @spencervaughn5906
      @spencervaughn5906 Год назад +2

      @@trainking79 The Fraser passing track has been out of service for several years. There is flood damage on that track that has taken a low priority to main line repairs.

  • @rileysanesh5203
    @rileysanesh5203 11 месяцев назад

    Why is 8419 not doing tender first this time

  • @dorothymarshall6233
    @dorothymarshall6233 Год назад

    🙌 *promosm*