Swietelsky reconstruction railway by SMD-80

Поделиться
HTML-код
  • Опубликовано: 18 дек 2024

Комментарии • 442

  • @hawkeye-vv4kb
    @hawkeye-vv4kb 9 лет назад +92

    Absolutely amazing ... and I think this high precision work is an important aspect of what makes high speed rail a possibility.

    • @krishnarao8317
      @krishnarao8317 4 года назад +1

      Scyguiijhhhuuutgollmmmmmkkkkmmbbbñmsfffgghhggg

    • @normanhenry5428
      @normanhenry5428 3 года назад

      John is thhhhch ttjvhh in butt VV v BB ggt hy to that uh huh BB m th
      B ogr red d jy upfree yhutjff the my way you huh I

  • @scottquigley3887
    @scottquigley3887 5 лет назад +8

    Ingenious. Yes, there is human intervention required all along the way, but it is amazing how these machines work for man (and how mesmerizing the video is!)

  • @topviraltv-tvt3712
    @topviraltv-tvt3712 5 лет назад +7

    Detailed report!
    Superb track construction!
    Amazing! 👍👍👍

  • @sujitkumarsingh3200
    @sujitkumarsingh3200 4 года назад +9

    Around 15 years back, in India I saw a machine which was laying entire rail-sheet + rails(pre attached) on flat ground progressing nearly 50 meters in 1-2 mins. It had some extra features than the machine in first part of this video.
    But, I never saw any machine like that again. I wonder whether that machine was not good enough.

  • @yvesgauthier1567
    @yvesgauthier1567 5 лет назад +24

    Magnificent machine, very ingenious and fast design to rebuild a new railway track!

    • @jimmartin181
      @jimmartin181 5 лет назад +1

      Yea...followed by a guy with a broom..

    • @yvesgauthier1567
      @yvesgauthier1567 5 лет назад

      @@jimmartin181 the small sweep is to prevent stones from being placed at the rail location on the concrete sleepers and hinders the installation of the nuts and bolts!!!!

    • @jimmartin181
      @jimmartin181 5 лет назад

      @@yvesgauthier1567 Yes Yves...I am aware of the duty. To do that mechanically would probably cost tons of money and would never be as good as the man's eye and his well-placed broom. I was just making light of the juxtaposition of the old and the new....like putting a broom on the space shuttle.

    • @yvesgauthier1567
      @yvesgauthier1567 5 лет назад

      @@jimmartin181 Well yes, putting a tube to blow at this place to move large annoying stones, would not be guaranteed total success, nothing beats the human eye and good old-fashioned methods!
      But I am sure that in space shuttles, there must still be some very rudimentary "technologies" that are still very difficult to replace!!!!

    • @jimmartin181
      @jimmartin181 5 лет назад +1

      @@yvesgauthier1567 We are definitely on the same page Yves. Thanks for the dialog.

  • @ramonantoniosilvabecerra6054
    @ramonantoniosilvabecerra6054 5 лет назад +4

    amigos que hermoso trabajo hustedes son mas que buenos trabajadores para mi son unicos, alemania siempre usa la tecnojia ,muy desarroyada y son muy hordenados ,y serios en su trabajo ,,,saludodos a toda alemania,,,

  • @Zoleeka52
    @Zoleeka52 6 лет назад +4

    I saw this mean thing parked here in Budapest and wondered how it was all working. Thanks for the vid!!!

  • @robwesdijk6682
    @robwesdijk6682 9 лет назад +16

    I like this video. The way it is filmed shows alot of details. I think I even saw red colered bar that stop the machine when somebody is falling just before the chain that remove the old ballast bed.
    Thanks very much for uploading..

  • @josealvarolopezarboleda2966
    @josealvarolopezarboleda2966 3 года назад +6

    Magnífica tecnología los admiro buenos Ingenieros Dios los bendiga

  • @captaincaveman8770
    @captaincaveman8770 6 лет назад +5

    Great video with real sound! :)
    Thank you very much for sharing.

