INSIDE THE ANFIELD ROAD STAND - 2.8.23 - LEVEL 2!! SEE HOW IT LOOKS INSIDE NOW!!

Поделиться
HTML-код
  • Опубликовано: 27 ноя 2024

Комментарии • 134

  • @RS-xx9ve
    @RS-xx9ve Год назад +29

    The Main stand looks absolutely gigantic at the end. Its actually got more rows than places like the Bernebeu. Only 3 rows less than the highest row at Wembley. The ARE is also impressive, hopefully one of numerous pieces in the jigsaw of Anfield's modernisation and expansion. The other 2 stands are in fairness looking due for redevelopment.

    • @kendorsed
      @kendorsed Год назад +3

      Yes exactly. I love stadium re-builds. I think Kenny Dalglish stand needs demolishing and the Kop. Getting around height restrictions is another matter, especially the Kop. I'm blue BTW but love seeing Anfield growing, as a stadium fan.

    • @georgedavies3907
      @georgedavies3907 Год назад +1

      👍🏼 This is so much better than having to build a new stadium, the costs that would entail and get to keep the atmosphere rather than start over. Just want to press fast forward and see it complete!

    • @jsimmo7041
      @jsimmo7041 Год назад +1

      ​@@kendorsednice to hear a refreshing opinion from a blue. I'm also fascinated by how they build the stadiums. Recently watched a 40 min vid on how they built the Emirates in a confined space cos of its footprint

  • @marksmith1944
    @marksmith1944 Год назад +7

    Thanks for the footage Nick, nice one 👍👌🏻🌟 Buckingham you need to Buck Up your ideas that place looks a tip. I know it doesn’t need to be spotless, but the place needs to be tidy. in the stand it self, you have barriers lying down on their side, not even protecting anything. Don’t forget Buckingham your reputation is on show. Anyway, enough of that, just make sure that you’re ready for the opening game against Bournemouth at least.

  • @stumac2669
    @stumac2669 Год назад +11

    Good stuff Mr Drone, another good video. I 100% agree that there still looks an awful lot to complete to even be ready for mid October. The club would've known months ago how far this product is behind schedule.

  • @mikehargreaves6167
    @mikehargreaves6167 Год назад +12

    Great video and yes progress at last, however, shame on the contractors to have not made better progress. The club absolutely would have known or been told and typical of our club have communicated badly and not wanted to upset the yank owners. It's going to be one hell of a snag list for them in October I imagine.
    Thanks for getting that put live for us to watch. Have a great break, and don't take your drone on holiday!!!!

    • @9ofdiamonds350
      @9ofdiamonds350 Год назад +2

      As a retired painter this made me laugh. They better hope they don't get a fussy clerk of works with a mirror on a stick.

  • @derekgahan2676
    @derekgahan2676 Год назад +6

    Great video as alway Nick. Enjoy your well deserved holiday. Do not put the drone in your suitcase. Enjoy ✈️🏖️⛱️🌞

  • @OfficialJGorman
    @OfficialJGorman Год назад +25

    Loads of progress made on the underside of the roof and seating. People commenting on mess… on an active building site… They’ll moan about anything!

    • @paulgrayson8799
      @paulgrayson8799 Год назад +7

      Correct mate, almost all of the people on here don’t know what there looking at. A mess can be cleaned up in a matter of days. How much actual commissioning work left to do I can’t tell. 👍

    • @jsimmo7041
      @jsimmo7041 Год назад

      The general public don't need much to moan about

  • @paulcritchley464
    @paulcritchley464 Год назад +1

    The finishing work is always the toughest. There is always that thing to do, just one more job to finish
    I know, been in the building industry for over 50 years, just one more job to finish
    I put my earmuffs on make a list and go through the list
    Cheers have a great day

  • @robertmorley3609
    @robertmorley3609 Год назад +4

    How can LFC talk about opening the upper tier in stages? It needs to be finished completely, tested and certified. Good to see the inside, mind.

  • @dee7781
    @dee7781 Год назад

    Brilliant video of the interior thanks alot to you and your contact.

  • @iandrew6347
    @iandrew6347 Год назад +1

    There has been progress but as someone who has worked on big projects like that and with the first home game coming up very soon there is still a very lot to do the biggest part of the job will be a testing the systems and making sure that everything works properly when that stands fully open specially when you have supporters wanting to use bathrooms bars . I hope that it gets done

  • @keithneil4464
    @keithneil4464 Год назад +1

    The Godfather of Drome does it again. Excellent video. Good insight from that footage.

