COBRA engine change | HYDRO Systems

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • Trent 1000 engine change with the COBRA system from HYDRO Systems at ANA Airways, Haneda International Airport, Japan

Комментарии • 2

  • @dustinmiller1002
    @dustinmiller1002 4 года назад +2

    I used this system for several years. It cut out engine install time from 1 hour per engine to about 15 minutes and from a 5 or 6 person crew to 3.

  • @jourellbacani9793
    @jourellbacani9793 3 года назад

    We changed 787 engine with a boot strap in a 10 hour shift 🤷🏽‍♂️🤷🏽‍♂️🤷🏽‍♂️ no cobra needed 😂