Hi Hany, this is very informative. However you should include the Remaining Duration in importing to excel, so that it will reflect in the updated baseline as well. Anyhow, keep on posting this kind of tutorial. Cheers
السلام عليكم انا اتبعت كل الخظات بس في عندي مشكله لما اعمل import ترتيب الانشطه بيختلف يعني كل ال WBS بتختفي وبتظهر كل الانشطه بدون اي wbs/ شو بكون السبب؟
Hi Hany, this is very informative. However you should include the Remaining Duration in importing to excel, so that it will reflect in the updated baseline as well. Anyhow, keep on posting this kind of tutorial. Cheers
Thanks ! Very clear & easy
You are welcome :)
Hi Mr. Hany very clear explanation thanks .
You are most welcome :)
Hi.
Atfer doing this step how to match planned value and earned value and Performance percent complete? Please make a video on this also.
Thank You.
Yes it's not coming equal
Hi Hany, why would you not just save a baseline in p6, on the progressed schedule rather than updating the old baseline in excel? Thanks
السلام عليكم انا اتبعت كل الخظات بس في عندي مشكله لما اعمل import ترتيب الانشطه بيختلف يعني كل ال WBS بتختفي وبتظهر كل الانشطه بدون اي wbs/ شو بكون السبب؟
ما فى شىء بدون سبب. اتاكد ان WBS path مظبوط
Thanks a lot!
How to prepare extension of time for a project what is the procedure for doing it
The answer is a complete course :) here it is: planningengineer.net/courses/claims-management-and-delays-analysis-online-workshop/
plz if you can explain just this short video in Arabic
There is Arabic Channel you can join me there
اهلا باشمهندس ... يوجد قناه عربيه تابعنى هناك
ruclips.net/channel/UCoOsUpxqK6hhSOJLyOE3AeQ