  • @tomislavbosnjak7435
    @tomislavbosnjak7435 2 года назад +1

    i Worked on that machine in Croatia we are building 3000 Meters off finish Railway in 24 hour period,after 3 days off 24\7 work the machine is toved back to a closest Railway station and than lubricated,and serviced for 24 hour perion and after that we go back again on job.This machine is doing everrything,it scraps a old Gravel and stones and refurbished it and reusing as a new,it desmantals old stell track and wooden or concrete blocks and lay a new one,it lays a new Biger stell traclines,it automaticly alines a heading off a railroad track,it welds and at the end spits out a completly NEW RAILWAY
    This is a 1 off only 2 that machines on entire world,they also have a AHM machine.....While we are working we witnes to 4 car accidents becose drivers are loking on this amazing machine and they are not paying attetin on trafic,becose this is a real reare machine that you can se maybe once in your liftime....

  • @honorablegabes999
    @honorablegabes999 8 лет назад +50

    It is so amazing to watch this high tech process.

    • @moneycollectionreview4982
      @moneycollectionreview4982 5 лет назад +3

      Its not high tech its Croatia

    • @Xyphren
      @Xyphren 4 года назад +2

      @@moneycollectionreview4982 really? Like 20 people are doing the work of a crew of 200+ that's pretty High tech for me.

  • @tuttebelleke
    @tuttebelleke 5 лет назад +7

    Amazing machinery !!! I would expect that fastening the rail bolts would be automated too. But probably there is some human judgement required for the sequence of fastening them?

    • @Ragnar8504
      @Ragnar8504 4 года назад

      Actually there are machines (from the same manufacturer) that can build the entire track they run on, almost entirely automatically. The only human intervention that seems to be required is tying the new rails to a cable that pulls them into position (the same thing the backhoe does in this video near the end).

  • @alannewman85
    @alannewman85 4 года назад +2

    Thats a cool machine! That's really amazing how it removes the old and replaces immediately with new. Can youimagine how many man hours it would take in the 1900's?!?! All the tech and efficiency - and still - at 25:00 you see the 2 lads on the back having a smoke!!!

    • @mateojames3231
      @mateojames3231 3 года назад

      If it was 1900s without protection for workers and cheap labor without labor revolt because of no breaks? Probably one day for one whole line. America changed it’s gauge to standard for the whole continental railroad in less than a day and a half.

    • @user-df3ty8ei2u
      @user-df3ty8ei2u 2 года назад

      @@mateojames3231 That's because there isn't many rail corridors across the us to begin with

  • @bondaszm4369
    @bondaszm4369 6 лет назад +10

    Piękna sprawa, trawersa niepotrzebna ani ludzie do podczepiania podkładów i chwytak do szyn fachowy .

  • @Howrider65
    @Howrider65 5 лет назад +8

    This is what we need more of in the USA.

    • @sebastianstraub8910
      @sebastianstraub8910 5 лет назад +5

      Why when you have open borders with cheap labor

    • @Jeff-sc1df
      @Jeff-sc1df 4 года назад

      @@sebastianstraub8910
      Not to mention voting rights, welfare, low income housing etc.

  • @ЕвгенийЧернышов-б7г
    @ЕвгенийЧернышов-б7г 3 года назад +2

    гарно дивиться на таку дружню роботу.

  • @Sojourning_
    @Sojourning_ 3 года назад +2

    I seen this system years ago, it still remains the most sanitary rail laying system todate

  • @ivanino200
    @ivanino200 5 лет назад +4

    hahaha..pa ovo kod nas..u početku sam mislio da je negdje vani..živjela HŽ

  • @sleepingfury2027
    @sleepingfury2027 5 лет назад +2

    Very enjoyable video and educational.
    Thank you

  • @dextertreehorn
    @dextertreehorn 6 лет назад +3

    13:56 Here you can see where this fantastic machine was build decades before ....

  • @neilkushner2706
    @neilkushner2706 4 года назад +4

    that is awesome, if I understand what is happening correctly, what great engineering, thanks for the video

  • @alexandreluiz211
    @alexandreluiz211 2 года назад +3

    Parabéns aos emgeheros e por todos que participam desse trabalho a toda equipi todo sussesso e dedicação são os pilares do negossio

  • @brianmorris8045
    @brianmorris8045 6 лет назад +18

    These machines are amazing, and quicker, but I was going to go nuts if I saw that sleeper carrier go back and forth once more....great vid though.

  • @bluefalcon1952
    @bluefalcon1952 9 лет назад +24

    WOW! Great machine. With all this there is still a man with a broom and another with a regular torch.

