A master truck driver would drive at a low speed with the tailgate open and tray upright and evenly distribute the rocks like a boss with less need for a grader.
Thanks for showing us how NOT to grade out a new roadway. The trucks should be dumped closer to the roadway. So that the piles slightly overlap the previous work. Then the road grader should work on the high side. Using the already finished roadway as a referance. Use the angle of the blade to catch more, push, or slide off the work material as needed. Once you establish your grade. It's easy to maintain it. Work the grader up and then down the road. Cutting and grading enough so you don't have material bleed from the end of your blade. Doing it this way, you will not only achieve the proper grade on first cut. But the surface will be compacted and the tires of the grader will not sink into the material. You could also have a vibratory roller working next to you. Saving a lot of time. IUOE Local 15 (38 years) Retired.
I guess they also have a grudge against using a spreader box or trucks setting chains on the tailgates. Since that would also lay more even and wouldn't loose your grade as easy as they way they are doing
Yep. Probably needs to have piles like that since the drivers can't/won't spread. Good drivers could spread their gravel, the blade would only have to touch the material once.
Also, they are not using a major feature of the grader. Articulation allows the front wheels to remain on the adjacent finished grade and the tandems pushing behind the piles. Matching finished grade in one pass. Less wear and tear on the machine and less fuel. The operator doesn’t know how to articulate even for a turnaround. He needs a lesson! This is a terrible example of grading best practice.
Motor Graders are a good leveling and grading tool. There is, however, a variation on the asphalt layer that can do this job far more efficiently. It can lay a roadbed foundation or sub-roadbed filler very quickly and more efficiently than even a Motor Grader can. They have been using such a machine for laying highways in my local area for the past several years. Very efficient, and grades the material to be placed as it travels, requires many more dump trucks than seen in this video in order to operate smoothly.
My first reaction was that this operation should have been using a spreader box not a motor grader to reduce segregation of the ABC. But by the end of the video I was impressed at how well the base course looked. The only issue I have now is the loose thickness of the layer (well over 5") and whether they will be able to obtain optimum moisture and density on the roadway, critical for a durable substrate on which the pavement will be constructed.
Likely not. Base course should have been built up in 50mm layers and rolled and watered throughout. I'd hate to see what the density test comes out at.
I always here comments about a blade operator being Really Good! Folks who never operated one just don't realize that they a built for the work! So being impressed so easily, is like being amazed that a Horse.. can Run!
Probably a stupid question, but why not have the truck drivers pull up while dumping so you don't have the huge piles to chop down before you can start smoothing it out?
Probably because it would not leave enough material. If the dump were spaced out your suggestion would make a lot of sens but the dump are very close because they want a thick layer.
To all the safety and “here’s what’s wrong with how they’re doing this job” comments. This is how a big part of the world gets by, for better or for worse, but overall the job gets done. So take a deep breath and appreciate the fact that in developing countries, they’re learning and getting it done.
This was done 2 months, 29 days, 23 hours, and 40 minutes faster than the same job would have taken in Michigan. It's good to not have government and unions slowing down progress!
I could list quite a few problems with how this is being done. As a 25 year veteran in construction, there are a LOT of things being done wrong. Doing an import job like this where you're hauling in whatever materials to be spread out, you do it as if you're painting the road. The trucks need to spread the loads out better. Meaning when they dump, they should pull forward slowly and not allow it to be in such a big pile. Where I'm from, you should be using belly dumps for this. The truck pulls alongside the existing windrow and begins his dump, then the next truck ties on, and so on. All the blade has to do is carry the windrow across at the same grade until the ribbon is completed. Then do the same thing until you get completely across the fill. This is definitely a lesson in how NOT to build a road.
Im no equipment operator, but it looks like he did a great job, interesting to see all the photographers and vodeographers, with drones, got a kick out of the to dump trucks trying to pass each other, thank you for posting and sharing i enjoyed watching!
I love how the cars and trucks and motorcycles all keep on going with the grader working and there is no flag personS around! Talk about managed chaos! I wish north america construction / traffic flow was like this! (yes, need to drive slow around construction sites!)
If the guys tipping were better at their job, the grader wouldn't have to do so much work. I was a truck driver on road construction and we would have got our arse kicked for tipping like that.
