Getting ready to depart of Indian Pacific Train at Sydney Central Railway Station Aus

Поделиться
HTML-код
  • Опубликовано: 30 апр 2018
  • Getting to depart of Indian Pacific Train at Sydney Central Railway Station Australia 3/08/16.
    Watch the working life of The Indian Pacific Train including passengers disembarking, unloading/loading, cleaning of rail cars, shunting of rail cars and power locomotives. The train has a total of 24 carriages that day over 3 platforms.The engine first picks up the car carrying carriage then shunts back to pick-up the two remaining Passenger, Lounge and Baggage carriages.
    A 4 hours long .drawn process to prepare the train for the next departure to Perth at 3pm.
    4449
  • Авто/МотоАвто/Мото

Комментарии • 6

  • @gyanpoon63
    @gyanpoon63 3 года назад +2

    INDIAN PACIFIC GREAT TRAIN. ...👍👍👍👍

  • @brisbanepublictransportvlogs18
    @brisbanepublictransportvlogs18 6 лет назад

    Awesome video and that rain.

  • @daviddowling9830
    @daviddowling9830 5 лет назад +1

    I’ll never understand the use of one locomotive on such a challenging route.
    Yes,I sometimes see two but not on every train.
    I rode this route in my youth so long ago that steam was used beyond Kalgoorlie,made for many memories.

    • @turnbs
      @turnbs 5 лет назад

      One locomotive can adequately run the timetable with a single consist.As the train only runs once a week it is usually a double consist, which requires two locomotives to run the timetable between Sydney and Parkes, and one locomotive from Parkes onwards.

  • @Crintingnut
    @Crintingnut 2 года назад

    Is that a vehicle for passenger cars at 3.08?

    • @beagle7622
      @beagle7622 8 месяцев назад

      No It’s luggage & probably food & supplies . The trip takes 3over 3 days.