Hi Sir thanks for this video. Fantastic. I have a doubt and hope you can clarify. Suppose if i wish to generate an earned value report on time, not with cost. As my project is a fixed rate lumsum project, i need to know if the contractor is progressing as per his baseline schedule. What settings that i should put in activity type and how do i get that cpi and spi interms of duration/time instead of cost.
@@dptutorials thanks a lot to your response. We are trying to implement the same in our current project. Please let me know as soon as you create the video of what i asked. Otherwise, It would be good if we can have a zoom call to get it clarified from you.
Hi, thanks for the comment.....it depends on the organization's which level they are using.But in general, everyone would be using the mid level of primavera.
This is very useful for me. Thanks for guiding me .
Most welcome..
Hi, request tutorial to create driving column sir
Hi Sir thanks for this video. Fantastic. I have a doubt and hope you can clarify. Suppose if i wish to generate an earned value report on time, not with cost. As my project is a fixed rate lumsum project, i need to know if the contractor is progressing as per his baseline schedule. What settings that i should put in activity type and how do i get that cpi and spi interms of duration/time instead of cost.
Yes, you can, Will try to post a video soon
@@dptutorials thanks a lot to your response. We are trying to implement the same in our current project. Please let me know as soon as you create the video of what i asked. Otherwise,
It would be good if we can have a zoom call to get it clarified from you.
Gd afternoon sir I have 1 doubt which is used in foreign primavera advanced or Primavera foundation? Pleee reply me sir
Hi, thanks for the comment.....it depends on the organization's which level they are using.But in general, everyone would be using the mid level of primavera.
my comment is effective in this time
Great.