MS Project Tutorial 5 How to Update a Schedule

Поделиться
HTML-код
  • Опубликовано: 15 июл 2024
  • In this tutorial we go over how to update a schedule. This includes setting a baseline, entering a status date, using the tracking Gantt chart and entering actual start and finish dates including the mark on track function.
    If you enjoyed this video click subscribe. You may also like the short selection of videos below. In particular video 6 is a follow up to updating. I am continuously updating my site and comments and your experiences using MS Project are welcome.
    MS Project Tutorials
    • Tutorial 1 Introduction: • MS Project Tutorial 1 ...
    • Tutorial 2 Calendars & Columns • MS Project Tutorial 2 ...
    • Tutorial 3 How to Maneuver • MS Project Tutorial 3 ...
    • Tutorial 4 Resources and Costs • MS Project Tutorial 4 ...
    • Tutorial 5 Updating a Schedule • MS Project Tutorial 5 ...
    • Tutorial 6 Recovering a Schedule • MS Project Tutorial 6 ...
    • Tutorial 7 Adding a Change • MS Project Tutorial 7 ...
    • Tutorial 8 File Saving Protocol • MS Project Tutorial 8 ...
    • Tutorial 9 No Open Ends • Three ways to avoid op...
    MS Project Made Easy
    Tutorial 1 • MS Project Made Easy T...
    Tutorial 2 • MS Project Made Easy T...

Комментарии • 169

  • @sanjayg1340
    @sanjayg1340 2 года назад +7

    Thank you Tom for such good crisp tutorials. Your method of explaining the topic is good and easy to follow.

  • @erikkj1
    @erikkj1 3 года назад +4

    This was a great tutorial, helped me out a lot. Thanks for your time creating it

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +1

      Glad it helped! Check out Ms Project Tutorial 6 which is the follow up on recovery. It is listed under the MS Project Tutorials Playlist on my RUclips channel.

  • @artiashokpednekar9870
    @artiashokpednekar9870 2 года назад +6

    I am watching the entire playlist on MSP and I want to thank you for making it so easy to follow with all the tips included! Also thank you for linking the information with Primavera. Great tutorial!

  • @rezaheidari2183
    @rezaheidari2183 3 года назад +1

    I really find it very well detailed and well manoeuvred, well lectured and powerful as well as friendly and engaging.

    • @TomStephensontraining
      @TomStephensontraining  3 года назад

      Very appreciated Reza, im glad it helped and was engaging. Your kind comments provide me with motivation for more

  • @atanuroyghatak582
    @atanuroyghatak582 3 года назад +1

    Yours is by far the best tutorial on the subject that I have come across. Many thanks

    • @TomStephensontraining
      @TomStephensontraining  3 года назад

      Glad it was helpful! Many more on my channel under the MS Project playlists

  • @ranelsorreda8032
    @ranelsorreda8032 Год назад

    Your videos of MSP are all well explained and on point. Thanks for sharing.

  • @barivureponi1016
    @barivureponi1016 2 года назад +1

    Thanks for this tutorial. It is easy to understand yet thorough and well-presented

  • @danmunyaneza1761
    @danmunyaneza1761 6 месяцев назад +1

    Hi Tom i have been using your tutorials learning MS projects and now I have confidently started using this software in my daily job may God bless you a lot, love from Rwanda❤❤❤

  • @07XTX
    @07XTX 3 года назад +4

    Another great tutorial - I wish I had come across this channel a while ago. Please keep them coming! :-)

  • @amitsinghtomar1980
    @amitsinghtomar1980 Год назад

    Such a fantastic tutorial. Tom really explains it well with logic. Very easy to understand. Its like attending a live class in a University with a great Professor. Thanks a lot Tom.

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Thanks Amit, it is always nice to hear that my videos are helping people like yourself. Very appreciated! All the best.

  • @abdelhakadnane7331
    @abdelhakadnane7331 2 года назад

    Thanks you for your tutorials, and the way you explain the things for us.

  • @nkyibe1299
    @nkyibe1299 2 года назад

    As always, I enjoyed this tutorial as well....Thank you very much!

  • @agilizity8736
    @agilizity8736 3 года назад +11

    this video is outstanding. Thank you so much for your generosity in sharing your knowledge.

  • @marlenarhinehart9062
    @marlenarhinehart9062 2 года назад

    Thank you so much for creating this tutorial!

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Thanks for watching, plenty more on my channels playlist. Much appreciated

  • @phillipmhindu7219
    @phillipmhindu7219 8 месяцев назад +1

    You are the best Tom. Most proffesors complicate things but u make it look like cutting magerine with a hot nife. May God bless u ajd your family

    • @TomStephensontraining
      @TomStephensontraining  8 месяцев назад +1

      Thanks Phillip, I really appreciate you taking the time for the kind words.

