Model Railroad Track Laying Tips Curves Easements and Superelevation

Поделиться
HTML-код
  • Опубликовано: 27 ноя 2024

Комментарии • 444

  • @RonsTrainsNThings
    @RonsTrainsNThings  7 лет назад +53

    PLEAS READ THIS NOTE: Ok, folks, I clearly made a big boo-boo in this video that I need to clear up. When measuring out easements, your TOTAL easement length should be 60% of your curve radius, so your measurement on each side of the point at which your circular, constant radius curve would begin would be 1/2 that. In other words each side of that point would be 0.6r/2. My sincere apologies. I don't know how I did that. Thanks to wcfn100 on therailwire.net for catching it for me. (EMBARRASSING!)

    • @MMRails
      @MMRails 7 лет назад +2

      Ron's Trains N Things So instead of 10 inches yours should be 5? I'm doing a 34.5 inch radius. I'm wondering if I should try your trick. Just not sure because of the mods. What length would my easement be with 34.5? -Mark

    • @woodybear8298
      @woodybear8298 6 лет назад

      10.3"

    • @kevin0007
      @kevin0007 6 лет назад +1

      No problem. Senior moment!! :)

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      Lol true.

    • @danoconnor615
      @danoconnor615 6 лет назад

      Ron, great video despite your boo boo. I'm no mathmagican, so please bare with me. So what your telling me, that easement would be basically 5" on each end of the radius, correct? And since my layout is in HO, would those numbers be the same?...Dano

  • @discgolfillustrated2640
    @discgolfillustrated2640 Год назад +4

    Over 50 years of modeling railroad scenes and I hate to admit it , but I’ve never considered these two factors. Thank you a great video.

  • @chugwaterjack4458
    @chugwaterjack4458 Год назад +4

    For the superelevation transition: Zero right at the tangent to spiral (T.S. in RR staking), first tape starts at 1/4 of the spiral, 2nd tape at the 1/2 point, 3rd tape at the 3/4 point, and full super right at the spiral to curve (S.C.) Otherwise, your super is starting on the tangent, and reaching full super before the full curve, resulting in rocking of the train. Max super is a 10% cross slope, or 5" super (scaled properly) at top rail. This from a former UPRR survey party transit man from the days of manual instruments, hand calculations from the tables, and actually staking track.
    Now, having nitpicked that, I will say, and give you full credit for, ANY transition and ANY superelevation on a model railroad is GREAT! Thanks for the video.

    • @RonsTrainsNThings
      @RonsTrainsNThings  Год назад +1

      Thank you much for this. The input of the actual folks who do/did this actual work is extremely valuable. I need to make a renewed/updated video on this topic.

  • @kevinsharp6323
    @kevinsharp6323 2 года назад +1

    not sure why you are apologising for a minor error - we all need to take care to check for ourselves, and no one is perfect either, this video is excellent and informative, and thanks for taking your time to do so.

  • @karlmelange6911
    @karlmelange6911 Год назад

    A lot of fantastic information! Thank so much for taking the time to create this. I have recently been put on permanent disability, and I have way too much time on my hands. Especially being March in Michigan. I’m just getting started on a small display, on a bay window. The best way to make it work and look scale, is with the proper curves. You were a HUGE HELP! I sincerely appreciate it!! Karl

  • @markhenning2813
    @markhenning2813 2 года назад

    The best and easiest description of Superevetions I've seen. I intend to use Easements and Superelevations on my Golden & Silver Plume Excursion Line an Nn3 layout based on the Colorado & Southern - Clear Creek Line. My track will all be hand-laid...

  • @anthonydzimira2887
    @anthonydzimira2887 Год назад

    I am brand new to this layout thing, always laid flat on floor . You are awesome! I wondered about this technique but your the first to explain perfectly ❤

  • @davidmuse7004
    @davidmuse7004 5 лет назад +2

    Ron, glad that you are running this again. I'm glad it's back, the information is never old and always needed. Rebuilding my layout and one of my issues from before was the "curves". This video sved me from commiting the same error. Thank you for reposting and sharing with eveeryone. **Note Ron: It's not to much information or to technical.
    Muse

    • @RonsTrainsNThings
      @RonsTrainsNThings  5 лет назад

      Hey, David. I am so glad this video has continued to be of help to so many people.

  • @DieyoungDiefast
    @DieyoungDiefast 3 года назад +1

    I have to admit, your tip for setting super-elevation with masking tape is brilliant. I was looking at using 0.5mm plastic strip. Tape will make the job a lot cheaper on 40m of scenic trackwork. Love your series.

  • @burgermeister7244
    @burgermeister7244 12 дней назад +1

    You should teach math to kids. You're great. If I had had a math teacher like you in school I would have been a straight A student.