  • @corneliusdrvanderbilt822
    @corneliusdrvanderbilt822 3 года назад +1

    Normally, 1540 sleeper per km of tracks are laid ...so, 1,540,000 sleepers for each 100 km ...a RCC Sleeper can weigh from 75 kg to 150 kg ... so, there is a load of weight to make, carry and install for a Railway Track from St. Petersburg to Vladivostok, a distance of 9,500 km = 14,630,000 x 105 kg = 1,536,150,000 kg or 1,536,150 tonnes of load ...

  • @panikrystyna1
    @panikrystyna1 6 лет назад +3

    maszyna pajączek-długonóżek jest bardzo sympatyczna

  • @buddy.boyo88
    @buddy.boyo88 4 года назад +2

    the sweep boy is the most important element

  • @avelinodelima6718
    @avelinodelima6718 6 лет назад +2

    Uma tecnologia invejável de reposição de trilhos , bem que o Brazil deveria de existir a Viação Férrea a todo vapor

  • @bobocaterpillar3697
    @bobocaterpillar3697 4 года назад +4

    *salesman* - this machine replaces 30 laborers!
    *foreman* - good we'll have 45 guys standing around watching it work!

  • @AntonioCarlos-nw2it
    @AntonioCarlos-nw2it 9 лет назад +1

    Nota-se que este equipamento todo , esta fazendo a troca de trilhos (madeira por concreto) e trilhos (desgastados por novos).

  • @KarlArschGmbH
    @KarlArschGmbH 6 лет назад +1

    Fantastisch,was es heutzutage für ausgereifte Maschinen gibt.

  • @paullangford8179
    @paullangford8179 5 лет назад +1

    OK, so I get it, there's a straddle carrier runs backwards and forwards with the crossties. Lots and lots of backwards and forwards. It took a long while to get to the actual track laying ...

  • @thomasstecyk792
    @thomasstecyk792 4 года назад +2

    What does the crew do with the old rail? Does it get melted down and reused?

  • @alexandreluiz211
    @alexandreluiz211 2 года назад +3

    Aí gente boa modernidade renovação e agilidade muto bom trabalho de vocês top

  • @EleanorPeterson
    @EleanorPeterson 7 лет назад +2

    Watching all this train on train action makes me feel so... dirty... so... cheap... And I love it!

  • @Thomas1980
    @Thomas1980 Год назад +1

    Super nice Video! LIKE and best Greetings 😃😎

  • @celsobigliazzi2564
    @celsobigliazzi2564 5 лет назад +4

    Modernização , rapidez e País sem corrupção . Meus Parabéns a vocês!

  • @Boikotlsrail
    @Boikotlsrail 9 лет назад +3

    16:17 this guy with that broom stick should enter the world book of record "the longest sweeping while walking for more the hundred kilometers"

  • @websitesthatneedanem
    @websitesthatneedanem 7 лет назад +3

    GREAT video. VERY interesting!

  • @2012Budapest
    @2012Budapest 6 лет назад +7

    Austrian-Hungarian company-hungarian workers build railway in Croatia.
    Good work!

  • @jimmypachecoleon7476
    @jimmypachecoleon7476 6 лет назад +4

    Excelente....Viva la " Train-manía ".....

  • @Bhupendrakumar-rl8cp
    @Bhupendrakumar-rl8cp 5 лет назад +8

    High Precision aspect makes possible high speed .

  • @ildeuraimundodasilva8230
    @ildeuraimundodasilva8230 6 лет назад +1

    Mr. Brunoh 155 , Brazilian leaders should buy a machine from this , not only to do maintenance, but to build new railroads for this country of continental dimensions . But , prefer to invest in road transport , which is more expensive and inefficient.
    Congratulations . Greetings from Brazil.

    • @AKAtheA
      @AKAtheA 5 лет назад

      Railways actually cost a LOT more, because you have to keep the grade low, which means a lot more of digging, tunelling and bridging. All that gets you a 1 shipping container max. size (2 stacked if you use american standards) of what you can haul, transporting oversize cargo is usually not an option because of tunnels. Even a 2-way highway allows for much wider and longer oversize cargo to be hauled if needed.
      Also unless you have a railway between the source and consumer, you have to build terminals for goods to be eventually loaded on and from trucks, which need...a road. All this costs more money and adds time it takes to transport something.
      Railways make sense for high-volume transport of easily packable material that is not time-critical, like gravel, coal, sand, grain, woo...or shiping containers between large terminals or ports. Trying to use railway for hauling just one (or less) container worth of stuff to some individual location when you can use a road is just wasting money and time. Same goes for transporting people by train - horribly inefficient. A bus beats it by quite a margin and can get them closer to their desired destination with more options on avoiding unexpected obstacles.
      All said and done, roads are more universal and quite essential for growing your economy and moving it from just primary to secondary and tertiary sectors, so it makes sense to prioritize road over rail, which is rather limited in what it can do despite being able to do it in large volume.

