Over 32 Yrs l'd like to have a dime for every ft of pipe l've laid, or a penny for every brick laid building structures, and l wouldn't need to win any lottery! The deepest structure l've built is 22ft deep, build 5 ft backfill, let set a day, compact, and the process all over again. I like watching the different situations you work through to get the job done!
I enjoy watching the construction of pipeline especially ones with a diameter of over 40 inches. I guess the pipe to the rigjt is the sewer and the left is the storm, or the one to the right is a lateral line for runoff and connects to the large pipe.
Next month I’ve got a 5 barrel run of 72” class 5 RCP each run 260 LF. It’s for a CSX rail spur, finally gonna get to run a cat 385 to lay it. I’ve laid some 88” HDPE but this will be my biggest RCP yet.
Not if you a good operator, I bale every joint of storm with my bucket no chain or strap non sense. Only thing I do different is I use the bottom of my bucket to push the pipe down.
Over 32 Yrs l'd like to have a dime for every ft of pipe l've laid, or a penny for every brick laid building structures, and l wouldn't need to win any lottery! The deepest structure l've built is 22ft deep, build 5 ft backfill, let set a day, compact, and the process all over again. I like watching the different situations you work through to get the job done!
Agree!
I enjoy watching the construction of pipeline especially ones with a diameter of over 40 inches.
I guess the pipe to the rigjt is the sewer and the left is the storm, or the one to the right is a lateral line for runoff and connects to the large pipe.
Next month I’ve got a 5 barrel run of 72” class 5 RCP each run 260 LF. It’s for a CSX rail spur, finally gonna get to run a cat 385 to lay it. I’ve laid some 88” HDPE but this will be my biggest RCP yet.
Dafaq!!!! Omg you got power for the whole town in that hole.. I Bet they told you there was know electrical to worry about… 😂😂
That’s not power it’s fibre optic
Looks alright to me
Going to chop the pipe using cutting edge to push down on pipe. And sending pipe home without strap or chain. Is taking a risk of breaking pipe also.
Not if you a good operator, I bale every joint of storm with my bucket no chain or strap non sense. Only thing I do different is I use the bottom of my bucket to push the pipe down.
@@dlogan3004 try that in -40 with PVC and watch what happens.
These guys are rookies what is that electric or cable that he just grabs with no line gloves on
Street lighting
How many health and safety issues?
Yes!
Jesus ruff as 😮
I think a hard hat must be worn in other countries in this work.
En que parte de usa están??
No shit
very amazing
use a digging bar not ur foot to drive it home!
You can’t bale storm with a fuckin bar lol
Hard hat? He did break the pipe
13.30, pressing on a concrete pipe with a 30 ton machine is never good practice,
That's not quality Management in lay pipe. 👎
Why