  • @georgedavis-stewart4225
    @georgedavis-stewart4225 Год назад

    Thanks, Mr. D., for sharing your contact's footage. It shows that a great deal has been done, but it still looks like the finish is a long way off. Busy, busy, busy.

  • @geoffhancox846
    @geoffhancox846 Год назад +2

    Have a good holiday see your video want you get back Geoff

  • @garethparry6673
    @garethparry6673 Год назад

    Great video, I love the internal half brick walls, when the big screens are on them too!👌👌👌👌

  • @AllanWeaver-m4x
    @AllanWeaver-m4x Год назад +1

    Thanks for the video I think you be lucky to be in for Christmas 🎅

  • @harbottle8580
    @harbottle8580 Год назад +7

    Is level 2 the 1st floor? If so, i can't see it being open 'in stages', before January. Hopefully level 2 is the 2nd floor, and level 1 is close to completion. If so, we need a video of that. Otherwise, this looks like one of those dodgy builder tv programmes. The ones where they turn up when they feel like, and work at a snails pace because the wage is high. Steel burners where on £65 an hour.

  • @deathsndealspops3757
    @deathsndealspops3757 Год назад +1

    Good stuff mr drone another boss video keep up the good work can wait for next one 👍👍

  • @ericthekop9624
    @ericthekop9624 Год назад +4

    I like it.

  • @paulanthony2024
    @paulanthony2024 Год назад

    Wow...was never ever going to be finished in time by the looks of it 👀

  • @aalan4296
    @aalan4296 Год назад +1

    I've really enjoyed you video's and Anfield is turning into an incredible stadium. I find it interesting that the supporting roof trusses in the new stand are incorporated into the roof whereas in the older stands they are above the roof line as is common in many stands across the country. I wonder if this will spark a new trend?

  • @philbeattie1623
    @philbeattie1623 Год назад

    Excellent Nick thanks 💪😉

  • @philreeves7520
    @philreeves7520 Год назад +2

    There's no way on Earth that this will be ready for October. I reckon it's gonna be Christmas now.

  • @danmegoutdoors8709
    @danmegoutdoors8709 Год назад

    wicked view from the new top bit

  • @stephenmillington214
    @stephenmillington214 Год назад

    Hi Nick
    Totally agree still a lot of work to be done before completion,
    The Project Manager, Contractor and the Employer (LFC) would be holding progress meetings on regular basis and would have known as soon as any part of the project is going to be delayed. The issue with delays in building is who is going to pay for them, its not always the Contractors fault
    A guess as with all bad news its a case of when do we tell the public, they we're never going to brush this under the carpet so the Employer LFC should of made a statement sooner.
    Have go holiday

  • @CraigTheBrute-yf7no
    @CraigTheBrute-yf7no Год назад +6

    Don't forget guys, this was supposed to be ready next week! 😂

    • @coolcat1022
      @coolcat1022 Год назад

      No, it was meant to be ready for Bournemouth on the 19th which is two weeks this saturday

    • @CraigTheBrute-yf7no
      @CraigTheBrute-yf7no Год назад

      @@coolcat1022 no it was meant to be ready for a test event before then

  • @suffolkpompey
    @suffolkpompey Год назад +2

    And to think that this was meant to be all ready for mid August, is there any part of this build that the contractors can say is finished. BTW Mr D, i don't know what your idea of "loads of workers" is, but I reckon there was no more than a dozen.

  • @keithdouglas7154
    @keithdouglas7154 Год назад +6

    Great video, but the number of workers on site is not enough for the amount of work that needs to be done .
    I would be worried about Buckingham, the builders they already had the roof builders go into administration a few months ago. I feel Buckingham may be covering over cracks in their financial issues. I like to hear from people who have worked on sites like this. Would builders reduce numbers if on a time sensitive project with penalties.?

    • @charles5553
      @charles5553 Год назад +1

      Carillion who did the Main Stand had financial difficulties and was liquidated 2 years after doing the main stand so Buckingham could follow the same suit if the board of Buckingham doesnt get their arses into gear 😬😬

    • @keithdouglas7154
      @keithdouglas7154 Год назад

      @charles5553 Thanks for that information. I knew something like this had happened before, but I couldn't remember the company name, and if it was Liverpool FC, it happened to.
      I see it happening again, big time.
      I hear Buckingham is meant to do Wrexham new Kop build, which was
      meant to start in June.

