Installing water diversion bars and regrading forest logging roads

Поделиться
HTML-код
  • Опубликовано: 31 янв 2025

Комментарии • 10

  • @nicknelson4669
    @nicknelson4669 5 лет назад

    Helpful and Informative. Thank you MSU!

  • @scottgreer9780
    @scottgreer9780 3 года назад +3

    Should have thrown those "cobles" in to the settling pond. Would help slow down the erosion within the pond.

  • @peziki
    @peziki 2 года назад +1

    During fast runoff (storm or snow melt), won't the "swale" become a washout?

  • @Flash1857
    @Flash1857 Год назад

    That bulldozer operator is an artist

  • @knowltek
    @knowltek 4 года назад +3

    Build a ton of cell tower roads w water bars...bury the rocks in line in the burm...or that won’t last one season...crown the road...yea my grandad was a country road grader operator...in the west UP...js

    • @jamesthompson8008
      @jamesthompson8008 3 года назад

      Yup - but you know these 'engineering/operators', they're cute at that age.

  • @JR-jn8jp
    @JR-jn8jp 9 месяцев назад

    Aren't these rolling dips?

  • @bencote2219
    @bencote2219 2 года назад

    Once the settling area backs up with water (say it isn’t infiltrating in the early spring due to frozen soil), doesn’t it just back up into the road?
    Ultimately is this really cheaper and quicker than putting a super elevation crown on the road and digging localized ditches?