  • @sjbolton72
    @sjbolton72 6 лет назад +2

    Thanks for the info. A tip for anyone having trouble with the flexible wood to make the easement curve is find an arts store where you find draftsmans tools (mechanical pencils, compass sets etc) and grab yourself a "flexible curve". Its a common cheap tool for exactly this task of making smooth arbitrary curves to join two lines/curves. Its a bendable length of rubber with a metal core which holds the curve position (its not springy so no need to anchor it). being easy to bend and hold its shape its easy to make pleasant curves joining two lines and easy to adjust it smoothly before you mark. downside is it'll hold small kinks if you put them into the curve and you have to work them out before marking. its also great for edging walls/fences trackside and for contouring roads on your layout smoothly too. far better than just a piece of string.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      Great tip, thanks.

    • @monopod1
      @monopod1 5 лет назад

      I am a draughtsman also ..... If you want an accurate and smooth curve, follow Ron and DON't use a flexicurve. They are OK for approximations . I always use a beam compass ( trammels.)

  • @AC-rf1ud
    @AC-rf1ud 4 года назад +1

    Absolutely fantastic! One of the things that always bothered me was that abrupt transition into the curves. Thanks for your work on this problem and the bonus of super elevation! My wife and I are planning a new n scale layout and this method will be employed as we build. Once again, thank you,

  • @kevinching1975
    @kevinching1975 5 лет назад +3

    Thank you, Ron, this is so helpful as I am starting to lay track on my railroad and I want it to be as near to typical as I can. I live in Rangiora New Zealand and attend our Baptist church every Sunday.

  • @truth4wtc752
    @truth4wtc752 7 лет назад +1

    Hello from south-central PA!
    @23:16
    On a shoestring budget, I decided to model my own ''Bullet Train". I took an nice old Alco and grafted a portion of a small section of a plastic disposable razor handle on to the front to give it an aerodynamic "look". Used JB Weld and a Dremil to blend it all together.
    For the "coaches", I took 3 identical small short reefers and replaced their plastic wheels with the larger metal ones for enhanced weight distribution. I removed all the couplers and (after removing the horns, filled everything in with JB Weld, sanded everything completely smooth), I spaced the 4 units .5" apart and applied a thin layer of school glue over all the top and side surfaces, and then a very thin section/single layer of fabric applied over the roofs and the sides which effectively holds the entire thing together in place of the couplers. Painted it and with a tiny piece of electrical tape made a mean-ass looking windshield
    Questions:
    Is 7 degrees elevated bank too much for the train to operate at slow speeds?
    If so, what would you consider the maximum in an extreme layout?
    Would the trains ability to handle the curves benefit if additional weight plates were to be added to the 3 reefers?
    Any and all information is greatly appreciated.
    Thanks!

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад +1

      Sounds like an interesting project. I'd love to see some pictures. Yes, I would say 7 degrees is probably too much--you would likely develop a problem with string-lining cars. I would say 3 or 4 would be ideal. Extra weight will help, but you need the extra weight in the middle of the train.

    • @truth4wtc752
      @truth4wtc752 7 лет назад

      So like 3 extra plates in the first reefer, 2 in the 2nd, and one extra in the trailing car? (identical weight plates to what originally came in the cars)

  • @francisresch6654
    @francisresch6654 2 года назад

    Thanks Ron. The segment on super elevation is exactly what I was looking for. Great piece.

  • @TrashMan2008
    @TrashMan2008 7 лет назад +2

    Ron thanks so much for the shout out. An excellent video and a great way to start. Thanks so much for your talent and efforts. Looking forward to the live show. Peace be with you,
    Art

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks, Art...and good to know your name. I missed it before. I look forward to the live show. I think it will be a lot of fun.

  • @Andy-q9e
    @Andy-q9e Год назад +1

    Hello Ron,
    Re: railroad ties, and bridges.
    I've been watching most of your videos for a couple of years now, and am subscribed to your channel, (but under a different name). Your videos are terrific. I'm sure they'll be a big help to me when I start a model railroad sometime in the near future.
    In the real world railroad ties are square timbers, about 8 inches by 8 inches. Obviously about 3/4 of that is hidden, buried in ballast. Only the top 2 inches or so can be seen. I guess that's why model railroad ties are so thin. No sense wasting money on a lot of plastic material that will be hidden from view in the ballast.
    On every model RR video I've seen, where there is a bridge or trestle, and there is therefore no ballast, the ties ARE SQUARE. Is that portion of track hand laid? I know that no one likes to do hand laid track, but it LOOKS like that's how the track must've been placed. And I've never heard anyone in a model RR video talk about track installation on steel truss bridges, girder bridges, or trestles, whether steel or wooden. What's the deal?
    Also, IF commercially made model track has thin ties because that's the part that can be seen above the ballast, then why don't modelers put a thin coat of ballast on the roadbed first and then nail down the track on top?
    I am very interested in hearing your comments about this. Thank you in advance.

  • @derf9465
    @derf9465 4 года назад +3

    Now I've got a use for bunk beds!!!! Double storey, epic idea.

  • @tommiemartin6457
    @tommiemartin6457 7 лет назад +1

    Great video. I missed the formula for the transition area of the curve but watched it again and got it. There are a lot of nice pointers or tidbits that not only apply to track planning but track laying as well. I really enjoy how you explained the gradual elevation of the " super-elevated " rail and the reasoning of it's use vs the forces in real rail methods.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks for watching. Please read the note I added in comments to this video as I misspoke regarding the length of the easement. What I said will work, but is double the length needed. I forgot to divide by 2. Math got me. UGH.

