Это видео недоступно.
Сожалеем об этом.

Tandem Crane Lift

Поделиться
HTML-код
  • Опубликовано: 5 дек 2016
  • Tandem Crane Lift and tilt of 12 ton precast panel at 13.8Kv substation

Комментарии • 30

  • @bgklom
    @bgklom 10 месяцев назад

    Beautiful lift

  • @fredramos9206
    @fredramos9206 5 лет назад +4

    Best Coordination, Nice riggin job!

  • @sohaibahmad4193
    @sohaibahmad4193 2 года назад +1

    Thanks for posting sir , remembering my job still

  • @lwazilwakhanhleeng420
    @lwazilwakhanhleeng420 2 года назад

    I like how they used the snatch blocks

  • @janaksharma4104
    @janaksharma4104 4 месяца назад

    Good job

  • @MuhammadImran-qk9il
    @MuhammadImran-qk9il 5 лет назад +3

    Good job rigger I

  • @HemSCC
    @HemSCC 2 года назад +1

    Only need to signal one crane tell other to follow

  • @mode1charlie170
    @mode1charlie170 3 года назад +5

    Crane operators are ignoring the signal guy...thank god

    • @user-jj3tw1sr7o
      @user-jj3tw1sr7o 3 года назад +1

      When Operators ignore Ironworkers' signals while they are connecting iron they get spud wrenches through their windshields.

    • @matthewjdouglas6471
      @matthewjdouglas6471 2 года назад

      Yes that quite normal. But the banks man has to still signal else they would give him a bollocking

    • @keyjam9
      @keyjam9 Год назад

      Correct. He is signaling the right crane to swing into the left crane aggressively.

    • @keyjam9
      @keyjam9 Год назад

      ​@@user-jj3tw1sr7othat's not an ironworker. His signals are 3rd world.

  • @realmebiru5748
    @realmebiru5748 2 года назад

    Mantap

  • @ajazsha7497
    @ajazsha7497 3 года назад +2

    Good

  • @rockofagesusa7942
    @rockofagesusa7942 Год назад

    I never did like hanging those dam things, it’s easy work but trusting those embedded lugs is hairy at best… things may have improved sense I did it though

  • @joaapkochahiyeyhamilega1201
    @joaapkochahiyeyhamilega1201 Год назад

    This is random or telling lifting?

  • @agusliiyoutube7389
    @agusliiyoutube7389 Год назад

    👍🏽👍🏽

  • @Sher-jq2sd
    @Sher-jq2sd 7 месяцев назад

    Experienced rigger he is

  • @nooralamsekh7696
    @nooralamsekh7696 2 года назад

    Crane position wrong tail lift only 12ton

  • @robertonegron6052
    @robertonegron6052 4 года назад +1

    peliculas

  • @mohammedluqman2515
    @mohammedluqman2515 6 лет назад +1

    Wich place??

  • @moycash7124
    @moycash7124 4 года назад +1

    Poor crane signals I'm sorry!!

    • @Donnyjoseph
      @Donnyjoseph 4 года назад

      If it poor then the crane operator will not be able to coordinate the load properly.

    • @shameelali2549
      @shameelali2549 3 года назад

      I agree the drivers weren't listening to him,because his signals were incorrect

  • @chaithanyaalige6675
    @chaithanyaalige6675 2 года назад

    This is not tendam ok

  • @8m405
    @8m405 11 месяцев назад

    It's not tandem lift. It's called tail lift

  • @shivakothakotha3783
    @shivakothakotha3783 3 года назад +1

    Good job