Kuwait Motor Town | How the project with 10,000 metres of drainage channel has been realised?

Поделиться
HTML-код
  • Опубликовано: 1 окт 2020
  • Kuwait Motor Town | How the project with 10,000 metres of drainage channel has been realised?
    Discover how HAURATON and its experts have implemented the Kuwait Motor Town race track project with over 10,000 metres of drainage channels.
    The recipe for success? Our experts have always been in close coordination with planner Tilke, Achen & Kuwait and the building contractor KCC Engineering & Contracting Co.
    Installed drainage product:
    Highest stability and safety with FASERFIX SUPER, Race Track slotted channel
    Concentrated knowledge. Extensive expertise. Many years of experience with race track construction - Planning of drainage concept of various major projects.
    The fact of Kuwait Motor Town:
    - 5.6 km track length
    - 20 curves
    - FIA grade 1 track, FIM and CIC sprecification circuit
    - over 10,000 Meter metres of drainage channels
    - 49 shipping containers
    - 14,000 km Sea route
    - 16 days on-site support
    ▬ About this channel ▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    💦 Discover the world of HAURATON drainage 💦
    Experience drainage "to go" with HAURATON. We have been internationally successful as a specialist for surface drainage for over 60 years. With our extensive range of products for linear drainage and point drainage, rainwater treatment and infiltration, we are a reliable partner to the construction industry. Products such as our RECYFIX drainage channels have already been used all over the world.
    ►Website: www.hauraton.eu
    ▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    ►Facebook: bit.ly/2MuRNou
    ►Twitter: bit.ly/2wdoZWA
    ►LinkedIn: bit.ly/2MHHXz2
    ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    #hauraton
  • НаукаНаука

Комментарии • 1

  • @yudhisr
    @yudhisr 3 года назад +2

    Mandalika Circuit in Lombok, Indonesia will also use Hauraton drainage system 👍