  • @haroldsmuck3569
    @haroldsmuck3569 6 лет назад +1

    I have been enjoying your videos, very clear for the moderate to advance modeller, looking forward to more videos from you, thanks for posting your ideas, and tried and true ideas. Thanks again.

  • @honestgbfan5324
    @honestgbfan5324 6 лет назад +2

    I will be using flex track for my next N scale layout so I am glad to have found this video, thanks. On my previous layout years ago, I was very disinterested in laying the flexible track that I have now grown to love! So with my Atlas Snap Track I used an 11" piece of track at the beginning and end of a 180 degree curve with 9.75" radius. Granted it took a little more space than my track plan showed, but it did work and was close enough to make it fit with a few modifications. It was not as good as your method but for somebody of my limited skills and patience at the time, I was happy with it. :)

  • @SupermaNLYSRR
    @SupermaNLYSRR 6 лет назад +1

    Very well taught and explained. I enjoyed seeing the painters tape trick for super elevation. Great job Ron.

  • @barrie9914
    @barrie9914 4 года назад

    Thanks for this and all your other VDOs,
    I used XtrkCad which is a free layout design program that automatically sets out easements and saves a lot of manual work figuring it all out.
    I designed a large club layout with this program and the track was perfect on the first lay. When the track plan is drawn the secret is to create a 100mm x 100mm grid base on the Cad image (I'm Aussie so were metric here). Make sure you create a reference point on the cad image of the layout on the computer that can be identified on the actual base board. Then draw on the actual base board in pencil a 100mm x 100mm grid that covers the whole area that the track will be laid and that corresponds to the computer grid. All that needs to be done now is to hold the cursor on a point where the track centre crosses either a vertical or horizontal grid line, XtrakCad will give a X,Y coordinate and a measurement can be easily calculated from the crossing point back the the corner of that 100mm grid. Plot that point on the actual layout and place a panel nail. Do this for the rest of the track as it transitions across the grid on the computer. You'll end up with a line on nails at every point where the track centre crosses a grid line on the baseboard. Place a flexible strip of timber on the base board and bend it around the nails and scribe a line from nail to nail to get your track centre at every 100mm or so. This is how you convert a computer image to a full size base board. I have heard of people printing out the image at full size on paper sheets and then taping them together before laying the plan on a base board but that takes a lot of paper on a large layout!
    Keep up the great VDOs.
    Cheers,
    Barrie

  • @ioanekirarahu951
    @ioanekirarahu951 5 лет назад

    Tips on hand-laying track would be welcome. I have pretty good results laying my own S scale track (code 100 rail or less), but there is always room for improvement, and I love to see what others do, and to see their techniques. I build my switches from scratch kind of like the "Fast Tracks" method, only without their expensive, inflexible jig. I use a paper template usually of my own design taped down onto a pine board, to which I start by taping down the PC board ties. But the method is just the same as what Fast Tracks espouses, carefully using a track gauge throughout the process. Using paper templates, I can easily design and build whatever kind of trackwork I can imagine. Without having to invest in a large number, of expensive jigs, one is unlimited in the kind of trackwork (including very unusual or unique trackwork) that can be built. built. Love your channel, but I only discovered it today. My wife dabbles in N scale, but it is too tiny for me. I like the size, and heft of S--"scale S," that is, no "Flyer or hi-rail on my track. Woof.

  • @keeskors2690
    @keeskors2690 7 лет назад +1

    Thanks a lot Ron for the easy to understand explanation of both the subjects. It's gonna take me some time to convert it to the metric system but I'm sure I'm gonna work it out.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад +1

      +kees kors Even in metric the formula works: offset = r/64;l easement length each side of your curve transition point =.6r/2.

  • @williamarseneau1575
    @williamarseneau1575 7 лет назад +1

    I laid all of my curves on foam using an eight foot by 1 inch piece of masonite using your method but used nails to hold in place. If the curve was longer than 8 ft, if you have placed enough nails, you the just slide it on around to where you need it.
    Thanks for the video.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      That certainly sounds like it would work in much the same way. I have seen others use Masonite or tempered hardboard strips to do this. There are many things that would work well for the "bent stick" in this method.

  • @rg1809
    @rg1809 6 лет назад +1

    Professor Ron, great lecture! I'm in the beginning stages of a small 2 x 4 N scale layout and this will definitely help. What I like about your videos is explanation with demonstration, step by step.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      +R G Thanks. That 2x4 can be a lot of fun--ssuper detail and model it like crazy. It is so much easier to do tons of detail on a small layout than on a large one.

