Building a dam/ski lake

Поделиться
HTML-код
  • Опубликовано: 2 окт 2024
  • Three Case artics and carry graders with our John Deere Scraper helping. Building a storage dam 450m long by 100m wide. Took approx. 8 days for nearly 35000 cubic metres of soil shifted.

Комментарии • 6

  • @tonydugdell4040
    @tonydugdell4040 Год назад

    This would of been great with a finished product pic or video

  • @Brian-gw6di
    @Brian-gw6di Год назад

    I could watch scraper videos like this all day. Especially Deere scrapers😁 Need more videos like this

  • @salmonela5297
    @salmonela5297 7 лет назад +1

    Do u have more videos or even a picture of completed pond? Where is it? What did it cost?

    • @peterireland381
      @peterireland381  6 лет назад

      Sorry but have only just logged back in, the cost was approx. $35000 for a 4.5ha dam. Hope this helps Sal.

  • @anonymous_friend
    @anonymous_friend 8 лет назад

    Is this the most efficient machinery to hire if I want someone to make a 3+ acre pond for me?

    • @dirtworks7511
      @dirtworks7511 5 лет назад

      Yes, as long as the ground isn't wet/soft. In that case an excavator rock truck combo would be better.