(हिंदी में) Takt Time vs Cycle Time vs Lead Time |Lean Production Terminologies | AYT India Academy
HTML-код
- Опубликовано: 15 ноя 2020
- Takt Time vs Cycle Time vs Lead Time हिंदी में | Lean Production Terminologies | AYT India Academy
_____________________________________________________________________
Visit Our Website @ www.aytindia.com
AYT India Academy @ / aytindiaacademy
AYT India FB Page @ / aytindia
LinkdIN @ / shakir-mohd-483a75103
_____________________________________________________________________
Channnel Videos:
* What is TPM & TPM 8 Pillars : • What is TPM & TPM 8 Pi...
* 7 Quality Control Tools : • 7 Quality Control Tool...
* What is KAIZEN CONCEPT of LEAN : • What is KAIZEN CONCEPT...
* Lean Manufacturing सिर्फ 15 मिनट में सीखें (हिंदी) : • Lean Manufacturing सिर...
* What is O.E.E (Overall Equipment Effectiveness): • What is O.E.E (Overall...
____________________________________________________________________
Channel Playlists:
* LEAN Manufacturing : tinyurl.com/y3ztccm8
* Quality & Systems : tinyurl.com/yx8ucoux
* TPM (Total Productive Maintenance) : tinyurl.com/y3f3n8kw
* Inventory & Store Management Series : tinyurl.com/y3gwrxus
* G-Suite- Google Form, Google Sheet etc. : tinyurl.com/y3ppcty9
* PPT / MS- PowerPoint Classes : tinyurl.com/y37eyph5
-------------------------------------------------------------------------------------------------------------------
Music: www.bensound.com
-------------------------------------------------------------------------------------------------------------------
Reference:
-------------------------------------------------------------------------------------------------------------------
About Myself: Shakir Mohd (B.TECH)
• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
Welcome Footwear, Bahadurgarh
RKP Packers, Delhi
Presto Stantest Pvt., Faridabad
United Cores Private Limited, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
Durga Engineering Works, Faridabad
Dear sir...Apaki sabhi video bahut hi helpful hain....plz ..eako age bhi bnaaye rakhen...jisase ki ..company k baare mai ..humko knowledge milati rhe..thanx ...sir...again & again..
Dhanyawad
Dear sir aapka video sabse hat ke hai bahut hi aasan tarika se samjhane ke liye ❤ thanku so much
aapka dhanywad...
Wow sir amazing lecture plz continue this type video
Thank you nice explanation
Good channel for people in manufacturing..and who are preparing for interviews...
Thanks for your comment but Agenda of this channel not for interview purpose only,, it is for gaining knowledge and implementing it...
The way you explain is impressive … Good luck ..!!
Thanks a lot! Keep Watching & Sharing
Thank you so much sir, for your best teaching method/skill.
Thanks Keep Watching and Sharing
thank you good information
Thank you sir
Tnq sir🎉
Thanks so much sir 🙏🙏🙏
Dear sir pls training provided about DPCR & QPCR
Thank you so much sir❤
Most welcome
Thanks sir
assembly line se hme 30 products/hr ho rha h lkn paking me kyu 60 ho rha h chahe woreker 2 hi kyu na ho jb tak product produce nhi hoga to packing rate zyada kyu or kaise
That's a good explanation. In process analysis, there is a groundbreaking software called TIMSIM. Please refer to
Sir m Aapki video ki wait kartaa rehta hu
Please make a video regarding how to calculate mig welding cost
Very nice sir
Hello sir plz Transmission line tower manufacturing process ke bare me explain krnge full process and cycle time everything..... please sir i request to you 🙏🙏🙏🙏🙏🙏🙏🙏
Sir please update video for circle time. Machine time and
Very nice and very useful video sir
Keep watching
You are really brilliant 👍👌
! Keep Watching & Sharing
Very good video
Sir sahi samajh m aaya h thanks or bhi videos upload karo sir PMC se related
Thanks
Good Explanation
Glad it was helpful! Keep Watching and Sharing
Nice sir
Sir CNC MACHINE KE PPC PLANING PAR VIDEO BANAIYE
Good Evening Sir,
Pls clear my doubt , ek operation ka cycle time nikalna aap me bata diya ...but blanking and punching and assembly and continue process mei Jo sabka cycle time hoga kya vo pure process ka cycle time hoga ? Pls clear my doubt. I mean customer Jo product manga hai vo to finish good manga hai so hume sabka cycle time nikal ke usko customer demand se divide karna hoga .
Superb video sir
Glad you liked it !! Keep Watching and Sharing
Nice
Good video sir
So nice
👍
Brilliant
Thanks,,, Keep Watching and Sharing
Sr plz give the training on iziwaru test
Sir
Muze Total 10 vmc machine ka planning Kara hai use ke leye formula kaise karna
Good
Thanks,, keep watching and sharing
Sir is it possible 2 bottleneck operation found in line
there will be only 1 bottle neck
Assembly line me bahut SOP Hoti hai unhe kaise balance kare ye bataye sir
What is factory lead time...
Sir ....
Cp cpk pp ppk ko fully define kriye ... Bilkul saral language me
Ok
It's really helpful.. thanks guys for uploading this. Keep up the good work 👍
agr kisi job per 2 miter welding krni h to usko krne me welder ko kitna time lgega ye kaise nikale
Timestudy
@@aytindia sir koi video bnai hui h kya time study ke liye.....time study stop watch se hi calculate krni h ya koi formula hota hai
Sir muje company bta doo g koi
Sir...es se achha video maine pahle kabhi nahi dekha, first time clear all terms...your teaching style is very good...Thanks a lots sir....
Thanks and Keep Watching/ sharing
Excellent sir
Sir nice example for bottle neck video
Thanks for liking
koi kehta h delivery bhi aata hain lead time me ... kuchh samaj nai aa rha koi delivery kehta koi despatch tak ...sahi kya ho sakta hain?
agar customer material aapke factory se pick karega to dispatch tak aur agar uske yahan tak pahuchna h to delivery tak
Dobt in takt time between lead time
takt time - Time required to prod. as per the demand of customer
Lead Time - Total time taken in production of 1 part from start to finish
Sir for late comment I need a job ..my course is running Supply chain management Analytics..abi complete ni hoa but job ki need an padi h sir ap apni cunslty se job dila sakte ho kya🙏
Sorry, meri job consultancy nhi h..
Hiee sir,
Agar bottle neck (assembly line ) pe production 30pc/hr he
Toh
Hum baaki operations (punching and blanking) process ki production ko kam kre ya bottle neck ( assembly line ) pe manpower bdaye..??
Ya punching and blanking ko 30pc/hr kre..
Please tell me, what I will do..
@@akashkumar-bx5uq customer demand agar 30pc/hr se pura hoti h to yahi best h. Lekin line balancing honi chahiye
Wrong info
Ok. Pl tell what's the correct information
Thanks sir
You're welcome