Graffiti art | 2nd main line Munich: Construction site for the west tunnel portal

Поделиться
HTML-код
  • Опубликовано: 8 фев 2024
  • Creation of graffiti art (WOGRA-M) in the video.
    The construction site for the West Tunnel Portal is located directly on the tracks of the main line in Munich. When taking the S-Bahn from Hirschgarten towards Donnersbergerbrücke you can get a particularly good view of the art on the wall of the interim storage facility.
    2. Main route Munich
    The core of the railway expansion in the Munich region:
    At Munich Central Station, the second main line will run under all existing platform levels. The new S-Bahn station “München Hauptbahnhof” is being built here at a depth of 41 meters. Passengers can access this new station and all other levels quickly and conveniently via a central main entrance. This makes it easier to change between different forms of public transport.
    The Munich S-Bahn transports up to 840,000 passengers every day and covers over 20 million kilometers a year. This makes it one of the largest S-Bahn systems in Germany. The main line, which opened in 1972 for the Olympic Games, is reaching its capacity limits, especially since all S-Bahn trains have to pass under Munich city center through a tunnel. In order to eliminate this bottleneck, a second main line will be built over around ten kilometers between the Laim train stations in the west and Leuchtenbergring in the east. This is intended to relieve pressure on the existing main route, offer an alternative option in the event of a disruption and at the same time enable the introduction of a new express S-Bahn system. The centerpiece is a seven-kilometer-long tunnel that connects the main station and the Ostbahnhof. Coming from Laim, the tunnel disappears underground shortly before the Donnersberger Bridge and reappears on the surface between Ostbahnhof and Leuchtenbergring. In addition to the two transfer stations Laim and Leuchtenbergring, which will be rebuilt during ongoing operations, the three new underground stations Hauptbahnhof, Marienhof and Ostbahnhof will be completely rebuilt.
    Our LIVE webcam:
    panterral.ink/2teStammleitung
    Virtual tour information center 2nd main route Munich:
    tour.stammroute-muenchen.de/
    Additional Information:
    www.2.stammroute-muenchen.de/
    Film recordings (4K) - drone recordings (film & photo) - photographer - construction site camera - online portal - construction site documentation from panTerra.
    Customer:
    ARGE Tunnel Central Station
    www.2ssm.de/ve30
    DB Netz AG
    www.2.stammleitung-muenchen.de
    -----------------
    Construction site webcam - online portal - construction site documentation from panTerra.
    🧡 Become a channel member and receive exclusive benefits:
    ➡ panterral.ink/join-this-channel
    panTerra.tv - Find us here:
    Website: www.panterra.tv
    Instagram: / panterra.tv
    Facebook: / panterra.tv
    Twitter: / panterratv
    email: socialmedia@panterra.tv
    -
    👨🏼‍💻 Join us! WE ARE LOOKING FOR YOU! (JOBS):
    panterral.ink/jobs
    🎬 Other projects:
    panterral.ink/referenzen
    ℹ️ Further information about our time-lapse videos and online portals:
    panterral.ink/Services
    __________________________________________________
    Copyright | © panTerra GmbH
  • КиноКино

Комментарии •