  • @masoodhussain1967
    @masoodhussain1967 Год назад

    4:29 minutes into the video and i am hooked already. Thanks for making such a comprehensive videos for us new to PM

  • @TajK2Maple
    @TajK2Maple 2 года назад

    Tom’s tutorial is the best MS Project I came across in my 40 years Project Management carrier.

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Hi Wajid, thank you, I appreciate your kind words and the wisdom you must have with that much experience yet you continue to learn on RUclips. That is an example for everyone to learn from. All the best!

  • @shariqconsultancy5747
    @shariqconsultancy5747 2 года назад

    Precious tutorial. Thanks for keeping it to the point. MPP is like a cockpit control center .. several buttons and controls; all are useful, but need to know which one to press when :)

  • @charmainemdledle9417
    @charmainemdledle9417 Месяц назад +1

    Good tutorial, very helpful indeed. It’s my first time using MSP and I must say I’m more comfortable now to use it going forward, thank you so much.

  • @rishikantmittal6807
    @rishikantmittal6807 Год назад

    Very good , Simplified

  • @rehmaniacademy3199
    @rehmaniacademy3199 2 года назад

    i found out what i was looking, thanks for making understanding that simple

  • @amitdobhal234
    @amitdobhal234 2 года назад

    Very informative video Tom , and you explained it so well.

  • @randeeptalukdar2250
    @randeeptalukdar2250 3 года назад +2

    Hello dear Tom, I gotta say that you probably have got the easiest way to make things understandable with a crystal clear explanation of each and every small topic within a bigger topic. Good job on that!

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +1

      Thank you Randeep, that is what I attempt to do whenever possible. I find it takes a while to find an easy and memorable way of describing things but when I find it, it is very satisfying when people like you give confirmation feedback. Thanks again!

    • @randeeptalukdar2250
      @randeeptalukdar2250 3 года назад

      @@TomStephensontraining Hi Tom, it is great to hear from you. Yes that’s true...it’s important to find a crystal clear explanation for a topic out of so many videos for a single topic in RUclips and when we find videos like how your are making.. makes our understanding a bit more interesting and easier!

  • @moonlights118
    @moonlights118 3 года назад

    This video really helpfull! thanks for ur clear explanation.

  • @r.i.4259
    @r.i.4259 3 года назад

    Really good way much better than on my uni course , thanks Tom

    • @TomStephensontraining
      @TomStephensontraining  3 года назад

      Great I’m glad it helps, lots more on my channel Msproject playlists

  • @Fsp01
    @Fsp01 Год назад

    Amazing tutorial! thank you Tom.

  • @darrengodden
    @darrengodden Год назад

    Thank you. Very helpful and clear.💯👌👏

  • @omarharmon4650
    @omarharmon4650 2 года назад +1

    This video is great very helpful!

  • @azko123
    @azko123 3 года назад +4

    just started a new job as a Project Manager at a construction company after several years at a consulting firm and this video was super helpful as I had a project handed over to me that is a complete mess and I had to learn to update the schedule. Kudos!

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +2

      Glad it helped, click subscribe and there are more under th MSPROJECT playlist with more to come

    • @azko123
      @azko123 3 года назад

      @@TomStephensontraining I spent all night watching your other videos. Good stuff!

  • @ig7061
    @ig7061 3 года назад

    Thank you everythin g is clear now!!

  • @surajghimire7619
    @surajghimire7619 3 года назад +1

    Really good video, Thanks for sharing knowledge

  • @user-mf7yi7nk3z
    @user-mf7yi7nk3z 10 месяцев назад

    Thanks for this tutorial.very helpful

    • @TomStephensontraining
      @TomStephensontraining  10 месяцев назад

      Excellent! Check my playlists for ms project the course. I have it setup that you can download files from google drive to follow along.

  • @thirikyaw7193
    @thirikyaw7193 2 года назад

    Thank you very much sir for very useful tutorial.

  • @irviantantohadiprasetyo689
    @irviantantohadiprasetyo689 3 года назад

    Good video and really helpful. Thanks

  • @birddayparties
    @birddayparties Месяц назад

    Learned alot thanks Tom!💯💯👍👍

  • @rajeshraju2674
    @rajeshraju2674 3 года назад +1

    Amazing explanation - This Great Job , Its been very helpful,

    • @TomStephensontraining
      @TomStephensontraining  3 года назад

      Thanks Rajesh

    • @Ok-kz3ib
      @Ok-kz3ib 3 года назад

      Excellent tutorial…and example is really relatable…cleared my doubts on baselining and schedule updates

  • @civilsl2937
    @civilsl2937 2 года назад

    Thank you Mr Tom.