    • @lorraineraftery3525
      @lorraineraftery3525 Год назад

      Thank you to the fella who covered the inside. Understandably, it's a mess it's a working area, clear walking areas, and it could have been end of shift why not much going on. But happy to see inside nearly, catch the hanging down piece, and have to freeze it to view it better lol xx

  • @U54321bd
    @U54321bd Год назад

    LFC TILL I DIE YNWA gret Vlogs lad enjoy ur holiday lad✈😎👍

  • @MontysKillerRabbit
    @MontysKillerRabbit Год назад +3

    October?!
    I'll have a few quid on that mate, we're in August, that work ain't finished until chrimbo.

  • @mertman182
    @mertman182 Год назад +7

    I cant believe how many engineers and construction workers are in the comments. There is 2 months until the new deadline, every match missed will cost Buckingham somewhere between half a million and 1 million pounds in fines. They will get it finished.

  • @bishwasghale4865
    @bishwasghale4865 Год назад +7

    What a mess mate.. I know it is easier said than done but we are way way off before its fully completed.. Not just weeks but we r off by months. Any ways cheers for the footage mate quality as always from you.

  • @adamturner8217
    @adamturner8217 Год назад

    I’m saying November December when this is ready after seeing that video

  • @philipkempbell7174
    @philipkempbell7174 Год назад

    This will be ready in the New Year.

  • @alistairsmith5389
    @alistairsmith5389 Год назад +4

    My word that’s miles behind! That won’t be ready until December maybe even into 2024! 😮

  • @mikekavanagh2771
    @mikekavanagh2771 Год назад +1

    Ready for Christmas at best

  • @DJYunkHank
    @DJYunkHank Год назад +1

    Did the tour today and got footage of them starting to paint the pitch lines .let me know if you want it mate

  • @salvatorediprima943
    @salvatorediprima943 Год назад

    Great job getting footage of inside nick,they are months and months away from finishing interiors in. My opinion

  • @ivanbasso9313
    @ivanbasso9313 Год назад +6

    Can‘t wait to be on this new Stand on Dec. 29th against Newcastle ❤ Thanks for your Daily content 🫶

  • @chewy5563
    @chewy5563 Год назад

    They will want it open for the Everton game on October 21st. Won't be done for the 24th September vs West Ham. Lucky they got a month in between games

  • @de_wann
    @de_wann Год назад

    Ready on October?😅 previously we only judge the complete date based on outside build, as the daily update are more on outside job. But the inside, still need more time to complete.

  • @essexginge9167
    @essexginge9167 Год назад

    looks like it should be finished just in time for Christmas

  • @night96king60
    @night96king60 Год назад +1

    Poland 🇵🇱 Pozdrawiam

  • @secla_SC
    @secla_SC Год назад +3

    Glad to see I’m not the only one disappointed in Buckingham for their slow progress. Also the inside of the stand could do with some tidying. Lots of equipment not being used and taking up a lot of space.

    • @1701_FyldeFlyer
      @1701_FyldeFlyer Год назад +3

      Slow progress? They've built this since Sept 2021 despite all the home games played since then. The stand will have a reduced capacity for 1 or 2 games but the builder has been 'slow.' Maybe some of you people should get jobs in the building industry with your expert knowledge?

    • @buzz5020
      @buzz5020 Год назад

      “Disappointed with the slow progress”
      “They should also spend more time tidying up inside”
      How many job sites have you worked on?

  • @philmoreton9623
    @philmoreton9623 Год назад +1

    Can’t see that being ready in October.. not sure what time this video was taken but the lack of activity is beyond belief.. assume that there must be penalty clauses in place.

  • @henryb160
    @henryb160 Год назад +3

    What's the hold up? Has B&Q run out of tin plate and self-tapping screws?

  • @mrsinghsstereos6662
    @mrsinghsstereos6662 Год назад

    Thanks for sharing . It’s a shame the guy didn’t walk up to the top row to show the view of the pitch from the back of the stand .

  • @barrypegg3070
    @barrypegg3070 Год назад

    When watching this video remember that the Level 2 concourse will serve home fans sitting on upper tier, so would imaging the most resources will be working on ground floor concourse which will be needed for the first match. Then the Level 1 concourse which will accommodate away supporters plus hospitality suites, will be the next priority. This level is going to be the last thing they will be looking to have completed.

  • @alainbruiners2445
    @alainbruiners2445 Год назад

    Yeah still a lot more to do, I think it will take a few weeks maybe another month before everything is finish, but in this video, there is definitely more activity happening in there, YNWA👍🏼

  • @РенатСадретдинов-н8е

    I think it is WAY behind the schedule!!!

