Simply Rock Driveways & RV PAD

Поделиться
HTML-код
  • Опубликовано: 15 июн 2024
  • Step by Step process in creating a soil "old fashioned quality" rock driveway. Follow Cleared to Land/Scape from the initial phase of clearing the trees and stumps, mulching the material, grading, and rail road tie installation to the final steps of smoothing stone. @clearedtolandscape @asvequipment @caseequipment @shearex
  • РазвлеченияРазвлечения

Комментарии • 9

  • @joebacarella2829
    @joebacarella2829 17 дней назад +1

    It leveled out real nice, the pad and the fresh clean stone looks great, well done.

  • @josemigueljr
    @josemigueljr 18 дней назад +1

    Clicked on this video just to comment that I love the name cleared to landscape and honestly not even gonna lie I'm stealing that 😂

    • @clearedtolandscape
      @clearedtolandscape  13 дней назад

      I'm a pilot and my wife came up with it. She gets the credit. 😁

  • @johnnoeldner8010
    @johnnoeldner8010 22 дня назад

    with that beast,2 hours 15 minutes

  • @liamnator3140
    @liamnator3140 27 дней назад

    I think it took 4hrs to mulch

    • @clearedtolandscape
      @clearedtolandscape  26 дней назад

      2.2hrs for those sections. Total project was about 8hrs Mulching.

  • @offgridwife
    @offgridwife 18 дней назад

    What was the total cost of the job?

    • @clearedtolandscape
      @clearedtolandscape  11 дней назад

      I don’t know if the home owner would like me to share that. But what I can tell you is $3 a square foot installed for the rock driveway plus land clearing.
      It is several times cheaper than concrete.