  • @alejguz1552
    @alejguz1552 Год назад

    Thank you sir!

  • @nashielion4019
    @nashielion4019 3 года назад +1

    Thanks a lot Sir...really help me

  • @massari4u
    @massari4u 2 года назад

    Hi Tom, I am glad I was able to find your vide on Yourtube. I was one of your students in Construction Management from 2012-2016.

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Great ti hear from you Massari , what are you up to in your career?

    • @massari4u
      @massari4u 2 года назад

      @@TomStephensontraining Thank you Tom! Worked for EllisDon for a while and now work for another GC building high-rise condos in Burlington.

  • @cynthiaanoka5669
    @cynthiaanoka5669 Год назад

    Great explaination!!!

  • @lenava68
    @lenava68 8 месяцев назад

    Excellent for sharing .

  • @anishsule3283
    @anishsule3283 2 года назад

    thanks and appreciated for your valuable
    time for uploading this video.1T likes 👌👍

  • @amalibrahim6882
    @amalibrahim6882 Год назад

    Amazing!

  • @harishbabu6108
    @harishbabu6108 10 месяцев назад

    Excellent Explanation..keep it up.

    • @TomStephensontraining
      @TomStephensontraining  10 месяцев назад

      Thanks Harish, check out the playlist ms project the course you can download the practice files for each video from drive

  • @Alex-hp1nh
    @Alex-hp1nh 4 года назад +2

    It was really helpful.

  • @johnmeredith3485
    @johnmeredith3485 3 года назад

    Well presented, sir.

  • @Brunogtx
    @Brunogtx 3 года назад

    Can't thank you enogh! Really really helpful!

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +1

      Great Bruno, fyi i have a playlist on my channel with lots of details Microsoft Project videos if you need more help

  • @henrysunkle8871
    @henrysunkle8871 3 года назад

    awesome

  • @maeiadali351
    @maeiadali351 5 месяцев назад

    Dear Mr. Tom, I find your content very interesting and useful. I appreciate how you teach us with your experience. There's just one thing missing - the files for each lesson. I would greatly appreciate it if you could upload them so that we can gain more benefits. Thank you.

    • @TomStephensontraining
      @TomStephensontraining  5 месяцев назад

      Hi thanks, check my playlists, click on my face below the video then select playlists, there is a playlist called ms project the course, those videos are updated and includ a link in the written description of each video. All the best

  • @markkrohn8389
    @markkrohn8389 3 года назад +1

    Tom, great video. Quick question after you complete your first update. When beginning second update, would I use the most recent updated file? I believe that is what I would need to do, but I am guessing that I would not reset the baseline, only update the status date and update the necessary line items. Is this correct?

    • @TomStephensontraining
      @TomStephensontraining  3 года назад

      Yes quite right unless you were behind in the update and did a recovery file. In that case you use the recovery file to do the next update. IF you subscribed to my RUclips channel check out the msproject playlist and it should make sense under the file naming protocol video number 8 as i recall

  • @rayokorie1356
    @rayokorie1356 Год назад

    Hello Tom, this is is quite insightful and you have simplified this more than anyone I know. A quick clarification: In the course of my project, will it be standard to populate the tracking screen with the actual start and finish dates for progressively for the various tasks, prior to a specified 'status date' for general schedule update.

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Thanks for the kind words Ray. And the answer to your question is yes, and if something did not start move it to a new planned date to the right if the status date so you can also see the impact that it has on the critical path.

  • @rakeshranjan7525
    @rakeshranjan7525 2 года назад

    Nice

  • @ziaHashimov
    @ziaHashimov 9 месяцев назад

    Such a great tutorial! Is there any chance that we can get this lecture file where we are able to work simultaneously. Much appreciated.

    • @TomStephensontraining
      @TomStephensontraining  9 месяцев назад

      Hi sorry I missed this. Check my playlists for ms project the course and i have start point files that you can download from google drive listed in the description

  • @sayedelyaskawish3499
    @sayedelyaskawish3499 3 года назад

    Great tutorial. The remaining activities are showing planned dates to the left of the status date, which is not good. It is recommended to use "Update Project" function and "Reschedule non-started tasks".

