WCH M-Bells replaced!︱Caltrain 917 Passes the Dunne ave Railroad Crossing ︱4/26/2024

Поделиться
HTML-код
  • Опубликовано: 6 сен 2024
  • Around the middle of February when i was in the bay area, i passed the Dunne Ave crossing and almost missed a local freight, I didn't have enough time to video the train but i noticed that the WCH M-Bells were replaced with GS type 3's, So i checked and noticed that nobody had documented the bell change, Obviously i decided to record this change and while heading back from the upper bay, i barely caught the Caltrain here,

Комментарии • 2

  • @pacificzonerailfan
    @pacificzonerailfan 2 месяца назад

    To be more specific, the wch mechanical bells were not directly replaced to gs type 3s. One of the mechanical bell was almost dead and got replaced to a wch electronic bell which was only up for a short time. Then eventually, the wch electronic bell and the wch mechanical bell were both replaced to the current bells