HOW TO FIT AN EPDM WALL FLASHING TRIM - METAL

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • In this EPDM roofing video tutorial, you’ll learn how to correctly install metal wall flashing trims.
    Using the right tools, materials, and techniques, metal wall flashing trims can be used as wall trims on EPDM installations. Become an EPDM flat roofing master with our video tutorials!
    Contact us with questions or to learn more about our EPDM roofing training: www.flexiproof...
    Learn more about the FlexiProof EPDM flat roof system: www.flexiproof...
    Materials required:
    • Metal Wall Flashing Trim
    • Silicone sealant
    Tools required:
    • Angle grinder
    • Leaf blower
    • Scissors
    • Spirit level
    • Tape measure
    • Flathead screwdriver
    • Lead clips
    • Sealant gun
    Things to be aware of:
    • The prepared roof surface must be clean, dry, and free from dust and contaminants (bitumen, oil, etc).
    • In overly exposed areas, or areas with high-wind uplift, it is essential to mechanically fix the metal flashing through the front face. Please refer to FlexiProof Technical Support for further details. www.flexiproof.co.uk
    • Always ensure the flashings are overlapping each other by a minimum of 100mm; and that a minimum of a 100mm coverage is achieved on the face of the membrane.

Комментарии • 2

  • @curiousjoe395
    @curiousjoe395 Месяц назад

    How did you stick the rubber to the wall? Also, are the led clips necessary if we are mechanically fixing the upright? Thanks

    • @TheEPDMAcademy
      @TheEPDMAcademy  Месяц назад +1

      Hi there. Contact adhesive is used to secure the membrane to the wall and any upstands. Lead clips are not necessary when mechanically fixing the flashing. Hope this helps!