Dam construction with CAT bulldozer and SCANIA trucks [drone footage]

Поделиться
HTML-код
  • Опубликовано: 16 сен 2024
  • Embankment for the retention basin Fahrafeld with CAT bulldozer and SCANIA trucks.
    Drone footage of the hustle and bustle on this large construction site.
    In the Triestingtal, the Fahrafeld flood retention basin is being used to protect against hundred-year flood events. Thanks to the 2.7 km long dam, the retention basin can store 725,000 m³ of water.
    My name is Reinhard Bergmann.
    Thanks for watching and stay curious!
    A sonnenschein.v... production.
    Photos: Reinhard Bergmann
    Music: Max Surla - Media Right Productions

Комментарии • 3