  • @scottfirman
    @scottfirman 6 лет назад +1

    I just picked up two N - scale train sets an extra engine and a passenger car all for $70. The steam engine by its self was stickered at $65. I had an N- scale train layout in a bar back in 1990 but lost my train room to my second daughter. Now my kids have grown and gone, I may build a new layout eventually. I used mostly flex track on my first layout and ended up building it into a bar a teacher at the school I worked at. It measured 3 foot by 6 foot. I already had a 3x4 foot layout so,I was able to almost double my layout size. I made a custom vynal cover for it and had a double line going with a double reversed loop. I may do that again as I found I could really pack lots of trains on that setup.
    I am thinking of modular this time. Something that can be unassembled and stacked. My first layout used phone line for wiring. All track sections had wiring every few feet so there were no shorts. zit would have been easy to do a DDC. I didnt get my curves correct on my radius so longer cars never worked on my layout. Mostly I used flex track and hand ballast everything. All my buildings were scratch built using balsa wood, plaster brick moulds and time, lots of time. I even used small pebbles to build a retaining wall.
    I dont know when I will start my new layout.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      That sounds pretty cool. I hope you are able to get that new version going soon.

  • @slayer7826
    @slayer7826 6 лет назад +1

    Thanks Ron. This was a great video and it helped me understand better the info that I have read in books and seen other people post online. I look forward to seeing more of your videos.

  • @tarumph
    @tarumph 7 лет назад +2

    Hi Ron. I liked your video and the measurements you used are a very good approximation of the actual figures for these spiral easements. In addition to the AREMA site, the 2011 issue of Model Railroad Planning included a good overview of this subject. One this that will help getting the curve laid out is that is passes through the midpoint of the line segment between the tangent line and the circular arc at the point where you measure the offset. I'm a mechanical engineer, so I have the formulas programmed into the RPN calculator on my I-Phone. I can't help it, it's an occupational hazard. :)

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Hi, Tim. I like having the confirmation from an expert that this process is a reasonable approximation of the prototype. Thanks for that. I am no engineer, but I was a pretty good student in algebra and geometry, so this stuff is fun and fascinates me. I have that issue of MRP around somewhere, but had forgotten about that article. Thanks for mentioning it here for others to check out.

  • @KnightGEA4539
    @KnightGEA4539 5 лет назад +1

    This is good VDO for made your layout look like the real track, this is easy way to made spiral curve and very clear.

  • @johnramirez5996
    @johnramirez5996 Год назад

    Great video. Just started building a n scale layout with 2 separate tracks. Am isolating certain sections so i can move cars from 1 track to another. On first try didn't have caulk. So just to try to move forward i used spray adhesive. Luckily i didn't go far. For the first 2 pieces i sprayed started to melt foam board. They were small pieces so wasn't a problem making new ones. Haven't laid track yet. Just set few sections just to see how it would line up. Fit great. Glad i saw this video so i can make proper transitions and banks. Thanks for the help.

  • @titustracy3342
    @titustracy3342 2 года назад +1

    With this be the same way to do if you have an existing track and you want to add another track to it like add it to the existing track if that’s the case thank you for your showing me this because that’s what I wanted to do with my layout

  • @jeffreymcconnell6794
    @jeffreymcconnell6794 3 года назад

    Ron. This is one the best videos you’ve done. Great information in plain English for those of us who are mathematically challenged! I look forward to putting your information into practice on my new layout. Thanks so much for always sharing your expertise with us. Have a blessed Christmas!

  • @handlaidtracksand3dprinted922
    @handlaidtracksand3dprinted922 3 года назад +1

    Very useful video!
    About to build a small Timesaver shunting layout with some curved sections,
    glad I saw this before I made the track!

  • @hughdidit
    @hughdidit 3 года назад +13

    The technique you’re using to scribe the easement has been used for centuries by ship builders to determine the curves of the hull of their ships and boats. The flexible wood strip that you use to create the line is called a “ batten” Just FYI :)

  • @csnyder29
    @csnyder29 7 лет назад +1

    Ron .. you made this really simple to follow .. thank you. Looking forward to your track laying video as I have trouble getting my track straight.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks for watching, Craig. I will go ahead and tell you now 2 things on your comment. 1) I use an aluminum yardstick as a straight edge to keep my track straight. 2) You may not want to get it perfectly straight, the prototype rarely is. I will cover this when I do that track laying video, though. Thanks for your comment.

  • @jacko9759
    @jacko9759 7 лет назад +1

    RON, looked at the web site you recommended & it looks like several of the chapters looked like they could be a real help in modeling , 3-7 for track an even 8 for structure, looks like I've got a lot more reading to do now, thsnks! Ha ha!

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Yes, I found that website just a few months ago and I have found it extremely helpful. More info than most people probably want to know, but better too much than not enough.

  • @michaelstanco8508
    @michaelstanco8508 6 лет назад +2

    this was very informative for me as a beginner. took me three times to understand it but I am a newbie...very important info thanks

  • @bobhenry87
    @bobhenry87 6 лет назад

    Finally, I now understand the tangent track. Would you please in a future segment, help me with what I should use as a tangent for a vertical curve at the top and bottom of a grade.

  • @jeanmcginlay2363
    @jeanmcginlay2363 9 месяцев назад +1

    Amazing what you can achieve in such a small space!

  • @drafter54
    @drafter54 6 лет назад +2

    Very well done Ron. Understood everything and looking forward to using it on my layout and also looking forward to watching more videos of yours.

