Are YOU Using this Primavera P6 Float Paths Feature?

Поделиться
HTML-код
  • Опубликовано: 9 сен 2024
  • Are you using the Float Paths feature in Primavera P6? We'll show you how to use this tool inside P6 to analyze your float as well as what you can do with the data outside of Primavera.
    Want to learn Primavera P6?
    www.planacadem...
    Looking to become a higher level P6 scheduler?
    www.planacadem...
    TAGS:
    primavera p6 tutorial, primavera p6 training, primavera p6 online training, p6 float paths, oracle primavera p6, project management, total float, plan academy, michael lepage, free float, scheduling, critical path analysis, critical path calculation, near critical activities

Комментарии • 39

  • @dominicboakye8226
    @dominicboakye8226 Год назад +1

    Amazing information sir. Thank you so much. Guys make sure you watch the video on how to calculate float paths.

  • @scottymac734
    @scottymac734 7 месяцев назад

    Awesome explanation and guide. Plan Academy is consistently the best source of well-presented advanced P6 scheduling best practices instructions.

    • @PlanAcademy
      @PlanAcademy  6 месяцев назад

      Thanks! That's an awesome endorsement!

  • @danialshaikh7796
    @danialshaikh7796 8 месяцев назад +1

    Thank you so much for such an organized and clear video!

  • @saurabhvaranasi3429
    @saurabhvaranasi3429 Год назад +2

    I really like your videos and the effort you put in to make such informative videos! To be honest, I have been using these features for a while now. But, there are some basic concepts which become clear after watching your videos…and then I go like “Oh, that’s why I have been doing it this way” :)

    • @PlanAcademy
      @PlanAcademy  Год назад +1

      Thanks, Saurabh!
      That's really great to hear. We appreciate it!
      So glad you (and hopefully others) get a lot out of our videos.

  • @pietererwee1845
    @pietererwee1845 2 месяца назад

    Can you kindly share the link to the "next video" mentioned at the end which explains how to use this feature to calculate multiple critical paths to intermediate milestones on a project?

  • @PaulEwog116
    @PaulEwog116 Год назад +1

    Excellent video. Very helpful. Thank you.

  • @joshocean1856
    @joshocean1856 Месяц назад

    great info

  • @munawarjack91
    @munawarjack91 Год назад +1

    Gud Day Michael Great information keep it Up Boss Br, MUNAWAR

  • @foroughhosseini3826
    @foroughhosseini3826 11 месяцев назад +1

    Thanks for sharing your knowledge!

    • @PlanAcademy
      @PlanAcademy  11 месяцев назад

      You're very welcome, Forough. We try, haha.

  • @rogermatildo780
    @rogermatildo780 Год назад +1

    very helpful. many thanks!

  • @AzharAli-pt5kf
    @AzharAli-pt5kf 4 месяца назад

    While these activities with negative float show critical when simply filter critical path and not run the float path feature in p6

  • @eduardomunoz2764
    @eduardomunoz2764 Год назад +2

    Excellent explanation, thanks.

  • @King_of_noobsXXX
    @King_of_noobsXXX 11 месяцев назад

    Really like your vedio. It was really helpfull to the problem which I had

  • @jeevankg
    @jeevankg 3 месяца назад +1

    super

  • @zahir585
    @zahir585 Год назад +1

    Great content as always ❤ big fan of your channel, keep up the excellent work 🙌🏻

  • @Ahmadhamaad
    @Ahmadhamaad Год назад

    It's great video and good described the Float Paths

  • @mohamadkhatib8624
    @mohamadkhatib8624 Год назад

    Hi sir I’m having great time with your videos would you explain level of effort much appreciated it

    • @PlanAcademy
      @PlanAcademy  Год назад +1

      No video for Level of Effort right now, but I do have a great blog post here that explains it: www.planacademy.com/level-of-effort-faq/

  • @AzharAli-pt5kf
    @AzharAli-pt5kf 4 месяца назад

    @azhar ali
    Very informative. I have encountered one problem with float path. Activities with negative float are showing non critical when run schedule with float path and filtered the paths from 1 to 10. What could be the possible problem?

  • @rahouls2415
    @rahouls2415 11 месяцев назад

    clear can understand😊

  • @mezuk04
    @mezuk04 4 месяца назад

    I have followed these guide but for some reason it doesnt display any float paths for my particular programme.

  • @khaledAhmed-eb4be
    @khaledAhmed-eb4be Год назад +1

    Very useful video

    • @PlanAcademy
      @PlanAcademy  Год назад

      Thanks very much. Glad to hear it.

  • @ma1kp83
    @ma1kp83 Год назад +1

    Really very nice ❤

  • @thebigmora
    @thebigmora Год назад

    Great job

  • @benzonjhermogeno
    @benzonjhermogeno 5 месяцев назад

    Done subscribing👍

  • @MD-lk4qr
    @MD-lk4qr Год назад

    thanks for this amazing video but how can i find the next video related to this video?? im lost

    • @PlanAcademy
      @PlanAcademy  Год назад

      You're welcome - sorry this is an exerpt from my Advanced P6 Schedule Building course....the next video is only available in the course.

  • @MiscBurch
    @MiscBurch Год назад

    Please drop the vest and hard hat moving forward, it is unnecessary and a little used car.

    • @PlanAcademy
      @PlanAcademy  Год назад

      Cars do inherently lose value as soon as they become used. But they don't lose their usefulness.
      We had actually shot the first take with 2 hard hats, but we decided that was too much.

    • @galvanizedgnome
      @galvanizedgnome Год назад

      Lol. This guy drinks hater aid