Thai House Build Week 9 - Main Floors & Columns

Поделиться
HTML-код
  • Опубликовано: 27 окт 2024

Комментарии • 3

  • @warrencombes8256
    @warrencombes8256 4 месяца назад +2

    Good vid

  • @rimzalia1362
    @rimzalia1362 4 месяца назад +1

    They will weld metal plates on top of each column rebar before putting the roof beams and trusses.
    That will leave air gaps around the rebar and metal plates which are prone to corrosion. To avoid that; demand your contractor to fill that air gap with Non-Shrinks Grout cement till it is above the top face of those metal plates.

    • @RetiredTranquilinThailand
      @RetiredTranquilinThailand  4 месяца назад +1

      Thanks for the feed back - would anti corrosive paint/solution work as an option