  • @riogrande5761
    @riogrande5761 3 года назад

    I've had John Armstrongs Track Planning for Realistic Operation since th1980s. There is a good presentation in that book on laying out easements as well. In his table, for a 30" radius curve, he uses 1/2 inch for the offset and 18 inches is the total easement (9-inches from either side of the offset). I actually use a piece of HO flex track to carefully make the "bent stick" easement and mark a centerline using the flex track. Works well.

  • @christiaanbrown4278
    @christiaanbrown4278 5 лет назад +1

    Great instructions Ron. I did read the note of course. the easement looked like it would have turned out the same with either measurement though, just my observation. I hadn't thought of doing the superelevation on the curves before and after watching how you did it I had a thought. 3M makes thin striping tape for fine detail painting work like 3M Automotive 6405 - Scotch Plastic Tape 471, Blue, 1/4" x 36 yds and I thought that this tape would save you a step of cutting the painters tape lengthwise and working in short strips. the thickness may be different though and would require compensation for that. I hope this will be helpful to you and others. I am trying to start my plan for a layout but I have to get two children out of the house first, but why wait on starting on the planning phase.

    • @RonsTrainsNThings
      @RonsTrainsNThings  5 лет назад

      Hi, Christiaan. Thanks for the tip on the striping tape.

  • @cthompson7660
    @cthompson7660 6 лет назад +1

    Ron, great video. I enjoyed it immensely. On the AREMA publication you mentioned: I went to the site and located it, however they want $200 to $250 for it depending on the format. One may also need to be a member of the AREMA to buy it. I did not check into further after I found out that what they wanted for it was far more than the average model railroader can spend for a reference. But in the end, for what we are doing it's not really necessary. But it would have been nice to reuse how the real railroads are built. Thanks again for the great video.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      Interesting. I see that my link is broken. I'm pretty sure there used to be a copy one could see for free there. That is a little crazy. Thanks for bringing it to my attention.

  • @adrianniemiec8669
    @adrianniemiec8669 5 лет назад +1

    Ron , thank you for all your help and effort you put into everything !!!

  • @gearman4111
    @gearman4111 6 лет назад

    I'm watching the video well. Keep posting great RUclips videos. I always cheer for your videos.

  • @philmorton4590
    @philmorton4590 6 лет назад +1

    Thanks for the tip on incremental curvature adjustments. Good tool advice and examples for such

  • @deandanielson8074
    @deandanielson8074 6 лет назад

    Ron, I will be using your techniques for both easement and superelevation on my N Scale layout. Thanks so much!

  • @johnharvey5620
    @johnharvey5620 3 года назад +1

    Thanks for this! I really needed this level of detail.

  • @geoffreygibson2857
    @geoffreygibson2857 5 лет назад +1

    Thanks for your time , I very much appreciate,
    There is a lot videos I mean I can't understand
    When you watch a video
    If you are a beginner you'v lost heart because to complicated to understand heartbreaking because you lost interest ,
    can't understand it,
    I appreciate what you do
    You make it to make it simpler to understand ,
    Sorry for keep repeating
    Simpler,
    I should 4 beginners
    In trains,
    They understand what you
    Were doing,
    A lot of videos they could
    Not understand to complicated for a beginner,
    To be honest we never did this before,
    We can only do it,
    If it is made simpler to
    Understand,
    I am dyslexic , I apologise in advance if you can't understand some of my
    Writing, sell check is god
    Send.
    Thank you for the videos
    Thanks Geoff

    • @RonsTrainsNThings
      @RonsTrainsNThings  5 лет назад +1

      Thanks, Geoffery, for your comment. I am also dyslexic and dysgraphic, so I completely understand. Thanks for watching.

  • @tomhannah3825
    @tomhannah3825 6 лет назад

    A good thorough explanation! Maybe it's cuz I'm an artist who has studied curved lines, but I got the gist of things right away, and spent the next 10 minutes waiting for you to catch up, and actually show me your new curve. I was falling asleep. You took too long.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      +Tom Hannah Ok, but some people need a detailed explanation. Thanks fpr watching.

  • @lewismiller5230
    @lewismiller5230 2 года назад +1

    Hi Ron, I love your videos! I also wish you sold them on DVD's. Lewis

  • @pieseasmyseas
    @pieseasmyseas 6 лет назад +1

    Ron I wish I would have watched this video a week and a half ago as far as superelevation goes I think I got super duper elevation it's kind of like a roller coaster I'm not home right now but I am dying to get home and put my scale ruler beside it I think I over shot the three quarter minimum 6 in maximum I might be in the 3 foot range but I like it and I really do expect to run some high speed trains if you know me I love seeing cargo doing a hundred and ten thanks for the video and hopefully I'll have this next section of track up by Sunday for a test run it's been almost 2 weeks now since my last video I feel a little overdue to my fans hahahaha little self-centered there take care Ron

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад +1

      3 feet? Is that an exaggeration? Because I don't know how you would keep things on that track. But more elevation would be in order on higher speed lines. I look forward to those new videos. 👍

    • @pieseasmyseas
      @pieseasmyseas 6 лет назад

      I made a video of it last night I'm doing the editing now I should have it up within a couple of hours but it ended up being almost two foot of difference in height from one side to the other but it will be getting cut down but it will be some superelevation over 6 in to make up for the speed

  • @jacko9759
    @jacko9759 7 лет назад +1

    Thanks Ron, great explanation on curves & elavations, thought I would try easement curves on my new layout this time and I have been using super elavations my last few layouts but sanded the cork, which is a little messy (truth: really MESSY), but thanks on the explanation as I really didn't think of it for that reason, thanks again keep the videos coming I really enjoy them!