  • @vickers2007
    @vickers2007 Год назад

    They’re not going to be able to get the pitch side internal cladding done until the end of the season. Will equipment on the pitch to reach that

  • @minijms1
    @minijms1 Год назад +1

    Never in a month of Sundays will this be finished in the next three months!

  • @vickers2007
    @vickers2007 Год назад +2

    1.21, seen the state of the breeze blocks on them corners, no care taken on this site. Whatever they’ve been hitting against it will look even worse

  • @AnthonyQuigley-q6i
    @AnthonyQuigley-q6i Год назад +1

    Great video but definitely a lot more work to do

  • @andrewgowing9815
    @andrewgowing9815 Год назад +12

    It wasn't exactly swarming with people, all eagerly working to get the job finished, was it?...
    What a mess.

  • @jasonjonston948
    @jasonjonston948 Год назад +1

    I really hope the lads face which got caught in the walk around doesn’t get him loads of grief ……I can see bosses pressuring him for a name I’ll bet that’s their style

    • @misterdroneuk
      @misterdroneuk  Год назад +1

      He won’t know a name, imagine how many people he walks past on that build every day

  • @johnprosser5035
    @johnprosser5035 Год назад +2

    Individual sinks...... That will be a nightmare to clean.... Would've been better with those trough type sinks... Thought it would've progressed more than it has. Still tons to do. Not keen on that gap in the roof lining which looks like lights and maybe speakers (not the floodlight ones)

    • @mrsinghsstereos6662
      @mrsinghsstereos6662 Год назад

      Also looks like they aren’t installing dyson hand dryers even though they are meant to be cheaper and better for the environment ( not good for FSG’s ESG score !)

  • @hassymiia6267
    @hassymiia6267 Год назад

    Looks like will be finished November. Not October!!

  • @darrenowens4747
    @darrenowens4747 Год назад +1

    Better make it season 24/25 for the opening place is a mess

  • @jacknewnham6574
    @jacknewnham6574 Год назад

    What is the expected date for completion ?

  • @UpTheRedsTV
    @UpTheRedsTV Год назад

    Great video Nick if I'm honest l'll be surprised if the council give Buckingham or for that matter LFC a safety certificate for the lower tier there seems shed loads to do. Andy.

    • @scouserleigh
      @scouserleigh Год назад +1

      This looks like the concourse or hospitality for the upper tier so this won’t be needed for a lower tier only opening.

  • @bear765r
    @bear765r Год назад

    Looks like there is no urgency to get the work finished. Workers working so casually 😅😂

  • @grahamm933
    @grahamm933 Год назад +1

    That must be over a week old,if you go to 2.56 you see the cladding on that corner hasn't been installed, it was done last week

    • @keithneil4464
      @keithneil4464 Год назад

      Even if footage was taken last week, do you believe much progress has been made since?
      We're months away from full completion. Id say mid January

  • @sawtoothred7943
    @sawtoothred7943 Год назад

    It’s the perfect metaphor for our transfer window. Not much going per usual. It looks like a dump that won’t be done till the next transfer window ffs. Another thing, I have never seen so many projects started and not completed. Could someone at least get on a broom?

  • @simonpage5870
    @simonpage5870 Год назад +3

    Bramley Moore will be finished before at this rate lol

    • @owenstamper
      @owenstamper Год назад

      They'll be running out of money soon.

  • @AndresSanchez-nk1ld
    @AndresSanchez-nk1ld Год назад

    The expansion is far from being finished, maybe by December it will be finished, I expected the Premier League to start with the open level

  • @johnjonesToffeeman
    @johnjonesToffeeman Год назад

    Looks like Trumpton fire station

  • @RedKop50
    @RedKop50 Год назад

    Looks more like December rather than October before it’s finished 😂

  • @bobcooper3299
    @bobcooper3299 Год назад +2

    Yes it looks a mess yes it will be behind as we’ve been told … but that’s a working site .. once the scaffolding and materials are gone it will soon come together. opening the spaces for paint plumbers and more.

  • @JamesLFC-hk1fq
    @JamesLFC-hk1fq Год назад

    👍

  • @graham148
    @graham148 Год назад

    Jesus looking at that it won't be ready till next season 😂😂

  • @DanielWalker67
    @DanielWalker67 Год назад

    In my opinion it looks as if its nowhere near finished. They definitely don't operate a clean site policy. Nothing seems complete inside. The footage is good to see.

  • @123tinhat123
    @123tinhat123 Год назад

    After seeing that I wouldnt recommend Buckingham for anymore stadium conversions or even a loft conversion.

  • @mohammedshafiq6506
    @mohammedshafiq6506 Год назад +2

    I can’t see any of the stand being open in time for the first home game. At this rate it will be the new year before they finish.

