Garden Train Trestle Test Run

Поделиться
HTML-код
  • Опубликовано: 27 окт 2024
  • Garden Train 2.0 is progressing well. We are still waiting on the river rock that will be the base layer for the whole layout. But we wanted to test out as much as possible now. Here is the entire temporary layout with most of the trestle bridge. Using rocks from a local farmer's field (Thanks Reeses), we will have a natural looking 4% grade leading up to the trestle bridge.
    Next week the whole layout has to be taken out to make way for the river rocks. When the track is reinstalled, ballast will be added under the track and everything will be straightened and leveled.
    www.TrustyTrai...
    Questions or comments: conductor@trustytraintracks.com

Комментарии •