Kinaxis Production Scheduling by PlanetTogether

Поделиться
HTML-код
  • Опубликовано: 17 янв 2023
  • Break down barriers with connected scheduling.
    Don’t let late shipments and stretched lead times put your sales growth and key customer relationships at risk. With Kinaxis Production Scheduling by PlanetTogether, you can effortlessly optimize factory resources, boost manufacturing efficiency and meet customer expectations faster than ever before.
    This solution extension combines the detailed production scheduling capabilities of PlanetTogether with the awesome power of RapidResponse’s concurrent planning platform - for complete visibility of how disruptions will impact your supply chain anytime, anywhere. Through seamless integration, you’ll be able to drive instant visibility between planners and schedulers to unleash the full potential of your manufacturing plants and quickly adapt to changes in the production sequence. Respond with agility to demand changes. Operate efficiently. And ship on time.
  • НаукаНаука

Комментарии • 2

  • @wissamsidki5237
    @wissamsidki5237 28 дней назад

    What happens if I add new manufacturing tasks to the schedule?

  • @lal885
    @lal885 9 месяцев назад

    I have a question. Are you able to input variables for each work center? So if I have 3 different setups for a CNC machine, but two of them are more similar than the third. Will it optimize it so that the two similar setups are scheduled before the third based on those similar variables? But then further optimize it to reduce downtime/waiting periods for other needed parts in other departments?