  • @harrogatefan4976
    @harrogatefan4976 Год назад

    How much has the new stand cost ?

  • @DougieNev
    @DougieNev Год назад +1

    Be lucky to have this finished for Christmas 😮👎🏻

  • @JonathanTracey-b8t
    @JonathanTracey-b8t Год назад

    Looks like there is still a couple of months work left

  • @Fozzie68
    @Fozzie68 Год назад

    I wouldn’t say loads !! I spotted a conduit bender set up and person carrying an isolator so I would say , just the Sparky’s working in their !!

  • @pgaa3238
    @pgaa3238 Год назад +1

    Lol.. Hope they are finished before season 24/25 starts 😂😂 what a *@#$$## mess

  • @dale3852
    @dale3852 Год назад

    Oh dear

  • @kristianbonkerud5378
    @kristianbonkerud5378 Год назад

    Maybe too much things in red colours. To fue toilets todoo from behind?

  • @martinduce4987
    @martinduce4987 Год назад +1

    😂 dont even think xmas what a mess

  • @ronneyscott5112
    @ronneyscott5112 Год назад

    So i guess he was sacked or left before he gave this ....😁👍

  • @liamhennelly3961
    @liamhennelly3961 Год назад

    Here's me going lookslike hardly anything has been done lately, and then see this and realise they have been working their asses off inside 👍🏻

  • @Raptor-22
    @Raptor-22 Год назад

    This is miles away from being done.

  • @divadolby4848
    @divadolby4848 Год назад

    the pitch looks small

    • @bobcooper3299
      @bobcooper3299 Год назад

      It is one of the smaller pitches in the premier league.

  • @chrisedwards9003
    @chrisedwards9003 Год назад

    Months behind. 🤷🏻‍♂️☹️

  • @1971_2
    @1971_2 Год назад

    Brickwork is shocking tbh, no way will that be ready October

  • @pmacnz
    @pmacnz Год назад

    This won't open till December. Way too much to do

  • @relax9674
    @relax9674 Год назад

    Someone laughed at me when i said it wont be fully complete by end of september start of October. These british builders are one of the most laziest workers.

  • @shaky..
    @shaky.. Год назад

    Looks like cowboys have been working here and it looks like it's gonna be about two months over the schedule where are the workers never see any works there's always just a few standing about I'm looking for a job where you can just piss about and get paid.

  • @jurgenvoogt1638
    @jurgenvoogt1638 Год назад

    Are they kidding us?😂

    • @1701_FyldeFlyer
      @1701_FyldeFlyer Год назад

      You're on allthese videos moaning constantlybut dont acknowledge they've built this despite all the home games we've played. The stand will have a reduced capacity for 1 or 2 games and all people like you do is moan about the 1 or 2 games, not the 60+ we've played since the build started.

    • @jurgenvoogt1638
      @jurgenvoogt1638 Год назад

      @@1701_FyldeFlyer blablabla you know its true. A disgrace

  • @harrogatefan4976
    @harrogatefan4976 Год назад +3

    The Chinese would have built and finished it in two months

    • @simonlewis720
      @simonlewis720 Год назад +2

      And then a year later it would fall apart

  • @rommel3854
    @rommel3854 Год назад +1

    Unlikely to be fully completed until Xmas

  • @jakehowie442
    @jakehowie442 Год назад

    That building work looks shoddy and a mess just saying…not really the attention to detail Tottenham stadium has.
    Could do with a similar fan experience though

  • @wadeholden7380
    @wadeholden7380 Год назад

    A sxxt ton to do yet

  • @mrsmith2228
    @mrsmith2228 Год назад

    Reds are disappointed its not ready for the first home game but rather be behind than going into another season with that embarrassing old annie rd stand it was awful & embarrassing for a club of our standing

  • @davidlaw899
    @davidlaw899 Год назад

    What a mess, they are under the pump on this Job and nothing finished but so much started. Housekeeping is not good neither is access and egress. LFC have defiantly gone cheap on this. Before you critique my review I have built a stadium. The contractor will have to get more resources to finish this on time, they will then be in attendance snagging for a minimum of 12 months.so sad really.

  • @michaelsenior7858
    @michaelsenior7858 Год назад +2

    IT won't be open until ... next season 2024\2025 .....

  • @bigquinny32
    @bigquinny32 Год назад

    Absolutely miles behind programme. Not a chance of being completely finished until December / January. Another embarrassment for the club.

  • @smakartika81
    @smakartika81 Год назад

    nowhere near completion