I've been waiting for this video for the past 1 week+ now. Great job again Mr Umek. Hope you'll be available to come to Uyo and deliver a masterpiece soon
12:18 does this price includes the N4,596,000? I’m a bit confused because you only mentioned the amount of materials used for the second decking but not the price,of materials.
Normal days left for decking to cure is 21 days, however, based on recommendations from your structural engineer, you could start work on the upper floor even a day after, if you are guaranteed the support is good enough and ensures the wait wouldn’t go to the decking …
For this particular project the decking wood was not reused, we had to continue immediately after decking and didn’t wait for the 21days curing period … but one may decided to wait and reuse which would reduce the cost of the second decking in that case…
The cost for the two stages was mentioned in the Vidoe… the total cost from foundation is coming in the next Vidoe, it was too long and we had to break it into too parts…
Thanks for the update more grace to your hustle
Thank you too
🎉...well detailed and experience on display
Thank you
Good job👍 as always. Very detailed
Thank you! Cheers!
Great work ! I appreciate your supervision of your projects . Thanks
Thank you very much!
I've been waiting for this video for the past 1 week+ now.
Great job again Mr Umek.
Hope you'll be available to come to Uyo and deliver a masterpiece soon
Definitely
Nice vibe brother man ❤💪👌
Thanks 🔥
12:18 does this price includes the N4,596,000? I’m a bit confused because you only mentioned the amount of materials used for the second decking but not the price,of materials.
Please, I have a question: Does this labour cost include your professional fee?
Great work. Is the cost quoted including the plumbing and electricals ?
Yes, it is
So how much will it cost in total to finish the whole house, including labour?
It is stated in today’s video …
I need a 5 bed all en suit bungalow with anteroom..how much should I budget?
Question Sir: how many days after deck casting is recommended before block laying starts?
Normal days left for decking to cure is 21 days, however, based on recommendations from your structural engineer, you could start work on the upper floor even a day after, if you are guaranteed the support is good enough and ensures the wait wouldn’t go to the decking …
Why is the cost of labour and materials higher in the second decking despite re-using marine boards, bamboo, and 2x3 woods?
For this particular project the decking wood was not reused, we had to continue immediately after decking and didn’t wait for the 21days curing period … but one may decided to wait and reuse which would reduce the cost of the second decking in that case…
Thank you for the update
Any time!
Where is this property located?
River state
location?
We are in Port Harcourt but can work in different locations
You will build my house very soon ❤
Can't wait!
Your caption says what it will cost to build a duplex and the video showed something else.
The cost for the two stages was mentioned in the Vidoe… the total cost from foundation is coming in the next Vidoe, it was too long and we had to break it into too parts…
18 length of 16mm rod
35 length of 16mm rod.
Please how many 16mm rods makes 18length and also 35length please 🙏thanks
One length of an iron rod measures approximately 12meters… I hope that answered your question…
@@UmekRealestateyes sir thanks but not really satisfied
Because you mention length in the video and now saying meter