Los Angeles Metro C Line Full Front View Cab Ride Redondo Beach to Norwalk Station

Поделиться
HTML-код
  • Опубликовано: 1 янв 2025

Комментарии • 13

  • @elliottwlucas
    @elliottwlucas 6 месяцев назад +5

    I love this video!! I've noticed that there are lots of p3010's on the C Line right now as well as some p2000's.

  • @mrxman581
    @mrxman581 6 месяцев назад +8

    Best video I've seen on the C line. It's so satisfying to see the train pass by all the stopped and slow traffic on the freeway. It was even faster than the carpool lane at times.
    It seems the train travels slower on those southern stations before it gets on the 105 median. I wonder why.
    I did read that LA Metro got some federal funding a couple of years ago to replace the catenary overhead lines and expand the four southern station platforms to match the platform lengths on the K line stations so they're capable of accepting 3 car trains.
    I saw that the future tracks are there, too, for the C line to go north. Very exciting. Any idea when the reconfiguration for both lines will happen? Thanks

    • @ayeeeeeeee6240
      @ayeeeeeeee6240 6 месяцев назад

      probably whenever the lax stations open up is when they’ll reconfigure the lines. my best guess would probably be sometime next year

    • @ChrisJones-gx7fc
      @ChrisJones-gx7fc 5 месяцев назад +1

      @@ayeeeeeeee6240the LAX Metro Transit Center station is set to open in November 2024, according to a July 2024 Metro Board Report

    • @ChrisJones-gx7fc
      @ChrisJones-gx7fc 5 месяцев назад +2

      November 2024 when the LAX Metro station opens

  • @MatthewLee-fo3me
    @MatthewLee-fo3me 4 месяца назад +5

    It will always be the Green Line to me.

    • @TigerRailfan
      @TigerRailfan  4 месяца назад +1

      I’m sure it will for a lot of us, letters have so much less character

  • @QuentinLax
    @QuentinLax 6 месяцев назад +1

    Thank you for these videos, it’d be really cool if there was a little graphic on the side to show the progress

    • @TigerRailfan
      @TigerRailfan  6 месяцев назад +2

      Of course! I’ll have to look and see how I could make a graphic like that, thanks for watching! 😃

  • @bbartky
    @bbartky 3 месяца назад +1

    Thanks! I haven’t been on the C Line yet so it’s nice to see. And are there, or were there, plans to go further south than Redondo Beach or further east than Norwalk?

    • @TigerRailfan
      @TigerRailfan  3 месяца назад +1

      There are plans to extend south to Torrance, and east to Norwalk/santa fe springs Metrolink but these won’t be done anytime in the near future unfortunately

    • @skip-4259
      @skip-4259 3 месяца назад

      Norwalk Metrolink is planned for around 2050

    • @TigerRailfan
      @TigerRailfan  3 месяца назад

      @@skip-4259 ah thats so far in advance 😢