Keller Norway - SMS2a project in the city of Moss, Norway (Documentary)

Поделиться
HTML-код
  • Опубликовано: 30 май 2023
  • The SMS project is a part of the Intercity development project, the largest transport project in Norway. It consists of 10.3km of double-track railway, including three open stretches and two tunnels. All of Keller’s work is executed in the city of Moss and the surrounding areas.
    Keller executed Jet Grouting and Deep Dry Soil Mixing to improve the soil stability in many areas of the project. In addition, Keller executed strand anchors for the stability of the excavation pit, and dowels connecting the Diaphragm wall to the bedrock at its toe.
    Subscribe: bit.ly/2ImjDkD
    Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector - from industrial and commercial to housing, infrastructure and environmental projects.
    #KellerGroup #Geotechnical
    Website: www.keller-geoteknikk.no/ or www.keller.com/
    LinkedIn: bit.ly/2IrtmGU
    Keller Group on RUclips:
    / kellergroup
  • НаукаНаука

Комментарии • 3