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks Jack. Yes, sanding the cork will certainly work, but I find it easier (and less messy as you say) to add elevation than to subtract. Thanks for watching.

  • @tonyhill6296
    @tonyhill6296 4 года назад

    Hi Ron, Not withstanding the error correction note at the start (Hey we can all make a mistake!) this is a video I’ve been wanting to see. Thanks for sharing. Just my thoughts to add to the ‘mix’ - How about making templates for easements, to save setting out time during a new development/ extension? Here is what I did, following your guidance.
    Using AnyRail 6 I marked out the radius curve for R4 (Peco). Then marked the offset based on R4 and drew the spiral curve.
    Next I calculated the length of the overall transition and marked the start and endpoints as per your video.
    At each marked point on the respective curves I cut the track. I then inserted a piece of flex track, connecting each end and then used the ‘smooth flex’ tool to draw the transition.
    Finally I turned on the roadbed and printed this completed transition. When cutout and fixed to card it enable the route for my underlay to be. defined. Bonus is that on turning the template over you have a mirror image for the other end of the curve, if needed..
    Best Regards, T🚂

  • @danielpaulson786
    @danielpaulson786 Год назад

    Thanks for the tips my friend,I am building a race track railroad and it keeps derailing on my elevated turns because I was having issues banking the turn evenly so I'm going to try some gorilla tape. Thank you.

  • @lifenscale5469
    @lifenscale5469 3 года назад

    Thanks, Ron, for the tutorial! I had just purchased some flex track for a new layout build and I had no idea how to get the curves correct. Will be putting these tips in my toolbox!

  • @j8u2
    @j8u2 4 года назад +1

    I've use a piece of code 100 rail when laying out a spiral on homasote. It ahchored well on one end and was easily spiked allowing for tracing the centerline.

  • @rodolfomartinez2269
    @rodolfomartinez2269 2 года назад

    Thank you, Ron. Now I know why I suffer a lot of derailments in my layout.

  • @flavxer7345
    @flavxer7345 4 года назад +1

    Ahhh.ok. I thought the easement seemed a bit long. I'm glad you posted the clarification.

  • @skipwithbaptistchurchcanta5102
    @skipwithbaptistchurchcanta5102 3 года назад

    Thanks for the great tips Ron on tracking laying and easments

  • @kevinheard8364
    @kevinheard8364 3 года назад +1

    This is a great video.... straight up. A super job.... Thank you.

  • @dougmckay9524
    @dougmckay9524 7 лет назад +1

    Hi Ron do like the steam on the carves this will help out on my layout we have started on fast 2 of the CPDM railway ,keep up the great work on the videos.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks you and thanks so much for watching.

    • @dexterdog62
      @dexterdog62 7 лет назад

      Ron's Trains N Things b

    • @ejejeff1722
      @ejejeff1722 6 лет назад

      A bit late for a question, but, how would you do the radius if the pivot point is off the layout and can't physically extend it? Such as up against a wall. I thinking of making a template, which I could flip over, not sure I could make it accurately, tho.

  • @Phantomthecat
    @Phantomthecat 5 лет назад +1

    Great video thanks. I’m about to start laying track on a new layout - will be using your tips here, this will make a huge difference. 👍

  • @Gopherdave1
    @Gopherdave1 7 лет назад +1

    You sure do good video, hard to believe your new to this! Great info!

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks, Dave. (I assume you are Dave from your channel name. lol). I have done just a little amateur video before, and I have a daughter who is a senior in college majoring in theater whose advice is pretty helpful as well.

  • @MainTrack
    @MainTrack Год назад +1

    Excellent tips, Ron!

    • @RonsTrainsNThings
      @RonsTrainsNThings  Год назад

      Thanks, Mike. I tried to reach you a while back via a comment on your channel. If you get a chance, drop me an email at ronstrainsnthings@gmail.com

  • @jerrysmith410
    @jerrysmith410 7 лет назад +3

    Lack of mass in our car models does mean super elevation can make cars a little more likely to tip over. So it is important not to over do the elevation. Hence, NTrak recommends avoiding super elevation on modules where the extra long trains may increase the possibility of derailments.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      +Jerry Smith That is a good point, especially if one overdoes the superelevation.

    • @tarumph
      @tarumph 7 лет назад +2

      Helices can sometimes have problems with string-lining, or having the cars pull off of the inside of the curve. The combination of tight radii and high forces, due to the grade, can do this. In this case, sub-elevation can help. This is raising the inside rail. It doesn't look like anything the prototype does, so I would suggest only doing it in hidden trackage.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад +1

      +Tim Rumph This is good advice. No, I don't superelevate the curves in my helix.