  • @tractorsmachinesro1405
    @tractorsmachinesro1405 4 года назад +2

    Great rail therapy...I like IT!!!!

  • @velvaruzxela
    @velvaruzxela 3 года назад +4

    SUPER VIDEOS 👍!!!

  • @martinzone8153
    @martinzone8153 6 лет назад +1

    How long do the concrete sleepers last? That is, is there some general time limit when u are supposed to renew a concrete track?

    • @gellertcsanadcsaszar-biro8965
      @gellertcsanadcsaszar-biro8965 6 лет назад

      it depends on the desingned speed. if you dont want to be faster than 80 km/h, then you should do just some maintance. (average concrete sleepers are in hungary 40-60 years old.) if you want to buld a faster railway line (with designed speed= 160 km/h) then you have to change the concrete sleepers. (just like here in the video...) and if you want to highspeed railwayline, (designed speed =300km/h), then you have to forgot the old railway track, and you have to set a new track.

  • @andricdrazic9282
    @andricdrazic9282 6 лет назад +1

    This is actually in Croatia, check the road signs. Location is near city Of Koprivnica Northern Croatia

    • @eugenkramaric1173
      @eugenkramaric1173 5 лет назад

      Nisam ni skuzio da je to Hrvatska 👍👌✌☺

    • @Boz1211111
      @Boz1211111 4 года назад

      i looked at the vehicles plates at the begining after i saw the marking on the road and they are not croatian, so i thought this is somwhere else. then i saw belupo buidling at 25:19 and i was like whaat, and then i read the description

  • @markmonse5285
    @markmonse5285 4 года назад

    Was the intentional gap between the end rails left for a thermite welding join?

  • @mattalbrecht7471
    @mattalbrecht7471 2 года назад

    So why the gaps at 22:35?

  • @silverdrillpickle7596
    @silverdrillpickle7596 5 лет назад +8

    The guy with the corn broom:
    “Nope Lads, can’t have any pebbles here!”

  • @842qwery
    @842qwery 6 лет назад +48

    Whoever clocks-in last gets the broom....

  • @promputsnab
    @promputsnab 5 лет назад +1

    Вы рельсы-шпалы где берете? Заходите к нам.

  • @raincoast2396
    @raincoast2396 7 лет назад +1

    This is the proper way to maintain, improve and care for infrastructure. We just let it run into the ground before repair. If that!

  • @my-hv9zg
    @my-hv9zg 5 лет назад +1

    是哪個個國家的鐵路 ?
    What country is this railroad reconstruction in ?

    • @aliya4424
      @aliya4424 5 лет назад

      Croatia. with the working machines from german speaking land Germany/Austria/Swiss. And who pays? I think china, because of the new silk road. But what do i know for real? Nothing :-)

  • @ВалерийПавлов-т7л

    сколько километров ж/д пути эта машина может положить за 1 день?

  • @lawrencecaile
    @lawrencecaile 5 лет назад +1

    I wonder how long from idea to making this machine.

  • @yusryusriyyahfalahdzakiyya3607
    @yusryusriyyahfalahdzakiyya3607 4 месяца назад

    tahun 1500 membangun rel kereta api sejauh 1000kilometer, membutuhkan waktu 100 tahun lebih, sekarang cuma butuh waktu cuma 1 tahun, benar benar gila technology modern😢

  • @Women_Rock
    @Women_Rock Год назад +1

    I wonder if building railroads was easier or harder 180 years ago

  • @radisastevanoviczagar6419
    @radisastevanoviczagar6419 5 лет назад

    Vidim da se radi i Hr.ta mašina je jako skupa dali je to posuđeno od ili je u vlastništvu HŽ?I koliko može da uradi pruge na dan ?Hvala za odgovor.

  • @samueloliveira2062
    @samueloliveira2062 5 лет назад +4

    Parabéns Croatas pelo excelente trabalho.

