How to install an Underground Drainage System - OHOB Training Academy

Поделиться
HTML-код
  • Опубликовано: 27 ноя 2024

Комментарии • 10

  • @andrewthomson3165
    @andrewthomson3165 Час назад

    How come you don't put concrete base on manhole

  • @mohammadzahed6363
    @mohammadzahed6363 2 месяца назад

    Good information bather thanks

  • @uniqueglobalnetwork
    @uniqueglobalnetwork 9 месяцев назад

    What is the unit you measur in tape ??? Is it mil?

  • @TheNomadBuilder
    @TheNomadBuilder Год назад +1

    Why put rockers before/after a manhole when it has a granular base? Rockers are to offer flexibly when drainage passes through a solid eg concrete structure (When you muck in the rat runs). Pointless on a manhole when surrounded by single?

    • @drainfast-uk
      @drainfast-uk  Год назад

      Good point, it wasn't mentioned in this video but the inspection chamber base normally get concreted into position - hence the need for rocker pipes. As mentioned here ruclips.net/video/FuNZxHKDdKY/видео.html

  • @andrewthomson3165
    @andrewthomson3165 Час назад

    All this equipment fine for site work no good for extentions.

  • @ianhoward4246
    @ianhoward4246 6 месяцев назад

    I've been on site almost 40 years... I've never seen a chamfering thingy!!

    • @drainfast-uk
      @drainfast-uk  6 месяцев назад

      www.drainfast.co.uk/products/accessories/hand-tools/110mm-pipe-chamfer-tool
      It's a handy tool to have

  • @leonmorris5602
    @leonmorris5602 Месяц назад +1

    Dude every time u guys measure stuff off brickwork and a spirit level just makes me so uneasy lol use a laser!!!!!