They didn't even considered renew the trolleybus fleet, as it currently happening on ABD Corridor in São Paulo (also, the BRT ABC will operate with 21-meter IMC articulated trolleybuses from Eletra, and will open in 2025). The municipal system is under threat of closure by the current mayor and Santos will return with the Mafersa trolleybus after construction of a second light rail line is completed
They didn't even considered renew the trolleybus fleet, as it currently happening on ABD Corridor in São Paulo (also, the BRT ABC will operate with 21-meter IMC articulated trolleybuses from Eletra, and will open in 2025). The municipal system is under threat of closure by the current mayor and Santos will return with the Mafersa trolleybus after construction of a second light rail line is completed
Nize looking coaches .. hilly cities need electric busses and trams .. shame they have not resumed and extended 😕
Exactly!