Reinforcing a mine drift with cables in the 3D Tunnel Designer

Поделиться
HTML-код
  • Опубликовано: 13 сен 2024
  • The 3D Tunnel Designer has been extended with the cable element, speeding up the design of reinforced underground excavations compared to previous versions of PLAXIS 3D. The movie highlights some new capabilities like defining the cable reinforcement pattern, sequencing mode and pre-stressing the cables as well a automatically generating the construction stages.
    Read more about the new capabilities that solidify Seequent's Connected Geotechnical Workflow and also discover new offshore, rock and mine engineering capabilities, at our PLAXIS 2024.1 release blog: communities.be...

Комментарии •