Very nice 👍 work
Epoxy lagane ke bad kaun se instrument se epoxy ko check kiye please bataiye
❤
Good sir
After HDD section coating, minimum kitne hour ke baad pulling kr sakte hain as standerd time ?
@@ghmustafa4121 after 24 hours as per the standard.
Why we always close the seal at 10 or 2 o clock and what is the overlapping criteria
Because of soil stress and easy to application.
apply of roller not like that.....Roller's job is to let the air out
Paimar .(chemical) 2ta name ki
1 roll main kitna joint hoga 12 inch
26 sleeves
Required sleeve length for 12 Inch pipe is 1150 mm.
26 sleeves.
Sar site kahan chal raha hai yah
Work is were sir
Sar main bhi insulator hun sar kam lag sakta hai kya
Where does this project ?
NFPT Thailand.
Sleeve grade
Lol
Very nice 👍 work
Epoxy lagane ke bad kaun se instrument se epoxy ko check kiye please bataiye
❤
Good sir
After HDD section coating, minimum kitne hour ke baad pulling kr sakte hain as standerd time ?
@@ghmustafa4121 after 24 hours as per the standard.
Why we always close the seal at 10 or 2 o clock and what is the overlapping criteria
Because of soil stress and easy to application.
apply of roller not like that.....Roller's job is to let the air out
Paimar .(chemical) 2ta name ki
1 roll main kitna joint hoga 12 inch
26 sleeves
Required sleeve length for 12 Inch pipe is 1150 mm.
26 sleeves.
Sar site kahan chal raha hai yah
Work is were sir
Sar main bhi insulator hun sar kam lag sakta hai kya
Where does this project ?
NFPT Thailand.
Sleeve grade