NEW LRT 1 EXTENSION | TRAFFIC vs TRAIN

Поделиться
HTML-код
  • Опубликовано: 11 дек 2024

Комментарии • 10

  • @kiko7696
    @kiko7696 9 дней назад +3

    Nice content. Keep it up!

  • @rgnald
    @rgnald 10 дней назад +3

    tried it, lalo sa las pinas traffic kht d rush hour, WHOLE DAY RUSH HOUR dyan sa las pina. So convenient tlaga ang lrt lalo sa malapit sa station na yan. 100 percent sobra nakatulong ang LRT, hasssle lang nga sa medyo malayo sa station na medyo madami sakay like me pero iba paren ang maipit sa traffic, sandali lang ak maipit sa traffic d na ak comfortable dhil comparison ko sa lrt

  • @johnnylektric
    @johnnylektric 8 дней назад +1

    Nice video. Grabe sana meron na nito nung 90s hehe. Meron ba sa inyo ang may alam ano yung landmarks near Sucat station? Saan siya malapit?

    • @Public_OTV
      @Public_OTV  8 дней назад +1

      @@johnnylektric sa harap po ng SM SUCAT ang station. 😊

    • @johnnylektric
      @johnnylektric 8 дней назад

      @@Public_OTV Thank you!! I appreciate the reply and the video!

  • @Jeanette-w2p
    @Jeanette-w2p 11 дней назад +2

    Akala ko sa ibang bansa.😮

  • @strong-willed.ninja.403
    @strong-willed.ninja.403 10 дней назад +1

    Why not saying - please mind the platform gap?

    • @Public_OTV
      @Public_OTV  10 дней назад +1

      Yes, not all passengers may notice the gap. These safety reminders should be regularly mentioned, especially during rush hour.

  • @louminamilana5272
    @louminamilana5272 11 дней назад +3

    LRTA CLASS 14000 SIEMENS/Bombardier 5TH GENERATION TRAIN
    Stock Type: Light rail vehicle
    In service: TBA
    Constructed: TBA
    Floor height: 0.9 m (2 ft 11+7⁄16 in)
    Platform height: 0.69 m (2 ft 3+11⁄64 in)
    Doors: 5 sets of 1.3 m (51 in) double-leaf plug doors per side
    Train Length: 59.59-89.37 m (195 ft 6+1⁄16 in - 293 ft 2+1⁄2 in)
    Car Length: 29.79 m (97 ft 8+53⁄64 in)
    Width: 2.5 m (8 ft 2+27⁄64 in)
    Height: 3,525 mm (11 ft 6+25⁄32 in)
    Acceleration: 1.0 m/s2 (3.28 ft/s2)
    Deceleration: 1.3 m/s2 (4.27 ft/s2) (service) & 2.08 m/s2 (6.82 ft/s2) (emergency)
    Auxiliaries: Static converter
    HVAC: Roof-mounted duct-type air conditioning
    LED Destination Boards: 3
    Electric system(s): 750 V DC overhead catenary
    Current collector(s): Schunk single-arm pantograph
    UIC classification: Bo′+2′+2′+Bo′
    Bogies: Inside-frame type
    Seating: Longitudinal
    Track gauge: 1,435 mm (4 ft 8+1⁄2 in) standard gauge
    Number built 168 vehicles (56 sets, initially 3-car sets)
    Trainsets: 56
    Articulated Sections: 3 Similar To 1000 Class
    Formation: 3 cars per trainset
    Fleet Numbers: 14001-14068
    Capacity: 748-1,122 passengers (162-243 seats)
    Traction System: (Bombardier MITRAC 1508C IGBT-VVVF)
    Speed: 60Kph
    Bogies: 2
    Jacob Bogies: 2
    Gangways: 2
    Pantograph: 1
    Axle: 8
    Seats: 13
    Wheel Chair Sign: 2
    Handrails Doors: 16
    Handrail Ceilings: 18
    Handrail Handles: 108
    Interior Route Maps: 2
    Car Body Construction: Stainless Steel
    Exterior Rectangle Red Lights: 10
    Interior Circle Yellow Lights: 10
    DOTR & LRTA Logos Exteriors: 4
    DOTR & LRTA Logos Front & Rear: 2
    Border Lines Color: Red
    Build At Germany
    Manufacturer: SIEMENS Bombardier
    Depot: Baclaran & Zapote
    Lines Served: LRT Line 1
    Coupling System: Semi-Permanent
    Operators: Light Rail Manila Corporation
    Power Output: 1.31 MW (1,760 hp) (3-car train)
    Wheelbase: 1.9 m (6 ft 3 in) (motor bogies) & 1.8 m (5 ft 11 in) (trailer bogies)
    Wheel Diameter: 660 mm (25+63⁄64 in) (new)