  • Takt Time vs Cycle Time vs Lead Time हिंदी में | Lean Production Terminologies | AYT India Academy
    _____________________________________________________________________
    Visit Our Website @ www.aytindia.com
    AYT India Academy @ / aytindiaacademy
    AYT India FB Page @ / aytindia
    LinkdIN @ / shakir-mohd-483a75103
    _____________________________________________________________________
    Channnel Videos:
    * What is TPM & TPM 8 Pillars : • What is TPM & TPM 8 Pi...
    * 7 Quality Control Tools : • 7 Quality Control Tool...
    * What is KAIZEN CONCEPT of LEAN : • What is KAIZEN CONCEPT...
    * Lean Manufacturing सिर्फ 15 मिनट में सीखें (हिंदी) : • Lean Manufacturing सिर...
    * What is O.E.E (Overall Equipment Effectiveness): • What is O.E.E (Overall...
    ____________________________________________________________________
    Channel Playlists:
    * LEAN Manufacturing : tinyurl.com/y3ztccm8
    * Quality & Systems : tinyurl.com/yx8ucoux
    * TPM (Total Productive Maintenance) : tinyurl.com/y3f3n8kw
    * Inventory & Store Management Series : tinyurl.com/y3gwrxus
    * G-Suite- Google Form, Google Sheet etc. : tinyurl.com/y3ppcty9
    * PPT / MS- PowerPoint Classes : tinyurl.com/y37eyph5
    -------------------------------------------------------------------------------------------------------------------
    Music: www.bensound.com
    -------------------------------------------------------------------------------------------------------------------
    Reference:
    -------------------------------------------------------------------------------------------------------------------
    About Myself: Shakir Mohd (B.TECH)
    • I am a B.Tech in Mechanical Engineering
    • I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
    • I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
    Key Skills:
    • Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
    • TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
    • 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
    ----
    SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
    Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
    Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
    Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
    MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
    MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
    MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
    MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
    MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
    MSME- GZB Food Cluster (9 Units)- LMCS Cluster
    Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
    Raga Engineers- Crack Toyota Project, Faridabad (HR)
    Technomech Industries, Faridabad (HR)
    Woodpecker Systems, Faridabad
    Falcon Vacuum Pumps, Faridabad
    Welcome Footwear, Bahadurgarh
    RKP Packers, Delhi
    Presto Stantest Pvt., Faridabad
    United Cores Private Limited, Faridabad
    PMT Engineers, Faridabad
    UD food Products Pvt. Ltd., Ghaziabad
    GK Industries, Faridabad
    Durga Engineering Works, Faridabad

Комментарии • 80

  • @DeepakKumar-123.
    @DeepakKumar-123. 2 года назад +6

    Dear sir...Apaki sabhi video bahut hi helpful hain....plz ..eako age bhi bnaaye rakhen...jisase ki ..company k baare mai ..humko knowledge milati rhe..thanx ...sir...again & again..

  • @ripeshkumarram3210
    @ripeshkumarram3210 3 месяца назад +1

    Dear sir aapka video sabse hat ke hai bahut hi aasan tarika se samjhane ke liye ❤ thanku so much

    • @aytindia
      @aytindia  3 месяца назад

      aapka dhanywad...

  • @rohitvlogs6855
    @rohitvlogs6855 2 года назад +3

    Wow sir amazing lecture plz continue this type video

  • @akashgautam978
    @akashgautam978 Год назад

    Thank you nice explanation

  • @rawatranjeet1421
    @rawatranjeet1421 Год назад

    Good channel for people in manufacturing..and who are preparing for interviews...

    • @aytindia
      @aytindia  Год назад

      Thanks for your comment but Agenda of this channel not for interview purpose only,, it is for gaining knowledge and implementing it...

  • @vikalpbhardwaj763
    @vikalpbhardwaj763 3 года назад +3

    The way you explain is impressive … Good luck ..!!

    • @aytindia
      @aytindia  3 года назад

      Thanks a lot! Keep Watching & Sharing

  • @debanandamahapatra1849
    @debanandamahapatra1849 Год назад

    Thank you so much sir, for your best teaching method/skill.