  • @rickeyallinen798
    @rickeyallinen798 7 лет назад +1

    Great track tip. Found it interesting and informative.

  • @SMTMainline
    @SMTMainline 6 лет назад +1

    Interesting ideas, I like the pivoting screw idea

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      Thanks. It works really well and produces pretty sweet results.

  • @CRStoller
    @CRStoller 6 лет назад +1

    Awesome video Ron. Very informative

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад +1

      Thank you for your comment and thanks for watching. I'm glad you found it helpful.

  • @michaeldenoncourt1526
    @michaeldenoncourt1526 4 года назад +1

    I'm now track planning my 2nd layout one of whose goals is to correct track related issues incl

    • @RonsTrainsNThings
      @RonsTrainsNThings  4 года назад

      Well good luck as you do. Great trackwork is the secret to a well running and thus satisfying layout.

  • @MrGeeMan1980
    @MrGeeMan1980 3 года назад +1

    Nice. Just what I needed to see.

  • @Mercatoyd
    @Mercatoyd 7 лет назад +1

    Ron, this was an excellent video with purpose and reason.. Tom

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks, Tom. Did you catch the correction video?

    • @Mercatoyd
      @Mercatoyd 7 лет назад +1

      yes, I did...and it clearly presented the correction.. Thank you for asking. Tom

  • @RonsTrainsNThings
    @RonsTrainsNThings  7 лет назад

    I know this video got a little long. I hope it isn't too heavy with explanation. I thought some of my subscribers would appreciate to "why" of easements and superelevation. Again, if that interests you, check out that link to the manual on track engineering in the description for even more.
    Do you use easements and superelevation on your layout already? Let men know if you do and how you do it below.

    • @MMRails
      @MMRails 7 лет назад

      Ron's Trains N Things I didn't find it long at all. Flew by. Lots of good information with no fodder. -Mark

    • @terrylefevre5604
      @terrylefevre5604 7 лет назад +1

      The "LINK" doesn't work..shows ERROR each time I tried

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      +Terry Lefevre do you mean the link to the supplemental correction video clip?

    • @terrylefevre5604
      @terrylefevre5604 7 лет назад

      YES..I keep getting "Server Error"

  • @lionellance
    @lionellance 7 лет назад +1

    Wow... Great job..thanks for sharing and keep up the great work...Lance I may just try that when I'm laying track

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      +CHESAPEAKE & OHIO JUNCTION Thanks for watching. I think you will like the results.

  • @giulius7176
    @giulius7176 7 лет назад

    Hey Ron...Great How to...While I knew about easements on turns, I was not sure how to determine the length...thanks for clearing that up and demonstrating it. It really makes a difference when you see it...And yes I saw your correction...Thanks for sharing!!!

  • @nhyardlimit
    @nhyardlimit 4 года назад +1

    Lots of good info. TY Ron

  • @ralphgreenwood5857
    @ralphgreenwood5857 7 лет назад +1

    Ron, great how to there! On the YTMB, I'll just call you RT from now on-so many Rons-lol..Best time would be 8pm to 10pm weekdays.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      LOL, yes, sooooo many Rons. Thanks for your input, it is noted.

  • @nssherwoodsub
    @nssherwoodsub 7 лет назад +1

    Thanks for the Sharpie tip. I’ve referenced this tip in a recent video with appropriate attribution of course…Harold

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      +Norfolk Southern Sherwood Subdivision That was a lesson learned the hard way. I will never forget the sight of bright red ballast around my switches. Never want to go there again.

    • @nssherwoodsub
      @nssherwoodsub 7 лет назад +1

      I added a card linking to your site as part of attributing this tip to you. Hope you get some views from that...Harold

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      +Norfolk Southern Sherwood Subdivision Thanks!

  • @Gavs_rc_hobbies
    @Gavs_rc_hobbies 7 лет назад +2

    Great explanation. I wish i had known about this when building my layout.

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Sorry, I should have done this sooner. LOL. Thanks for watching.

  • @NFK2Killer
    @NFK2Killer 6 лет назад +1

    Thanks for this, am building a layout and will include this. Wish you would have shown an end result tho.

  • @BRENTG8581
    @BRENTG8581 5 лет назад

    Outstanding explanation GREAT JOB RON, easements are imperative especially when running large equipment let alone average rolling stock. Question to you, my bench work has shifted over the years. When I built it i did not do anything on it for one year to let it settle. However I am having leveling problems for track laying even after adjusting my bench work and adding more cross braces. My question to you is what would you do to make your track work level at grade?

  • @MrLeejan
    @MrLeejan 3 года назад +1

    N Trak has a very good article on this in there How To book.