  • @josimaralves5488
    @josimaralves5488 2 года назад +3

    Máquina imprecionante!

  • @jorgemartinez246
    @jorgemartinez246 9 лет назад +7

    Deseo que el nuevo gobierno de mi pais se dedique en recuperar las vias y trenes que tanto hacen falta para el progreso de nuestra querida Argentina!!!!

  • @Gdddghhrwscbkjgesdcc
    @Gdddghhrwscbkjgesdcc 8 лет назад +9

    Is the tie crane driver paid by the mile? He keeps going back and forth without any ties...

    • @haroldsmith8698
      @haroldsmith8698 8 лет назад +1

      +Fred Stiening MOST LIKLY BY THE HOUR OR BY THE DAY HOW EVER IT IS ON WITZERLAND RAILROADS.

    • @jbdragon3295
      @jbdragon3295 8 лет назад +2

      I see him picking them up.

    • @edgmp
      @edgmp 7 лет назад

      Good one.

    • @NaYawkr
      @NaYawkr 6 лет назад +1

      Sign of a strong Union.

  • @NeoRipshaft
    @NeoRipshaft 5 лет назад +2

    I can't help but want to see it go farther - like have a rail-drawn concrete mixer and presser for the sleepers - assembly to add on the additional bits - and like at the front of the pseudotrain there's a crazy earth devourer-er that rips through rocks and land and sends back the raw material to the mixer on a third level of the train - and there's like a whole manufactorium on the back, to ludicrous and silly levels... like an entire moving city for all the workers, a garage, heliport, maybe ultralight take-off strip or something.... would be so f'n cool lol

  • @Kredo800
    @Kredo800 5 лет назад

    Plese, someone explain why tractor made a gap at 22:32?

    • @dannymccarty6680
      @dannymccarty6680 5 лет назад

      Kredo800 They will put in an insulated section of track to interrupt the electrical continuity of the track. A steel wheel passing over it will briefly restore the continuity - it’s part of the railroad’s automated signaling system.

  • @Tohobozo
    @Tohobozo 5 лет назад +9

    I watched for 10 minutes and all I saw was a train riding a train . . .

  • @ph11p3540
    @ph11p3540 5 лет назад +4

    I love watching these hypnomatic Spellbinderbans

  • @duongsonca
    @duongsonca 5 лет назад

    Viet nam den bao gio moi dc nhu nay day???

  • @gbestwick
    @gbestwick 9 лет назад +3

    4:56 is hilarious!
    Am I the only person who seriously wants someone to make a huge TV program on this. I would love to take a tour of one of these things while they are working.
    .

  • @angelotorres3412
    @angelotorres3412 9 месяцев назад

    Incrível esta tecnologia. Ótimo trabalho.

  • @grahamdorey3244
    @grahamdorey3244 5 лет назад +1

    They used one of these to do the changeover from timber to concrete sleepers right across the Nulabour Plains of Australia, some several thousand Km.

  • @hansclaudegimenez6344
    @hansclaudegimenez6344 2 года назад

    RUclips vidéo par SNCF réseau je voudrais savoir si mintane vous construisez des nouveaux sillons avec les tunnelier et les trains travaux en 2021 en vidéo merci

  • @has.durmaz
    @has.durmaz Год назад

    What happened the broken concrete stick?

  • @topautos
    @topautos Год назад

    Superb video ! 👍

  • @crackerjack4833
    @crackerjack4833 5 лет назад +2

    I see this and I constantly think of the game Satisfactory :D This is when you know you play it way to much.

  • @sylviaelse5086
    @sylviaelse5086 3 года назад

    22:12 What's that about?

  • @alimohtashimkhan2711
    @alimohtashimkhan2711 Год назад

    Beautiful informative video.

  • @GeneralWagner
    @GeneralWagner 5 лет назад +3

    4:55 just passing by the post

  • @ardeleandan7
    @ardeleandan7 5 лет назад

    How many km of railroad can it repconstruct?

  • @SigReno
    @SigReno 5 лет назад +2

    I worry about seeing humans so carefree and so close to so many very powerful machines that they lift the tracks as if they were sticks. At any time someone could get very hurt.

  • @romeowhiskey1146
    @romeowhiskey1146 Год назад

    BEST PART: Man with a BROOM at 24:58 on sweeping the sleepers.

  • @NosTrilhos
    @NosTrilhos 4 года назад +7

    Trabalho incrível parabéns!