Not bad, but not good either. First, it's a motor grader not a dozer so take that stupid mold board off the push block so you can see what your tires are about to drive on. Secondly, the first pass was a wasted pass, and on the wrong side of the piles to boot. Crab out and get those front tires on flat ground. Pull a finish windrow on to your existing base course first. It will be the last thing you bring across. Next, use the full mold board. The second pass he was toed in, but his heal was in the air; nothing good comes of that. Honestly, too much wrong to cover. I'm not trying to be mean, if you want to survive on the blade you have to do better than this
Great video! It brought out all of the has been and wanna be’s commenters. There is a vicious unity in attacking what someone else is doing their way and not your way. . The video never raises any method controversies. But the comment army has shown all of these crafts their supposed errors. I am sure this film was just to show a road crew doing their jobs. I enjoyed watching this work
Maybe if the truck drivers tail gating the gravel instead of dumping it all at once you will get the road surfaced sooner and less grading from the grader
with that many drones in the air you need a air traffic control tower, and now I understand why there are so many construction videos in my feed, everyone is trying to get on that band wagon :(
If this was New Zealand there’d be a million cones and the traffic would be backed up in both directions by stop/go control and a 30kph speed limit. And it would take a month to do what these guys have done in an afternoon.
Where I am the traffic authorities would shit themselves seeing something like this: zero traffic management, not a single high viz, random people flying drones running around in flip-flops on construction site, and even the dog is there! 😄 Here in NZ we get 1200 orange cones laid out on the road on Friday, before anything even looks to start on Wednesday next week let alone have any actual work done 😆
Профессионала сразу видно, дилетант там бы уже сдался. А тут дядька с мозгами, чисто на механике, без GPS Trimble, знает что делает. Глазомер у него в порядке.
I heard dove deoderant supplied all B/O needs for drivers and operators as well as carepackages of flips flops as opposed to steel toed boots no animals or animals were hurt during the making of this video
Spent the whole video getting it to where it would be if the trucks had spread the rock to start with. And wouldn't have had to spend time messing with the last load.
Painful to watch!! The grader guy knew what he was doing ! But the rest were rubbish! Too many flip flops!!! And they made hard work for the grader operator! Spread the loads out for him ! Tip truck and move forward as doing it , ! Painful watching
In NJ USA the entire road would have been closed while traffic is a nightmare I kinda like this way but the drivers here would be cutting everyone off lol
I was initially confused by the traffic driving through the work site. I'm not sure where this is I just know I wouldn't go anywhere near this road work.
Skill?? No.. more like lack of equipment.. just getting it done. Anyone that has ran a grader knows you can't raise the blade as fast as the machine will fall. So that means it's the wrong tool for the job. A scraper would make short work of that. That's the tool that should be used.
Click the link to watch dozer working on this project ruclips.net/video/qJua1UoV7wM/видео.html
do they care about safety ??? you mean they can't are wont shut down the road while they work on it ???
@@stopthemadness398 جج
@@stopthemadness398❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤❤
T😊@@stopthemadness398
@@stopthemadness398.
Hb
One worker operating the grader, 4 drones and no traffic control Nice!
OSHA doesn't exist outside the US🤣
@Linda Orr I prefer the space between my driver's side front and rear doors, when they are open.😉
Most other countries don’t need traffic control. They have this thing called common sense.
@@hamwallet7069 oh man, that would be nice.
...and a dog @07:18
A master truck driver would drive at a low speed with the tailgate open and tray upright and evenly distribute the rocks like a boss with less need for a grader.
I suspect the grader guy of bribing them so he can make more hours
Thanks for showing us how NOT to grade out a new roadway. The trucks should be dumped closer to the roadway. So that the piles slightly overlap the previous work. Then the road grader should work on the high side. Using the already finished roadway as a referance. Use the angle of the blade to catch more, push, or slide off the work material as needed. Once you establish your grade. It's easy to maintain it. Work the grader up and then down the road. Cutting and grading enough so you don't have material bleed from the end of your blade. Doing it this way, you will not only achieve the proper grade on first cut. But the surface will be compacted and the tires of the grader will not sink into the material. You could also have a vibratory roller working next to you. Saving a lot of time. IUOE Local 15 (38 years) Retired.
I guess they also have a grudge against using a spreader box or trucks setting chains on the tailgates. Since that would also lay more even and wouldn't loose your grade as easy as they way they are doing
Because that is EXACTLY how the grader operator likes the piles
@@tjjay2438 Well he's wrong.
