How to create a new project and setup a relative site using LN-150

Поделиться
HTML-код
  • Опубликовано: 23 авг 2023
  • Basic run down of the process of creating a new project; setting up the instrument in a “here position” and connecting to excavator ready to dig

Комментарии • 6

  • @evinubel8817
    @evinubel8817 11 месяцев назад +1

    You're the man! Thank you!

  • @darksidemoto3693
    @darksidemoto3693 5 месяцев назад

    Awesome

  • @the1111machi
    @the1111machi 11 месяцев назад

    Thanks for doing these video’s!

    • @MrTopcon
      @MrTopcon  11 месяцев назад

      No worries at all

  • @jeromeb4756
    @jeromeb4756 11 месяцев назад

    How do you do a resection using surveyor tagets?

    • @MrTopcon
      @MrTopcon  11 месяцев назад

      With the LN-150 it does need to be ground based control or prism based as the LN-150 doesn’t have reflectorless measurement (no scope)
      If you’re wanting to use target based setups you can use the system with GT/PS total stations that are machine control upgraded.