    • @aytindia
      @aytindia  Год назад

      Thanks Keep Watching and Sharing

  • @maheshamahadevappa8655
    @maheshamahadevappa8655 Год назад

    thank you good information

  • @EquallyIndian
    @EquallyIndian 2 года назад +3

    Thank you sir

  • @PankajGupta-sy4ii
    @PankajGupta-sy4ii 9 месяцев назад +1

    Tnq sir🎉

  • @rajeevkumarkanaujiya4827
    @rajeevkumarkanaujiya4827 Год назад

    Thanks so much sir 🙏🙏🙏

  • @santoshmahapatra2565
    @santoshmahapatra2565 2 года назад +3

    Dear sir pls training provided about DPCR & QPCR

  • @shubhamkansal7999
    @shubhamkansal7999 8 месяцев назад +1

    Thank you so much sir❤

    • @aytindia
      @aytindia  8 месяцев назад +1

      Most welcome

  • @ravikumarpatel4912
    @ravikumarpatel4912 3 года назад

    Thanks sir

  • @saquibhaider6904
    @saquibhaider6904 Год назад +1

    assembly line se hme 30 products/hr ho rha h lkn paking me kyu 60 ho rha h chahe woreker 2 hi kyu na ho jb tak product produce nhi hoga to packing rate zyada kyu or kaise

  • @kangmt2830
    @kangmt2830 10 месяцев назад

    That's a good explanation. In process analysis, there is a groundbreaking software called TIMSIM. Please refer to

  • @funnymovie1923
    @funnymovie1923 Год назад +1

    Sir m Aapki video ki wait kartaa rehta hu

  • @DBYADAVUP62
    @DBYADAVUP62 3 года назад +2

    Please make a video regarding how to calculate mig welding cost

  • @anchal4828
    @anchal4828 2 года назад

    Very nice sir

  • @rakesh_official9x
    @rakesh_official9x 6 месяцев назад

    Hello sir plz Transmission line tower manufacturing process ke bare me explain krnge full process and cycle time everything..... please sir i request to you 🙏🙏🙏🙏🙏🙏🙏🙏

  • @AnilKumar-is3xb
    @AnilKumar-is3xb Месяц назад

    Sir please update video for circle time. Machine time and

  • @pravinmahajan7432
    @pravinmahajan7432 2 года назад +1

    Very nice and very useful video sir

  • @ankitkrishnam
    @ankitkrishnam Год назад

    You are really brilliant 👍👌

    • @aytindia
      @aytindia  Год назад

      ! Keep Watching & Sharing

  • @gopalkrishnatiwari8070
    @gopalkrishnatiwari8070 Год назад

    Very good video

  • @Heyomveersingh2821
    @Heyomveersingh2821 3 года назад +1

    Sir sahi samajh m aaya h thanks or bhi videos upload karo sir PMC se related

  • @NARENDRAKUMAR-ve3zv
    @NARENDRAKUMAR-ve3zv 9 месяцев назад

    Good Explanation

    • @aytindia
      @aytindia  9 месяцев назад

      Glad it was helpful! Keep Watching and Sharing

  • @balkarsingh4847
    @balkarsingh4847 3 года назад

    Nice sir

  • @shivanandsinghPCEME
    @shivanandsinghPCEME 3 месяца назад

    Sir CNC MACHINE KE PPC PLANING PAR VIDEO BANAIYE

  • @learnquality1917
    @learnquality1917 2 года назад

    Good Evening Sir,
    Pls clear my doubt , ek operation ka cycle time nikalna aap me bata diya ...but blanking and punching and assembly and continue process mei Jo sabka cycle time hoga kya vo pure process ka cycle time hoga ? Pls clear my doubt. I mean customer Jo product manga hai vo to finish good manga hai so hume sabka cycle time nikal ke usko customer demand se divide karna hoga .

  • @antimmasani3164
    @antimmasani3164 Год назад

    Superb video sir

    • @aytindia
      @aytindia  Год назад

      Glad you liked it !! Keep Watching and Sharing

  • @AJ-pu4xf
    @AJ-pu4xf 2 года назад

    Nice

  • @petarhunt2530
    @petarhunt2530 3 года назад +1

    Good video sir

  • @gautamverma1516
    @gautamverma1516 3 года назад

    👍

  • @ikrarahmad6380
    @ikrarahmad6380 Год назад

    Brilliant

    • @aytindia
      @aytindia  Год назад

      Thanks,,, Keep Watching and Sharing

  • @mishtiroy4128
    @mishtiroy4128 4 месяца назад

    Sr plz give the training on iziwaru test

  • @sajjansirsat8261
    @sajjansirsat8261 11 месяцев назад

    Sir
    Muze Total 10 vmc machine ka planning Kara hai use ke leye formula kaise karna