  • @TheTopfu
    @TheTopfu 11 месяцев назад

    Good video I wonder if you have a video for comercial metal and drywall blue print

  • @kunlefads461
    @kunlefads461 3 года назад +1

    Hi Tom, When do we use % complete and % physical complete in updating our schedule? Do we use one of them or both of them based on the situation in the project.

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +1

      Generally percent physical complete comes in if you are using earned value analysis. It looks at the physical side eg if you have 500 blocks laid out of a 1000 is 50 physical complete the other is time or duation

    • @kunlefads461
      @kunlefads461 3 года назад +1

      Many thanks Tom. Your videos are very insightful!
      Can we input ÷ complete for planned and physical ÷complete for actual. Meaning can a task be complete 50÷ (%complete) with respect to the duration but physically it is 30÷ completed (physical %complete)? If yes which of the % will be used to calculate the actual cost spent?
      Also If this is right to be inputted in tracking chart with variance screen, then can we also adjust the dates to suit the actual while considering the overall critical path?
      The other question is how do we input milestone payments to align with the resource sheet cost calculation for subs. Example: say we pay in 3 milestone payments to a particular sub (deposit 20÷, midway 50÷, then after work 30%). How does this fit into the resource sheet cost per use (end) that calculates cost automatically?

  • @tahahussein2988
    @tahahussein2988 3 года назад

    This is a nice lecture . How can get the rest of videos ? Could you please attach the link? Thank U.

    • @TomStephensontraining
      @TomStephensontraining  3 года назад +1

      Hi Taha,
      Click on subscribe and if you go to the MS Project Playlist (I have many other videos on Construction Mgmt, so you may just want the MS Project videos) you will see all the other videos for MS Project. I plan to be putting more videos up this semester as I'm teaching a cost control course and using MS Project.
      Here are the links in case you still have problems finding them, but as I said once you subscribe it is easy for you to find these and new lectures.
      • Tutorial 1 Introduction: ruclips.net/video/2lxOnohHSwg/видео.html
      • Tutorial 2 Calendars & Columns ruclips.net/video/tuCrTKMPu_Y/видео.html
      • Tutorial 3 How to Maneuver ruclips.net/video/M0Z6m4mWApU/видео.html
      • Tutorial 4 Resources and Costs ruclips.net/video/FjCBCwD5Kzw/видео.html
      • Tutorial 5 Updating a Schedule ruclips.net/video/YtTYfXA1b58/видео.html
      • Tutorial 6 Recovering a Schedule ruclips.net/video/ENTWTIDYkfQ/видео.html
      • Tutorial 7 Adding a Change ruclips.net/video/LIrPbndPiPU/видео.html
      • Tutorial 8 File Saving Protocol ruclips.net/video/XJSF5T4Eogc/видео.html
      All the best!
      Tom

  • @DjFeekx_sa
    @DjFeekx_sa Год назад

    Hello Mr Stephenson
    I would like to ask how do you check variance in terms of percentages

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Hi Afi, As far as I know there is not a calculated column for that. Let me know if you find one

  • @JuricaLoncar
    @JuricaLoncar 2 месяца назад

    Hi Tom. I have a question regrading the update process.
    1) Scenario: if the activity didn't started on time and it is behind the status date. Should we first try to adjust the relationship between activities for instance inserting a lag which will move activity first avalaible day after the status date or we should use this "move" option? That confuses me a bit because the "move" option automatically puts a constraint which impact on the critical path.
    2.scenario
    we have activities that started earlier than expected. The predecessor is in progress, but the following one had a FS relationship. Is it better to use a SS+lag or should we implement a negative lag?
    Thank you in advance for sharing your knowledge.

  • @emakost
    @emakost 3 года назад

    Hi tom. Awesome videos. Can you share the files used?

  • @johnsonchelladurai6829
    @johnsonchelladurai6829 2 года назад

    Hello sir,
    Very good morning. You are doing great job . I am just now started as a Planning Engineer. I have a question, how can I find my planned percentage? We are updating the project activities what are the activities are completed and ongoing activities. How can find how much percentage I should completed in the particular date. Please explain

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Hi Johnson the tracking table should help you. Also using mark on track. Check my playlists for updating videos usually videos 6 and 7 have material on that

  • @amodehdashti9226
    @amodehdashti9226 Год назад +1

    Hi Mr Stephenson,
    Could you please check and explain what happens here:
    While updating a task around minute 13:40, bringing the starting date of a task 1 day ahead (changing it from 10/10/19 to 09/10/19) and then increasing the duration of the same task by one day, the moment the duration is increased and entered the start date changes and jumps ahead to the original date of 10/10/19 (at minute 13:47); so it does not reflect what you needed it to reflect. Can you please advise the reason? Is it the software bug? or is it something that you needed to do to make sure the change happens the way you wanted it... I'm having this issue a lot, changing a date and changing the duration and one would override the other...
    Appreciate your advice.
    Kind regards

    • @kelseymjudd
      @kelseymjudd Год назад

      I have the same question - appreciate any clarification you can provide @Tom!

