Pipe Layer pov

Поделиться
HTML-код

Комментарии • 44

  • @bluecollarguy4206
    @bluecollarguy4206 3 года назад +4

    I've never seen a pipe layed slower in my life

    • @gallihyde
      @gallihyde 2 года назад

      This kids a novice no question.... Terrible hand signs and the theres no sychronization between the operator and grademan

  • @Wiperfisherman01
    @Wiperfisherman01 6 лет назад +10

    how are these guys still in business?!?!?! worst pipe laying I have seen

    • @marcoshernandez4352
      @marcoshernandez4352 5 лет назад +1

      I can do it better than this guys and i'm only 18 years old

  • @jcubray8718
    @jcubray8718 5 лет назад +5

    There was so many things that made me smh in this video I had to come to the comments section 🤦🏻‍♂️. He used a grade pole to set the pipe alright cool. And he went a kinda deep to set the gravel but alright cool, but then he let the excavator push the pipe in and create a bend to the previous pipe. So now if that creates backflow ur going to have to go fix that one too and then come back and make sure this ones set to grade.
    Bro just advice (don’t have to take it), but a Bar with a 2x4 (so you doesnt damage the bevo) works a lot better and faster. If it’s RCP or something else your laying I understand. But for PVC just use a bar.

    • @judeathknowshisgun5290
      @judeathknowshisgun5290 3 года назад

      I just set the Spigot end right inside the beginning of the bell and stab it myself by using my body weight don’t need a machine to stab pipe this light tbh

  • @CarlosGarcia-co1if
    @CarlosGarcia-co1if 6 лет назад +5

    The entire line moved a couple of times smh

  • @Mrunlucky0000
    @Mrunlucky0000 6 лет назад +1

    Nice love this

  • @terrancerobertson5224
    @terrancerobertson5224 2 года назад +1

    I can’t believe buddy used excavator to butt the pipe..

  • @adamorozco5751
    @adamorozco5751 4 года назад +2

    “Where’d he go?!?” Probably to go work for a real company!

  • @1436am
    @1436am 5 лет назад +1

    Ahh i remember my first day

  • @bozoone4464
    @bozoone4464 3 года назад

    Pretty cool to see the Larbor view. Would of been way better if they did more then one joint in 17 mins though

  • @davidhalliday616
    @davidhalliday616 8 месяцев назад

    Got it!!! Yea I’d say ha

  • @bradleynoneya7223
    @bradleynoneya7223 3 года назад

    Wow!! A whole lotta pipe guys up here talk wild!?! Things happen every stick of pipe you lay, only problem I had was I didn’t see any 1 foot marks on your pipes. Shit happen stay safe my pipefam

  • @Centralpanther82
    @Centralpanther82 9 лет назад +1

    Do you use a pipe laser and what size sdr is that 10 or 12?

    • @1436am
      @1436am 5 лет назад +1

      They have no clue lol

    • @jamespetrini
      @jamespetrini 5 лет назад +1

      it looks small like 8" and don't look like they were using a pipe laser they did it old school with the level on top lmao

  • @LUTHERJ304
    @LUTHERJ304 5 лет назад +2

    We almost broke "another bell" and u had dirt in pipe. Ground guy needs to step up before you call yourself pipelayer. Dont be scared to tell lil hand signals dont always respond as fast

  • @jamespetrini
    @jamespetrini 5 лет назад

    If I laid pipe like that when I was doing it, I would have been sent packing! no pipe laser? I used to be able to watch the laser dot on the bucket to get the rough grade then have him line the trench with stone and set the grade with the pole and moving the stone with my boot have the top guy slide me a length of pipe get it started in the bell and home it from the bell end with a bar and put the target in it and bullseye it and give him the sign to stone it in place its good these guys are like the bad news bears of sewer main construction lmao!

  • @seanmccarthy1421
    @seanmccarthy1421 5 месяцев назад

    Can you push the pipe in yourself 😂

  • @allaindaigle1682
    @allaindaigle1682 5 лет назад +3

    Why did you make him dig to China?? Gravel must be free

    • @wailnshred
      @wailnshred 4 года назад

      I think the bottom was extremely soft.

  • @HectorHernandez-ye6ml
    @HectorHernandez-ye6ml 2 года назад

    First day or last day

  • @travisslowtalker7868
    @travisslowtalker7868 5 лет назад

    Using straight line with out a pipelazer, wth

    • @popstar7448
      @popstar7448 2 года назад

      He had the target in his hand 🤔 I’m just lost

  • @popstar7448
    @popstar7448 2 года назад

    Dig in front of your pipe let the machine do the rest to dam slow

  • @NaztyDog
    @NaztyDog 5 лет назад +1

    Its a joke

  • @howardhancock1825
    @howardhancock1825 5 лет назад +2

    What the hell do you call this.pipelayers kindergarten.no wait pre school.

  • @brianmeenan8069
    @brianmeenan8069 11 месяцев назад

    Painful to watch 🙈

  • @quataliachaney4573
    @quataliachaney4573 4 года назад

    Looks sloppy but holy shit .....its solid. Wtf?

  • @trevorhollman1527
    @trevorhollman1527 6 лет назад +2

    I agree.... that has to be the worst display of pipe laying I have ever seen, slow as hell and sloppy work I’ve never seen anyone grade pipe like that, they have to be out of business by now, guys this is not how you lay mainline.... I could have layed 16 meters in the time it took them to lay 4 meters,

    • @StetsonReese
      @StetsonReese 5 лет назад +1

      Trevor Hollman I agree completely. Single stacked trenchbox that top man puts it down by hand and you sling it on your should and roll. Send that shit in with a digging bar

    • @1436am
      @1436am 5 лет назад +3

      8 min in and the stone isn't even in. My foreman would be flipping shit lol

    • @judeathknowshisgun5290
      @judeathknowshisgun5290 3 года назад

      @@1436am depends on the operator too I’ve had a couple hoe hands slow me down

    • @1436am
      @1436am 3 года назад

      @@judeathknowshisgun5290 that is definitely a huge set back lazy laborers haha