East Broad Top - A Relaxing Ride with Diesel M-7

Поделиться
HTML-код
  • Опубликовано: 9 авг 2022
  • On a hot, humid weekend in August 2022, I traveled to Huntington County, PA to visit the East Broad Top Railroad. With steam power not yet ready (but coming very soon at the time of filming), stalwart diesel M-7 takes charge of the regular excursions between Orbisonia and Colgate Grove.
    The video shows the excursions in geographical order, as well as the first runs of one of the EBT's new enclosed coaches!
    Since 2020, the newly-formed East Broad Top Foundation has been working to preserve and restore this historic narrow-gauge railroad. You can support their efforts and buy tickets at: www.eastbroadtop.com

Комментарии • 15

  • @nitroradio99
    @nitroradio99 Год назад +2

    Great footage. Feels like I was there. 🙂

  • @Im_here170
    @Im_here170 Год назад +2

    Awesome 😎

  • @Jaidyn228
    @Jaidyn228 Год назад +1

    Tonners are just the cutest engines

  • @northpennvalleysteamrailroad
    @northpennvalleysteamrailroad Год назад +2

    Awesome video friend

  • @nectimusmaximus
    @nectimusmaximus Год назад +2

    Good stuff. Talked to you and Subscribed.

    • @trainmaster844
      @trainmaster844  Год назад +2

      Thanks! 🙏🏻 Footage of the shop tour and my visit to the Trolley Museum are on the way.

  • @safetran50
    @safetran50 Год назад

    OMG I WAS THERE YESTERDAY!!!

  • @atsfevan0242
    @atsfevan0242 Год назад

    I’m guessing your gonna be back at EBT once Steam is back?

  • @nicholasmedovich6729
    @nicholasmedovich6729 Год назад

    Steel coach isn’t numbered or lettered yet.

    • @trainmaster844
      @trainmaster844  Год назад +1

      That will be applied in due time. During the time of my visit, it was literally the first test runs they conducted with it.

    • @nicholasmedovich6729
      @nicholasmedovich6729 Год назад +1

      @@trainmaster844 that doesn’t surprise me. Usually a test run or two must be done so there are no flaws in the integrity of the construction

    • @wedelacresdepottrains9060
      @wedelacresdepottrains9060 Год назад

      They said they didn't want to apply vinyl lettering and cheapen it. They are going to have the lettering applied by professional that does hot rod striping , signs, etc.

  • @douglaswilliams8882
    @douglaswilliams8882 Год назад

    They are get a another passenger car so it's on

    • @amandahammond2691
      @amandahammond2691 Год назад

      Plans are for a total of three coaches and a combine (with wheelchair lift). Two coaches have already been delivered