Yep. Probably needs to have piles like that since the drivers can't/won't spread. Good drivers could spread their gravel, the blade would only have to touch the material once.
Also, they are not using a major feature of the grader. Articulation allows the front wheels to remain on the adjacent finished grade and the tandems pushing behind the piles. Matching finished grade in one pass. Less wear and tear on the machine and less fuel. The operator doesn’t know how to articulate even for a turnaround. He needs a lesson!
This is a terrible example of grading best practice.
I guess the truck drivers only know how to dump their loads and not how to spread gravel.
No idea of how to run it out. They wouldn't get a job building roads in Australia.
Lap the loads on the previous grade, runout high ,water, roll ,cut ,roll, water ,trim ,roll ,re cut if needed.do it all day
They are good at dumping on roads.
Safety? No problem. Gotta love the guy unlocking the tailgates, 2-way traffic, etc. The good ol' days of road construction. But we have a drone!
With sandals no less,
@@davidspellman3059And no hi-vis clothing or traffic control.
Painful to watch, but that's part of what makes it good I guess, nobody knows what they're doing but they are doing it anyway
Motor Graders are a good leveling and grading tool. There is, however, a variation on the asphalt layer that can do this job far more efficiently. It can lay a roadbed foundation or sub-roadbed filler very quickly and more efficiently than even a Motor Grader can. They have been using such a machine for laying highways in my local area for the past several years. Very efficient, and grades the material to be placed as it travels, requires many more dump trucks than seen in this video in order to operate smoothly.
Dude, it's Cambodia. I'm sure this is as high tech as it gets.
Do you have a link to this?
A stone spreader. Take care.
Thanks for showing us the slow and wrong way to grade.
Maybe this one is not slow for you
ruclips.net/video/zXwrkh0hcQ8/видео.html
@@Dailybulldozer much better operator in this one and actually used it for what it is intended. Thanks
Drivers being tolerant, so nice to see they dont need hundreds of people with stop signs.
If they would only not dump the gravel in one big pile! It would make grading it soooo much easier.
My first reaction was that this operation should have been using a spreader box not a motor grader to reduce segregation of the ABC. But by the end of the video I was impressed at how well the base course looked. The only issue I have now is the loose thickness of the layer (well over 5") and whether they will be able to obtain optimum moisture and density on the roadway, critical for a durable substrate on which the pavement will be constructed.
Likely not. Base course should have been built up in 50mm layers and rolled and watered throughout. I'd hate to see what the density test comes out at.
@@1one3_Racing looks like India. Quality control is strictly optional
@@1one3_Racing doubt they'll test. It's run n gun. A dozer alone wouldv been fine.
Motor grader is the hardest piece of construction equipment to operate.
Try "Brain", it's a forever challenge for most
Sign in UK "Due for completion Summer 2025"
Sign in India "Due for completion 4:30pm"
Why not spread with the dump trucks?
Yeah what a waste of time
I always here comments about a blade operator being Really Good! Folks who never operated one just don't realize that they a built for the work! So being impressed so easily, is like being amazed that a Horse.. can Run!
Probably a stupid question, but why not have the truck drivers pull up while dumping so you don't have the huge piles to chop down before you can start smoothing it out?
Possibly because they are long beds, and raising while loaded can make them unstable. Lots of U Tube vids of loaded trailers tipping.
@@tomrogers9467 Dump trucks in the US haul and dump 18ton like that regularly even on hillsides with long beds, but I guess anything's possible.
Could be they aren't able to drive and change the bed lift angle at the same time. Older dump trucks around here can only do one action at a time.
Probably because it would not leave enough material. If the dump were spaced out your suggestion would make a lot of sens but the dump are very close because they want a thick layer.
Doesn’t seem to be having a problem the way they are doing it at all
12 yrs in road building and after watching this i may blow my brains out...WTF
I have 30 years of experience with an excavator and next Monday, I will learn to drive and work with a Caterpillar 140 H. 😅😅😅😅😅
To all the safety and “here’s what’s wrong with how they’re doing this job” comments. This is how a big part of the world gets by, for better or for worse, but overall the job gets done. So take a deep breath and appreciate the fact that in developing countries, they’re learning and getting it done.
