Land development in Karlskrona, Sweden, with hydraulic rock splitter HRB-1000
HTML-код
- Опубликовано: 23 ноя 2024
- Removing around 3000 m3 for a new parking garage. Split hole spacing is roughly 700 x 700 mm and 102 mm diameter. Around 100 m3 per shift with one drill and one excavator for both splitting and mucking.