Very nice 👍 work
Good sir
After HDD section coating, minimum kitne hour ke baad pulling kr sakte hain as standerd time ?
@@ghmustafa4121 after 24 hours as per the standard.
apply of roller not like that.....Roller's job is to let the air out
Why we always close the seal at 10 or 2 o clock and what is the overlapping criteria
Because of soil stress and easy to application.
1 roll main kitna joint hoga 12 inch
26 sleeves
Required sleeve length for 12 Inch pipe is 1150 mm.
26 sleeves.
Paimar .(chemical) 2ta name ki
Work is were sir
Sar site kahan chal raha hai yah
Sar main bhi insulator hun sar kam lag sakta hai kya
Sleeve grade
Where does this project ?
NFPT Thailand.
Lol
Very nice 👍 work
Good sir
After HDD section coating, minimum kitne hour ke baad pulling kr sakte hain as standerd time ?
@@ghmustafa4121 after 24 hours as per the standard.
apply of roller not like that.....Roller's job is to let the air out
Why we always close the seal at 10 or 2 o clock and what is the overlapping criteria
Because of soil stress and easy to application.
1 roll main kitna joint hoga 12 inch
26 sleeves
Required sleeve length for 12 Inch pipe is 1150 mm.
26 sleeves.
Paimar .(chemical) 2ta name ki
Work is were sir
Sar site kahan chal raha hai yah
Sar main bhi insulator hun sar kam lag sakta hai kya
Sleeve grade
Where does this project ?
NFPT Thailand.
Lol