HARSLE Hydraulic Guillotine Shear Tutorial - E21S

Поделиться
HTML-код
  • Опубликовано: 1 окт 2023
  • #harsle #guillotineshear #tutorial
    Guillotine Shearing Operation Tutorial
    Applicable for E21S
    Part 1
    Fill The Oil and Cable Connections
    Filling the oil tank with anti-wear hydraulic oil.
    Fill the oil from this port.
    Connect to a 3-phase power source.
    Switch on the power source.
    Turn On the Machine Power Switch
    Connect the pedal switch to the machine.
    Turn on the power switch.
    Release the emergency stop button and start the oil pump
    Check the main motor’s rotating direction.
    If it rotates clockwise, then it is correct.
    If it is rotating anti-clockwise.
    Press the emergency stop.
    Exchange the two wires connection.
    Part 2
    Machine Start-up
    Turn on the machine power switch.
    Turn on the power control key
    Release the emergency stop switch
    Start the oil pump.
    Waiting For the System Loading
    Part 3
    System Operation
    In Single mode
    X: Current position of X axis, unable to be modified.
    A: Current position of A axis, unable to be modified.
    G: Current position of G axis, unable to be modified.
    XP: Program position of X axle.
    DX: Retract distance of X axle;
    CUT: a delay time for the cutter to go to the next work step after it leaves the top dead center.
    DLY: In case of a single step, delay time for X axle concession.
    F: Functions configure output.
    PP: Number of preset work pieces.
    CP: Number of current work pieces.
    Move the cursor to the XP value
    Input 100 and confirm
    Click the Run button
    Manual movement
    On single step parameter setup page
    X: Current position of X axis
    A: Current position of A axis
    G: Current position of G axis
    Click, and enter the manual page
    Click, operate at low speed in increasing or decreasing directions.
    In continuous mode
    Click, select or input the program serial number and click
    Input the Program step, and click
    Click,to enter the first step setup page
    Select XP, input 150 and confirm.
    Click, to enter the second step setup page
    Select XP, input 100 and confirm
    Click, to enter the third step setup page
    Select XP, input 120, and confirm.
    Click the Run button
    Part 4
    Cutting
    In Single mode
    Placing the metal sheet.
    The sheet will touch the stop fingers.
    Step the pedal switch and cutting
    Part 5
    Measurement
    Measurement of raw sheet length 455
    Measure the sheet after cutting 355
    Part 6
    Maintenance
    The blade holder of the guillotine shear no longer cuts the plate nor can it move up, and there is no response when stepping on the foot switch.
    Open the ball valve and observe the pressure gauge of the accumulator
    Another employee needs to press and hold the refilling button
    After observing the accumulator pressure gauge rise to about 10
    Close the ball valve and stop pressing the fill button at the same time
    At this point, the blade holder should have been successfully lifted
    The guillotine shear returns to normal operation
    Part 7
    Switch Off
    Press the red Stop button
    Press the emergency stop buttons.
    Turn off the power switch.
    Contact Us
    www.harsle.com
    Email: info@harsle.com
    WhatsApp: +86 18052080815
  • НаукаНаука

Комментарии •