You'd think they would atleast tailgate it
I'm surprised how many professional grader operators there are in the comments
...You would be surprised how many operators are in the world that do this everyday
This was done 2 months, 29 days, 23 hours, and 40 minutes faster than the same job would have taken in Michigan. It's good to not have government and unions slowing down progress!
I am a moter grader oprator
Don't criticize. 8 months ago, before they finally got a grader, there were 124 kelings out there with British army surplus shovels.
Good point.
min. 11:55 What the hell..!??
four drones..!??
I could list quite a few problems with how this is being done. As a 25 year veteran in construction, there are a LOT of things being done wrong.
Doing an import job like this where you're hauling in whatever materials to be spread out, you do it as if you're painting the road. The trucks need to spread the loads out better. Meaning when they dump, they should pull forward slowly and not allow it to be in such a big pile. Where I'm from, you should be using belly dumps for this. The truck pulls alongside the existing windrow and begins his dump, then the next truck ties on, and so on. All the blade has to do is carry the windrow across at the same grade until the ribbon is completed. Then do the same thing until you get completely across the fill.
This is definitely a lesson in how NOT to build a road.
Im no equipment operator, but it looks like he did a great job, interesting to see all the photographers and vodeographers, with drones, got a kick out of the to dump trucks trying to pass each other, thank you for posting and sharing i enjoyed watching!
Operator is okey
Dudes working in flip flops. 😂😂😂😂😂
At least he’s not scamming our elderly
Cambodia 🎉
"Well done! The details you covered on topic channel at [4:30
] were very clear and informative. Can’t wait to see your next video!"
And no-one had safety boots on !!! And where are the rollers ?? Here the unions would have declared that job black !! Greetings from Australia
im sitting here stoned watching this. what a day i had
The safety concern is amazing.
I love how the cars and trucks and motorcycles all keep on going with the grader working and there is no flag personS around! Talk about managed chaos! I wish north america construction / traffic flow was like this! (yes, need to drive slow around construction sites!)
And not an Engineer or Traffic Controller or any signs in sight. Just how the job can / should be done! Excellent Operator.
Which is the reason why roads in India are in such bad condition and why so many deaths occur.
This operator sucks !
Smh
If the guys tipping were better at their job, the grader wouldn't have to do so much work.
I was a truck driver on road construction and we would have got our arse kicked for tipping like that.
the best part is no traffic controllers. They expect the public to figure it out on their own.
i’m certain that this was one of the most painful things i’ve ever watched.
good job🎉
Not bad, but not good either. First, it's a motor grader not a dozer so take that stupid mold board off the push block so you can see what your tires are about to drive on. Secondly, the first pass was a wasted pass, and on the wrong side of the piles to boot. Crab out and get those front tires on flat ground. Pull a finish windrow on to your existing base course first. It will be the last thing you bring across. Next, use the full mold board. The second pass he was toed in, but his heal was in the air; nothing good comes of that. Honestly, too much wrong to cover. I'm not trying to be mean, if you want to survive on the blade you have to do better than this
i don't know anything about asphalt roadways but this looks like literally the worst program on earth.
Great video! It brought out all of the has been and wanna be’s commenters. There is a vicious unity in attacking what someone else is doing their way and not your way. . The video never raises any method controversies. But the comment army has shown all of these crafts their supposed errors. I am sure this film was just to show a road crew doing their jobs. I enjoyed watching this work
Kontruksi jalan yang sangat Top...
That’s how they pave roads in Mexico! Seen it hundreds of times !
Waot! You forgot to spray the penetrationg primer before you dumped the asphalt, now it all has to come up.
But they do not have any penetrating (or "penetrationg" as you put it )primer. Kinda like you not having spellcheck.
Trucks can spread a loads in layers not piles as well
Op is liking every comment no matter what it says
would go faster if the grader started on the other side.
Bulldozers after the dump trucks, Graders are the finishing passes...
Not if you don't own a bulldozer.
A comedy of incompetence
Developing world road laying in action, i wonder how many of them wore sandals.
All of them by the looks 😆
Beacons off but at least there are yellow streamers
Seems to me the trucks could have spread out the gravel and made a lot more efficient use of grader.
the Indian boys no how to roll
Un travaille de professionnels.
Maybe if the truck drivers tail gating the gravel instead of dumping it all at once you will get the road surfaced sooner and less grading from the grader
Free compaction
You think?
