ACI Field 1 - ASTM C172 Sampling Freshly Mixed Concrete - CRMCA Online Concrete Procedures (v2-2022)

Поделиться
HTML-код
  • Опубликовано: 3 янв 2022
  • CRMCA presents the Online Concrete Procedures for preparing for ACI certifications.
    C172/C172M-Sampling Freshly Mixed Concrete
    **Updated for 2022**
    ------------------------------------------------------------------
    CRMCA website: www.crmca.org/
    CRMCA Registration for ACI: www.crmca.org/american-concre...
    ACI website: www.concrete.org/
    ASTM website: www.astm.org/

Комментарии • 17

  • @AliKFahad
    @AliKFahad 8 месяцев назад

    Thanks for making C172 very easy and simple, Appreciate your efforts.

  • @rupeinspections5611
    @rupeinspections5611 2 года назад +1

    Thanks for sharing this with me and having an up to date video

  • @jesusglopez8430
    @jesusglopez8430 Год назад +1

    Excellent very educative and informative, Thanks.

  • @johnkennedy3602
    @johnkennedy3602 6 месяцев назад

    The newest ACI Field Testing Technician Grade 1 book (CP-1 40th edition printed in January 2023) shows what you call the "open top mixer" as a 'continuous mixer truck." I'm wondering where the discrepancy is. Our company owns a few and we call them "Zimmers."

  • @meharzaib3498
    @meharzaib3498 Год назад +1

    Hi
    Are before sampling the contentious mixture should be mix or not if yes so how much time to give for mixing?

  • @Whoooo00
    @Whoooo00 Год назад +1

    Thanks

  • @muhammadhqadhir1468
    @muhammadhqadhir1468 6 месяцев назад

    I have a doubt we should collect samples after 10% for example if we have rotating drum mixer 10m³ of total volume we could not use 1st 1m³. This 1m³ we have to dump on a receptacle or pour into a structur?

  • @abduljabbar-bg9bi
    @abduljabbar-bg9bi Год назад +1

    Good job

  • @winstonnelson946
    @winstonnelson946 Год назад +1

    You say samples shouldn't be taken from the first 10% or the last 90% of the batch... don't those, combined, equal the entire batch?

    • @nathan_steffen28
      @nathan_steffen28 11 месяцев назад

      First 10% of 2/3 and not 90% of the 3/3

  • @hayderhayder506
    @hayderhayder506 2 года назад +1

    Can we use cube for sampling instead of cylinder

    • @AllforOne_OneforAll1689
      @AllforOne_OneforAll1689 Год назад

      No, not for heavy or lightweight concrete. Either 4x8" or 6x12" cylinders are compliant.

  • @user-cr7lo4tk5h
    @user-cr7lo4tk5h 3 месяца назад

    Question, you said do not take sample from the first 10 % or last 90% of the batch. Can you explain what you mean by this? That equals 100% so when do you collect sample?

    • @jayinla228
      @jayinla228 Месяц назад +1

      It means your samples are taken between 10-90% of the batch, not the first 10% or the last 10%

    • @crmcacoloradoreadymixedcon234
      @crmcacoloradoreadymixedcon234  28 дней назад

      @jayinla228 is correct. The video states it incorrectly and will be updated to state "after the first 10% and before the last 10%" soon!

  • @guillermocentella4802
    @guillermocentella4802 Месяц назад

    2:30 is this correct?

    • @crmcacoloradoreadymixedcon234
      @crmcacoloradoreadymixedcon234  28 дней назад

      if you mean the location of the sample being take, yes. It is worded different in various documents thought all reference the ASTM Standard.