Including a derailment, lol. The goods shed is always separate from the engine shed, they are never next to each other. The telegraph poles ought to be on the other side, beside the main running line. Otherwise, how is the Signalman going to cross the track safely without tripping over one of the wires? Ever tried running a steamy with only two coaches? That would fit the length of the platform a lot better. By that I mean one corridor coach and one brake coach, like Thomas with Annie and Clarabel.
Great running session.. Drew
Thank you very much
Top gala mate 👍
Thanks Josh
Great running session. Did not know you had a 14XX. I have one which I run up and down my layout with an autocoach. And yes, it's a Hornby one.
I have had it for over a year now and has proved to be a useful engine, mine is a Airfix model and runs really well
Including a derailment, lol. The goods shed is always separate from the engine shed, they are never next to each other. The telegraph poles ought to be on the other side, beside the main running line. Otherwise, how is the Signalman going to cross the track safely without tripping over one of the wires? Ever tried running a steamy with only two coaches? That would fit the length of the platform a lot better. By that I mean one corridor coach and one brake coach, like Thomas with Annie and Clarabel.
Everything has not been completed yet, still making, building and adjusting my layout and hopefully that will please you with what I have created