  • @thegrowler-blackwoodngauge
    @thegrowler-blackwoodngauge 4 года назад

    Very informative Ron. Cheers Euan

  • @gymsreviews8155
    @gymsreviews8155 4 года назад +1

    That's alot, I did that and it turned out wonderful. 👍

  • @sminute2282
    @sminute2282 7 лет назад +2

    Thanks Ron. Excellent video. I'm still planning my first layout. Question for you - if you were using sectional track could you substitute a larger radius just before the straight section to soften the curve? I know it's not quite the same, but wondered if it was worthwhile?

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Yes, that has been done. It doesn't do quite the same as flextrack, but it certainly gives you a smoother transition. The key thing would be to lay out your sectional track and get it the way you want it before laying your roadbed so it would all fit just right. I have a couple other tips about sectional track that I could offer too. Maybe I will make a video about using sectional track soon.

    • @sminute2282
      @sminute2282 7 лет назад

      I would certainly appreciate your thoughts and suggestions on sectional track. I'm considering Kato track on a door-size layout with expansion capability.

  • @jennavalefarmandobservator5776
    @jennavalefarmandobservator5776 4 года назад +1

    Thank you, A wonderful video, I learnt a bunch.

  • @douglasbishop3252
    @douglasbishop3252 5 месяцев назад

    I have a question for you. You were doing engage when you're talking about how much to elevate the track. I am setting up an entire Ho gage Layout and was wondering how much should I elevate the track on a 20 inch radius.. I find your videos very informative and looking forward to learning more

  • @heizung4me
    @heizung4me 6 лет назад +1

    Instead of cutting masking-tape to size, you can use 1/4" trim-tape (don´t know the exakt english word for it). It´s made for decorative lines on cars etc.

    • @ed_halley
      @ed_halley 6 лет назад

      You're referring to pin-stripe tape. This is narrow enough across, but it's usually thicker than the painter's tape Ron shows. Another choice is Tamiya modeling tape, which is paper-thin but also in various narrow widths. Maybe expensive outside of Japan, but I agree it's good to consider alternatives.

  • @geoffreymoehlman8340
    @geoffreymoehlman8340 5 лет назад +1

    One thing I noticed you forgot to mention on the video was about gradually decreasing the elevation after the apex of the corner so its not a sudden drop in rail height. basically reversing what you did to go into the curve.

    • @RonsTrainsNThings
      @RonsTrainsNThings  5 лет назад

      True, I did not mention that. I assumed people would realize you need to do the same thing to the other end of the curve. But we all know what we get for assuming. Thanks.

  • @lorenzobeckmann3736
    @lorenzobeckmann3736 3 года назад

    I'm planning this at this time; I want to stay with track which will either be all the same or track which will easily connect with the flex track necessary for the easement section.

  • @MRR_Shadowolf
    @MRR_Shadowolf 7 лет назад +1

    Well done video! Learned a lot from your presentation!

    • @RonsTrainsNThings
      @RonsTrainsNThings  7 лет назад

      Thanks for saying so and for watching.

    • @MRR_Shadowolf
      @MRR_Shadowolf Год назад

      @@RonsTrainsNThings Have watched this a few times and took a lot of notes, one question - how far do you take the superelevation (ie painters tape) all the way around to where it straightens out again and just reverse to get it back to straight or ? Thanks!

  • @bobriddle6068
    @bobriddle6068 4 года назад +1

    Thank you Ron, well done

  • @kevkfz5226
    @kevkfz5226 4 года назад

    Don’t know about the US but in the UK where old roads are spiral curves it’s been sited as a major cause of road accidents as the driver/rider gets caught out by the tightening bend.

  • @michaelstanco8508
    @michaelstanco8508 6 лет назад +1

    thank you I plan on using this info on my first layout. or I might just use the new maglev trains that don't require track(wise guy)

  • @Goldchucker1
    @Goldchucker1 2 года назад +1

    Hi Ron.
    You explained how to form a easement going into a curve from a straight section of track assuming the train was moving in the direction of the easement. I assume, if you plan to run a train the opposite direction, you would place an easement where the curve meets the straight track on the opposite end for trains coming from the opposite direction. Am I correct in my thinking?

  • @michaelklingler3956
    @michaelklingler3956 6 лет назад +1

    I am using your formulas to do my easements and find it very helpful! Can you tell me where you got your flexible wood? I'm having trouble finding it.

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад

      Mine was just a 1/8" scrap I had ripped off a 1x4 for something.

  • @sounddude177
    @sounddude177 6 лет назад +1

    Wow some great advice I will take for a layout I have in the planning stages. Question: would it work to put the tape strips under the road bed rather than the track? Just to keep it more out of sight?

    • @RonsTrainsNThings
      @RonsTrainsNThings  6 лет назад +1

      I think you will want the roadbed solidly adhered. With track you have ballast to help hold it down, and once painted and ballasted you will never aee the tape.

  • @billgoodwin8262
    @billgoodwin8262 5 лет назад

    Hi Ron, Just out of curiosity I tried to find AREMA.ORG thru my search engine - Bing - and it worked for me
    on this date - Jun 17, 2019. However, it took a long time for it to load. Once it loaded I did not go beyond the
    home page as I wanted to get back to your video to post this comment for you. Thanks for the info as it will
    be a great help for me and my HO layout. GOOD STUFF !!
    Bill G.