  • @rreemyy
    @rreemyy 6 лет назад +2

    They clearly use machine learning, happy to see it

  • @benjamintucker1964
    @benjamintucker1964 7 лет назад

    how long does traffic have to wait when they go through an intersection?

    • @gellertcsanadcsaszar-biro8965
      @gellertcsanadcsaszar-biro8965 6 лет назад

      the intersections are closed for a week that time, when this machine is working. you can avoid the construction at the next intersection.

    • @lordsamich755
      @lordsamich755 5 лет назад

      Better to get rid of level crossings anyway. Particularly around high speed lines.

  • @sylviaelse5086
    @sylviaelse5086 3 года назад +2

    Driving the thing that runs across the top would be fun. For about the first ten minutes. After that my eye would glaze over with boredom.

  • @izaiasquinto8198
    @izaiasquinto8198 2 года назад +3

    Excelente trabalho parabéns.

  • @bluemomo65
    @bluemomo65 6 лет назад +1

    Thank you for Nice video.

  • @jellojiggle1
    @jellojiggle1 5 лет назад +3

    Amazing.
    What is going on here? 21:25

    • @10324800
      @10324800 5 лет назад +3

      looks like a cracked tie

  • @retnosusanto8317
    @retnosusanto8317 9 лет назад +1

    negara maju dengan peralatan yang canggih pekerjaan jadi efektif dan efisien tanpa merekrut banyak tenaga di lapangan.

  • @florostheodorou984
    @florostheodorou984 6 лет назад +3

    I wander who design this machinery. Amazing.......

  • @STASHYNSKYI
    @STASHYNSKYI 5 лет назад

    Kolika je omogućena brzina?

  • @RollingEasy
    @RollingEasy 5 лет назад

    Why did he spread the rails at 21:30?

  • @matiasmanaos6321
    @matiasmanaos6321 3 года назад

    Los alemanes son de otro planeta.

  • @АлександрКамаев-ж5я

    Вопрос, как рельсы старые собирать. Вопрос второй нахрена нужна эта медленная конструкция. Вопрос третий тележки к чему

  • @ferroviedeltrentino2300
    @ferroviedeltrentino2300 5 лет назад +4

    Inredible thinking once all this job was done manually :-O

  • @darrylmackenzie4440
    @darrylmackenzie4440 6 лет назад +3

    $200,000,000 for the machinery $12.75 for the broom @17:17 which the machine can not work without. Same as every site in the world the university educated engineers who have come to tell you you are doing it wrong are almost killed by the rail lift driver @20:20. the rail lift driver enjoyed it so much he has a 2nd crack at them

  • @ajaysingh_rajput1924
    @ajaysingh_rajput1924 3 года назад +1

    Amazing engineering pc

  • @kyledonahue33
    @kyledonahue33 9 лет назад

    Who laid the track for the machine to ride on?

    • @willi19391
      @willi19391 9 лет назад +1

      Kyle Donahue It was laid long time ago, who knows, maybe even in Austro-Hungarian empire.... :-)

    • @anothermoth
      @anothermoth 9 лет назад +2

      +Kyle Donahue When we built the channel tunnel rail link in the UK we started with a train that built its own temporary track from short sections of rail with wooden sleepers (ties), straight onto the sub grade. Next the continuously welded final rails were set down to either side, and used by crane vehicles like the one shown here to replace the temporary track with final concrete sleepers (ties). Next the rails were zipped up onto the sleepers and fixed. The ballast actually came last. It was dropped on top of the track, then a tamping train would work its way along lifting up the track and shuffling the ballast under it. Ballasting and tamping were repeated until the track reached its final alignment.

    • @kyledonahue33
      @kyledonahue33 9 лет назад

      That's awesome. Thanks.

    • @gellertcsanadcsaszar-biro8965
      @gellertcsanadcsaszar-biro8965 6 лет назад

      @@kyledonahue33 it was financed by the rotschild family in the 1860's. The engineers were austrians. And the workers probably hungarians or croatians. It was the part of the" Southern Railway Company" then the hungarian state bought that stuff. then croatioan-serbian kingdom had it, then jugoslav kingdom had it, then croatia had it, then jugoslavia had it, then croatia had it again.

  • @MultiSandtrooper
    @MultiSandtrooper 4 года назад

    21:53- 22:50 why???🤔🤔🤔