This is my second day on a blade and I can tell you nothing about this is right
Jalan Komatsu Indonesia 0:22
with that many drones in the air you need a air traffic control tower, and now I understand why there are so many construction videos in my feed, everyone is trying to get on that band wagon :(
Everyone’s talking about how they’re doing it wrong and are using the wrong equipment without proper safety like they aren’t literally in India
I was watching this vid on drones when a Grader interrupted the shot...
a good tipper driver would run a 200mm layer straight out whilst constantly tipping by keeping the backdoor nearly shut and secured with chains.
What da hell no primer on AB
Ada dron
Why do it the right way, when you can do it the wrong way?
If your gona dump and not spread why not use a dozer who ever is in charge of this clown show needs to be fired
Just let them work !
If you have a good motor grader operator, and you want to keep that operator, you don’t do this to them.
Why wasn't this job done at night when the traffic is less?
You gotta be kidding.
God bless you
If this was New Zealand there’d be a million cones and the traffic would be backed up in both directions by stop/go control and a 30kph speed limit. And it would take a month to do what these guys have done in an afternoon.
Fire the truck drivers should have spread and saved fuel plus time
Where I am the traffic authorities would shit themselves seeing something like this: zero traffic management, not a single high viz, random people flying drones running around in flip-flops on construction site, and even the dog is there! 😄 Here in NZ we get 1200 orange cones laid out on the road on Friday, before anything even looks to start on Wednesday next week let alone have any actual work done 😆
Haha so true. Dont forget to mention that the end results will have to be repaired or completely redone 6 months later
Chur bro!
Last 2 minutes of the video, "operator" was like: oh yeah, this thing has a blade on the front.
Профессионала сразу видно, дилетант там бы уже сдался. А тут дядька с мозгами, чисто на механике, без GPS Trimble, знает что делает. Глазомер у него в порядке.
I heard dove deoderant supplied all B/O needs for drivers and operators as well as carepackages of flips flops as opposed to steel toed boots no animals or animals were hurt during the making of this video
РАША!!! Вот так нужно строить дороги а не заниматься воровством государственных денег!!!Дорожных воров к ответу!!!
Exelente buena encamada y exelente alineación
road safety is just a after thought there i guess
Spent the whole video getting it to where it would be if the trucks had spread the rock to start with. And wouldn't have had to spend time messing with the last load.
Boa
I mean if you only have 1 machine and 1 guy I guess, but this looks much harder than it should have ever been.
That's the point. They really do have 1 machine and 1 grader operator.
I see it but don't believe it.
Heavy mobile equipment operator for 55 years, mining and construction ex army engineer.
I like how they have the traffic on the working side of the road and not the finished side. Don't want to be too safe
Nothing about this operation is safe
No kiero para caro solo tren sin tanto lujo despues c asen
So I guess dump trucks cant drive and dump at the same time???
Ah, 3rd. world countries, Safety First, ha.
Better youse a High Speed Dozer 764X
No PPE. No boots. People just driving thru the grade like it's open...sheesh.
Park however, drive wherever, run in flip flops, not to mention the subject of the video. My anxiety is totally fine. Thanks.
Painful to watch!! The grader guy knew what he was doing ! But the rest were rubbish! Too many flip flops!!! And they made hard work for the grader operator! Spread the loads out for him ! Tip truck and move forward as doing it , ! Painful watching
I am surprised those trucks carry that much of gravel. That must be near 30 tons.
Ese tienpo k pierden esa makinas aser otro trvajo o k c bayan. Estrovan
The dump truck drivers are clueless. That contractor is wasting huge amounts of fuel and labor, not to mention wear and tear on the equipment.
In NJ USA the entire road would have been closed while traffic is a nightmare I kinda like this way but the drivers here would be cutting everyone off lol
I was initially confused by the traffic driving through the work site. I'm not sure where this is I just know I wouldn't go anywhere near this road work.
Third world road construction. I suppose if it works what's the problem.
10000 mas makinas d todo ekipo para umentar. El trabajo asi pico bonito la ceiva hondura sero
In the first heavy rain this asphalt will be ruined
Skill?? No.. more like lack of equipment.. just getting it done.
Anyone that has ran a grader knows you can't raise the blade as fast as the machine will fall.
So that means it's the wrong tool for the job.
A scraper would make short work of that. That's the tool that should be used.