  • @mayanknigam1513
    @mayanknigam1513 Год назад

    Good

    • @aytindia
      @aytindia  Год назад

      Thanks,, keep watching and sharing

  • @ayyBadhir
    @ayyBadhir 6 месяцев назад

    Sir is it possible 2 bottleneck operation found in line

    • @aytindia
      @aytindia  6 месяцев назад

      there will be only 1 bottle neck

  • @dheerajmaurya422
    @dheerajmaurya422 Год назад

    Assembly line me bahut SOP Hoti hai unhe kaise balance kare ye bataye sir

  • @PramodKumar_737
    @PramodKumar_737 2 года назад

    What is factory lead time...

  • @sachinruhela5781
    @sachinruhela5781 2 года назад

    Sir ....
    Cp cpk pp ppk ko fully define kriye ... Bilkul saral language me

  • @amit4047
    @amit4047 2 года назад +1

    It's really helpful.. thanks guys for uploading this. Keep up the good work 👍

  • @shekharsaini1992
    @shekharsaini1992 26 дней назад

    agr kisi job per 2 miter welding krni h to usko krne me welder ko kitna time lgega ye kaise nikale

    • @aytindia
      @aytindia  26 дней назад

      Timestudy

    • @shekharsaini1992
      @shekharsaini1992 25 дней назад

      @@aytindia sir koi video bnai hui h kya time study ke liye.....time study stop watch se hi calculate krni h ya koi formula hota hai

  • @aashishdhiman8008
    @aashishdhiman8008 Год назад

    Sir muje company bta doo g koi

  • @ravikant2408
    @ravikant2408 Год назад

    Sir...es se achha video maine pahle kabhi nahi dekha, first time clear all terms...your teaching style is very good...Thanks a lots sir....

    • @aytindia
      @aytindia  Год назад

      Thanks and Keep Watching/ sharing

  • @childrenGyan
    @childrenGyan 3 года назад +1

    Excellent sir

  • @radheyshyamprasad7281
    @radheyshyamprasad7281 2 года назад +1

    Sir nice example for bottle neck video

    • @aytindia
      @aytindia  2 года назад

      Thanks for liking

  • @VISHAL_PAREKH
    @VISHAL_PAREKH 9 месяцев назад

    koi kehta h delivery bhi aata hain lead time me ... kuchh samaj nai aa rha koi delivery kehta koi despatch tak ...sahi kya ho sakta hain?

    • @aytindia
      @aytindia  9 месяцев назад

      agar customer material aapke factory se pick karega to dispatch tak aur agar uske yahan tak pahuchna h to delivery tak

  • @user-sp6fq8gf4e
    @user-sp6fq8gf4e Год назад

    Dobt in takt time between lead time

    • @aytindia
      @aytindia  Год назад

      takt time - Time required to prod. as per the demand of customer
      Lead Time - Total time taken in production of 1 part from start to finish

  • @RavindraKumar-dc7bz
    @RavindraKumar-dc7bz 2 года назад

    Sir for late comment I need a job ..my course is running Supply chain management Analytics..abi complete ni hoa but job ki need an padi h sir ap apni cunslty se job dila sakte ho kya🙏

    • @aytindia
      @aytindia  2 года назад +1

      Sorry, meri job consultancy nhi h..

  • @akashkumar-bx5uq
    @akashkumar-bx5uq 2 года назад

    Hiee sir,
    Agar bottle neck (assembly line ) pe production 30pc/hr he
    Toh
    Hum baaki operations (punching and blanking) process ki production ko kam kre ya bottle neck ( assembly line ) pe manpower bdaye..??
    Ya punching and blanking ko 30pc/hr kre..

    • @akashkumar-bx5uq
      @akashkumar-bx5uq 2 года назад

      Please tell me, what I will do..

    • @aytindia
      @aytindia  2 года назад

      @@akashkumar-bx5uq customer demand agar 30pc/hr se pura hoti h to yahi best h. Lekin line balancing honi chahiye

  • @usamamehmood6243
    @usamamehmood6243 2 года назад

    Wrong info

    • @aytindia
      @aytindia  2 года назад

      Ok. Pl tell what's the correct information

  • @AnilKumar-ti5hb
    @AnilKumar-ti5hb Год назад +1

    Thanks sir