    • @kelseymjudd
      @kelseymjudd Год назад

      Ah sorry, I see you've answered this in another thread and point to newer videos. Will look there.

  • @dowaahamad4038
    @dowaahamad4038 Год назад

    Thanks a lot, Mr. Tom .. after setting the baseline when am trying to make a mark on track it didn't work..what could be the problem?

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      You need to set a status date and highlight all activities and then mark on track. It will only update the activities to the left of the status date. Thanks for watching

  • @27Madable
    @27Madable 2 года назад +1

    @13:30 You tried inputting an early actual start date. When you set the duration as 10 days, MS project got rid of the actual start. After you input 100%, MS Project automatically inputted dates that were different than what you wanted. This is a problem i am facing when ever I try to input an early start date to my tasks. Could you please clarify what is the best way to do it?

    • @TomStephensontraining
      @TomStephensontraining  2 года назад +2

      Good catch Ahmad, I suspect if I had changed the duration first or just did actual start and actual finish it would not have done that, but i need to check myself. I plan to start doing videos that answer specific questions like yours so I will include this. Also just to let you know don’t be surprised if sometimes Project acts a little buggy, usually it is not the program but sometimes it is, in those cases there is usually a work around. The more you understand how the program works the easier the work around is. I’m always learning something new myself with this. That’s why I like questions like yours. Have a great day.

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Hi Ahmad,
      Check my most recent RUclips posting on MS project update problems. I think it will help in a few ways.

  • @sherifelroba5865
    @sherifelroba5865 Год назад

    Please, Do you have a video about weekly and monthly reports?

  • @phuongbui3331
    @phuongbui3331 8 месяцев назад

    Thank you Tom, Y can up file MPP for me

    • @TomStephensontraining
      @TomStephensontraining  8 месяцев назад

      Sorry I don’t have for this one but if you go to my playlist and check for MS Project the course a download link is listed in the video descriptions so you can follow along

  • @proto83
    @proto83 2 года назад

    I wanted to ask,how can i show on the gantt chart the late start and finish of each task without changing the critical path?

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      You can show it on the schedule table also under format Tab just below the critical path checkbox you can select to show a dark line that is the late start finish.

  • @etoe9405
    @etoe9405 7 дней назад

    Sir Primavera P6 Tutorials with same tutoring quality are requested please.

  • @GeromeVanWyk
    @GeromeVanWyk 10 месяцев назад

    What do you do in a case where you did not set a baseline and the project has already ran for 3 months?

    • @TomStephensontraining
      @TomStephensontraining  10 месяцев назад

      Hi Gerome,
      If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.

    • @TomStephensontraining
      @TomStephensontraining  10 месяцев назад

      Hi Gerome,
      If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.

    • @TomStephensontraining
      @TomStephensontraining  10 месяцев назад

      Hi Gerome,
      If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.

    • @GeromeVanWyk
      @GeromeVanWyk 10 месяцев назад

      @@TomStephensontraining could you provide a link for the above mentioned, that is the playlilst, files and updating video

  • @Popart-xh2fd
    @Popart-xh2fd 2 года назад

    Doesn't Precedences deny setting actual start dates previous to start dates?

    • @TomStephensontraining
      @TomStephensontraining  2 года назад

      Actuals are actual dates so you can enter them. If a relationship changed in real life then change it in the update.

    • @Popart-xh2fd
      @Popart-xh2fd 2 года назад

      @@TomStephensontraining You mean that that precedence needs to be changed.

  • @anandporle2851
    @anandporle2851 Год назад

    how to calculate the overall project planned % and actual progress %

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Are you looking where the information is? It is in the tracking screen. Or are you asking how they are calculated? If so ill try to answer in another video

  • @anandporle2851
    @anandporle2851 Год назад

    how to calculate the planned % Actual % of the project

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Are you looking where the information is? It is in the tracking screen. Or are you asking how they are calculated? If so ill try to answer in another video

  • @albertmabuya6348
    @albertmabuya6348 Год назад

    how can i contact you tom

    • @TomStephensontraining
      @TomStephensontraining  Год назад

      Hi Alberta, check out www.TCIC.ca i teach msproject live online at different times

  • @divinebeing1024
    @divinebeing1024 2 года назад

    Hello Mr Tom, are you there? i really need your help