HS2 Kenilworth road A429 2nd September 2024

Поделиться
HTML-код
  • Опубликовано: 15 сен 2024

Комментарии • 10

  • @ld4244
    @ld4244 12 дней назад +1

    Looks great, can't wait for trains to start running.

  • @starshipwonaprize-dronevideos
    @starshipwonaprize-dronevideos 11 дней назад

    Lots goin on there m8 -have to see the finished product! (Subbed you btw).

  • @MoonRabbitFPV
    @MoonRabbitFPV 11 дней назад +1

    Awesome video 😊👌 new subscriber 😊

  • @1dogtooth
    @1dogtooth 6 дней назад

    I love the way it's right next to the existing line. I live near Southam and 5 or 6 years in and not a metre of track laid from what I can see. It's ironic really that HS2 have constructed more miles of enabling roads than the total length of track to be laid.

  • @davecooper3238
    @davecooper3238 12 дней назад +1

    Thanks for the bonus train.

  • @simoncroft9792
    @simoncroft9792 12 дней назад

    Whats the purpose of leaving those foundations 4:40 underwater?

    • @ld4244
      @ld4244 12 дней назад

      The water is likely used on site, eg dampening down dust, rather than using water from a stream or pipe.

  • @Myrddin1955
    @Myrddin1955 9 дней назад +1

    Truly shocking waste of public money!