HS2 Colne Valley area

Поделиться
HTML-код
  • Опубликовано: 15 фев 2024
  • Progress is ongoing as the Harvil Road realignment will allow work to start to connect the Colne Valley Viaduct with Copthall tunnel.

Комментарии • 7

  • @StephenWalker42
    @StephenWalker42 4 месяца назад +3

    A great fly-by of the works, and the new road, there is such a lot of variation in the civil engineering going on in this area. Thanks for posting...👍👍👍👍...

    • @stevetony6876
      @stevetony6876  4 месяца назад +1

      👍👍 It’s a major undertaking to realign a road! Hopefully we’ll see a bit of nature returning in that embankment in the spring and on into the summer months..

  • @brianswan3559
    @brianswan3559 3 месяца назад

    Thanks for posting.
    Has Dews Farm been demolished yet?

    • @stevetony6876
      @stevetony6876  3 месяца назад

      👍 Yes unfortunately Dews farm was on the track alignment.

    • @brianswan3559
      @brianswan3559 3 месяца назад

      @@stevetony6876 That is sad, many thanks for reply.

  • @thesolorunner9313
    @thesolorunner9313 4 месяца назад

    Hey do you have any footage of where the viaduct is up to? Has it reached the canal yet?