How permanent stopends accelerated the construction of a basement slab at One Liverpool Street

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • Located directly over the London Underground’s Metropolitan line and Crossrail line, One Liverpool Street is a 10-storey office and retail scheme funded by Aviva and TfL.
    Hear how we collaborated with John F Hunt to deliver a permanent stopend solution to facilitate the build of the 2m-thick basement slab and prevent concrete outflow without any excavation required.

Комментарии •